Horizontal directional drilling under Guldborgsund and Roskilde Fjord
Titre original de l'avis
Denmark – Test drilling and boring work – Installation of pipes with horizontal directional drilling (HDD) under Guldborgsund and Roskilde Fjord - 23/03722
Score d'opportunité
Pourquoi ce score ?
Opportunité
67 / 100
Complexité
86 / 100
Facteurs de risque
Structured data gives a submission deadline of 2026-07-10 10:00 UTC, while the XML notice says the prequalification dea...
The XML notice states the reference validity period was extended from 5 to 10 years and steel pipe references may be ac...
Analyse approfondie du portefeuille
Utilise:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Aperçu
Moderate opportunityFaits clés
- DKK 147M estimated value
- Works contract
- 2 lots
- Horizontal directional drilling works for installation of PE pipes for cable crossings.
- Installation of both smaller inner pipes and the larger outer pipe.
Afficher le résumé complet
Negotiated works contract for HDD installation of PE pipes for two cable crossings in Denmark: Lot 1 across Guldborgsund and Lot 2 across Roskilde Fjord. The estimated total value is 147,000,000 DKK. Electronic submission is required and the notice is in English. The tender includes strict technical, organizational, and selection requirements, and documents were not fully analyzed beyond extracted notice text and structured data.
Risques
Structured data gives a submission deadline of 2026-07-10 10:00 UTC, while the XML notice says the prequalification dea...
The XML notice states the reference validity period was extended from 5 to 10 years and steel pipe references may be ac...
L'analyse peut être incomplète
Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.
Exigences clés
Technical
- Prices must be stated in EUR, exclusive of VAT but inclusive of all other expenses.
- The tender is in English.
Administrative
- Electronic submission is required.
Critères d'attribution
Lot 1
Lot 2
Acheteur
Localisation
Fredericia, DNK
Profil acheteur
Identifiant
39314878
Activité
Electricity-related activities
Lots (2)
LOT-0001
Guldborgsund cable crossings
HDD installation of two pipe sets for new 145 kV cable systems and fiber connections across Guldborgsund, including Pipe #1 Falster–Lolland (estimated length 1,254 m) and Pipe #2 Falster–Lolland (estimated length 1,207 m). Scope covers both inner pipes and the outer pipe. Information comes from structured data and notice text.
EUR 19.7M
Valeur estimée
Localisation
Durée
Catégorie
Critères d'attribution
Date limite
Détails des critères
Price Prices must be stated in the attached Schedule of Prices and the defined price elements must be completed herein. Prices must be stated exclusive of VAT but inclu-sive of all other expenses associated with the purchase. Prices must be stated in EUR. When evaluating 'Price', the Contracting Authority will eval-uate the total cost - Total Tender Price, cf. Schedule of Prices.
Technical solution Technical description The evaluation will be based on the submitted technical description, including method statements specifications and descriptions which demonstrate the technical level for executing the works specified in the tender documents. The work shall be based on a tender engineering ap-proach ensuring that that the proposed drilling setup is robust even if the soil characteristics differ from the expected. The tenderer must include Method Statements and engineering reports from the Pre-FEED covering all phas-es of the Works. Reference is made to Technical Requirements (doc. no. 23/03722-1) The evaluation will be based on the degree of detail and the technical level of specifications and the level of content in the Method Statement(s). It will be evaluated positive if the tenderer submits detailed descriptions that in content and clarity demonstrate fulfil-ment of all technical requirements stated in the tender documents. Further, it will be evaluated positive that the approach and chosen solutions underline the tenderer’s ability and use of competences to execute the works, es-pecially concerning: • Assessment of technical and environmental risks and proposed mitigations • Quality plan • Method statements • Engineering document proving that the proposed drilling setup is robust even if the soil characteris-tics differ from the expected • Contingency plans for handling blow-outs • Specification of specialized equipment and drilling rigs and drilling bits, including considerations con-cerning redundancy of key equipment • Specification of materials to be used • Specification of PE pipe configuration • Specification of the PE pipes proposed. • Specification of drilling mud • Specification of seals • State the anticipated amount of water for per-forming the drilling • Preliminary drawings of drilling profile • Specifications of working areas Specification of onshore spread
Organization As the Works is of immense importance for the Client, the tenderer must enclose CVs of the key personnel who will be allocated to the Works. The following are considered as key personnel: • Project manager • Site staff foreman • HSE responsible • H&S Coordinator (AMK-B) • Quality Manager The tenderer is encouraged to highlight only the expertise and experience for each key personnel relevant for the position in the respective CVs (e.g. educational back-ground, experience within that position, experience with similar assignments etc.). Further, the tenderer should submit an Organization Plan. The Organization Plan should include a detailed description of the project specific organizational struc-ture down to site staff foreman level which will be allocated to the Works during all phases of the Works. The Organization Plan description should describe: • The overall structure, including hierarchy and procedures for escalation. • Lines of communication, internally and external-ly • Interfaces towards the Contracting Authority. • How the tenderer will secure coverage of all po-sitions at all time The Organization Plan must be described in detail as well as visualized in a project specific organization chart. The evaluation of key personnel will be based on the degree to which the experience and professional qualifications of the individual key personnel is up to date, relevant in respect of the performance and position of the specific assignment. As such a relevant educational background combined with relevant roles in recent projects of similar characteristics will be evaluated positively. Further, the evaluation will focus on to which degree the individual key personnel will be involved in the fulfilment of the assignment and how the key personnel complement each other. The evaluation of the Organization Plan will be based on the degree of detail and • On whether the proposed plan is project specific, operational, efficient, robust and with clear lines of communication. • On whether the organization is well-structured with coverage for all interfaces taking into consid-eration the complexity of the Works • On the coverage of all positions and possibility to scall in manpower during execution in order to ful-fil the project time schedule An overall evaluation will be made of this sub-criterion.
Time Schedule for the Works The tenderer should include the Project Time Schedule in the tender. The Project Time Schedule must be project specific and include all activities executed by the tenderer concerning the Works. The tenderer should as part of the sub-criteria include a detailed and robust time schedule for each lot which outlines how the works will be structured through FEED and Detailed Engineering, construction and pipe installation phases, and delivery of as-built documentation. Delays associated with inspections and verifications shall be made clear, if known. The time schedule should contain relevant project milestones including the milestones outlined in the tender documents. Reference is made to the Time Schedule for the relevant LOT (LOT 1: 23/03722-34 or LOT 2: 23/03722-35). The time schedule should be included both in the form of a chart (GANTT-diagram) with clarifications as needed, in a supporting and elaborate description. The evaluation of the Time Schedule will be based on the level of detail and robustness/timeliness for all phases of the Works. The evaluation of the detailed Project Time Schedule pre-pared by the tenderer and included in the tender will be based on the degree of detail and division into sub-tasks to prove for the Employer, that the Contractor has the capacity to do the Works in accordance within the time frame specified in the Clients Time Schedule(s). The Contracting Authority will evaluate the degree to which the tender demonstrates a well-planned, realistic and ro-bust time schedule, which allows sufficient time for potential schedule contingencies, but still provides evidence of a high level of security for delivery within the timeframe as set out in the Tender Documents. In this context it will be evaluated positive that: - the description and schedule reflect a realistic, but front-loaded schedule for the critical activities - hazardous activities are not performed concurrently in the same location - the division into sub-sections ensures that the ten-derer has the capacity to perform in accordance with the overall project time schedule. the description and schedule reflect the tenderer’s ability to catch-up on delays and shows activities to activate
Contract terms For the evaluation of the sub-criteria the tenderer is allowed to propose deviations to the elements of the contract identified as competitive elements in the contract terms. The contract terms consist of: • Contract Agreement for Guldborgsund, doc.no. 23/03722-15 (lot 1) • Contract Agreement for Roskilde Fjord, doc.no. 23/03722-38 (lot 2) • Appendix 1 [General Conditions based on AB18], doc.no. 23/03722-16 (both lots) The deviations should be enclosed in the clarification list c.f. doc.no. 23/03722-6 and be included in the spreadsheet marked “Legal clarification”. The submitted clarification list should be clearly marked “Lot 1” or “Lot 2”. The proposed deviations should be explicit and with explanation as to why they are made. The tendered contract must be performed on the basis of the contract terms. The tenderer is allowed to propose explicit and well-explained deviations to the following listed competitive elements: - In the Contract Agreements, doc.no. 23/03722-15 (lot 1) and doc.no. 23/03722-38 (lot 2): • Section 5 [Contract Data] In terms of: Liquidated damages and maximum liquidated damages (Clause 40, subclause (2)) under [Clause 40. The contractor’s liability in case of delay] - In Appendix 1 [General Conditions based on AB18], doc.no. 23/03722-16 (both lots): • Clause 12 [Services to be provided by the contractor] • Clause 26 [Obstacles] • Clause 31. Construction meetings • Chapter E [Extension of time and delay] • Chapter F [Handover] • Chapter G [Defects] • Clause 59 [The client’s right to terminate the contract] Deviations to these elements will be included in the evaluation and it is noted that any deviations may lead to a reduction of the score depending on the content, clarity, and consequence of the deviation. In this regard it is explicitly noted that deviations which are intended to limit liability and shift the financial risk in favour of the tenderer will be of particular importance in the evaluation. If the tenderer has no deviations to the contract terms, the maximum score of 10 will be awarded. An overall evaluation for each lot will be made of this sub-criterion.
Codes CPV supplémentaires
Note sur la valeur
Afficher les données TED originales
Titre original du lot
Lot 1 - Cable crossings for new 145 kV cable systems and fiber connections across Guldborgsund
Description TED originale
Two pipe sets, two power cable systems oPipe #1 from Falster to Lolland. Estimated length 1,254 m oPipe #2 from Falster to Lolland. Estimated length 1,207 m
LOT-0002
Roskilde Fjord cable crossings
HDD installation of one pipe set for new 145 kV cable systems and fiber connections across Roskilde Fjord, with Pipe #1 from Roskilde Fjord West to East landings (estimated length 1,755 m). Scope covers both inner pipes and the outer pipe. Information comes from structured data and notice text.
EUR 19.7M
Valeur estimée
Localisation
Durée
Catégorie
Critères d'attribution
Date limite
Détails des critères
Price Prices must be stated in the attached Schedule of Prices and the defined price elements must be completed herein. Prices must be stated exclusive of VAT but inclu-sive of all other expenses associated with the purchase. Prices must be stated in EUR. When evaluating 'Price', the Contracting Authority will eval-uate the total cost - Total Tender Price, cf. Schedule of Prices.
Technical solution The evaluation will be based on the submitted technical description, including method statements specifications and descriptions which demonstrate the technical level for executing the works specified in the tender docu-ments. The work shall be based on a tender engineering ap-proach ensuring that that the proposed drilling setup is robust even if the soil characteristics differ from the expected. The tenderer must include Method Statements and engineering reports from the Pre-FEED covering all phas-es of the Works. Reference is made to Technical Requirements (doc. no. 23/03722-1) The evaluation will be based on the degree of detail and the technical level of specifications and the level of content in the Method Statement(s). It will be evaluated positive if the tenderer submits detailed descriptions that in content and clarity demonstrate fulfil-ment of all technical requirements stated in the tender documents. Further, it will be evaluated positive that the approach and chosen solutions underline the tenderer’s ability and use of competences to execute the works, es-pecially concerning: • Assessment of technical and environmental risks and proposed mitigations • Quality plan • Method statements • Engineering document proving that the proposed drilling setup is robust even if the soil characteris-tics differ from the expected • Contingency plans for handling blow-outs • Specification of specialized equipment and drilling rigs and drilling bits, including considerations con-cerning redundancy of key equipment • Specification of materials to be used • Specification of PE pipe configuration • Specification of the PE pipes proposed. • Specification of drilling mud • Specification of seals • State the anticipated amount of water for per-forming the drilling • Preliminary drawings of drilling profile • Specifications of working areas Specification of onshore spread
Organization As the Works is of immense importance for the Client , the tenderer must enclose CVs of the key personnel who will be allocated to the Works. The following are considered as key personnel: • Project manager • Site staff foreman • HSE responsible • H&S Coordinator (AMK-B) • Quality Manager The tenderer is encouraged to highlight only the expertise and experience for each key personnel relevant for the position in the respective CVs (e.g. educational back-ground, experience within that position, experience with similar assignments etc.). Further, the tenderer should submit an Organization Plan. The Organization Plan should include a detailed description of the project specific organizational structure down to site staff foreman level which will be allocated to the Works during all phases of the Works. The Organization Plan description should describe: • The overall structure, including hierarchy and procedures for escalation. • Lines of communication, internally and external-ly • Interfaces towards the Contracting Authority. • How the tenderer will secure coverage of all po-sitions at all time The Organization Plan must be described in detail as well as visualized in a project specific organization chart. The evaluation of key personnel will be based on the degree to which the experience and professional qualifications of the individual key personnel is up to date, relevant in respect of the performance and position of the specific assignment. As such a relevant educational background combined with relevant roles in recent projects of similar char-acteristics will be evaluated positively. Further, the evaluation will focus on to which degree the individual key personnel will be involved in the fulfilment of the assignment and how the key personnel complement each other. The evaluation of the Organization Plan will be based on the degree of detail and • On whether the proposed plan is project specific, operational, efficient, robust and with clear lines of communication. • On whether the organization is well-structured with coverage for all interfaces taking into consideration the complexity of the Works • On the coverage of all positions and possibility to scall in manpower during execution in order to fulfil the project time schedule An overall evaluation will be made of this sub-criterion
Time Schedule for the Works The tenderer should include the Project Time Schedule in the tender. The Project Time Schedule must be project specific and include all activities executed by the tenderer concerning the Works. The tenderer should as part of the sub-criteria include a detailed and robust time schedule for each lot which outlines how the works will be structured through FEED and Detailed Engineering, construction and pipe installation phases, and delivery of as-built documentation. Delays associated with inspections and verifications shall be made clear, if known. The time schedule should contain relevant project milestones including the milestones outlined in the tender documents. Reference is made to the Time Schedule for the relevant LOT (LOT 1: 23/03722-34 or LOT 2: 23/03722-35). The time schedule should be included both in the form of a chart (GANTT-diagram) with clarifications as needed, in a supporting and elaborate description. The evaluation of the Time Schedule will be based on the level of detail and robustness/timeliness for all phases of the Works. The evaluation of the detailed Project Time Schedule prepared by the tenderer and included in the tender will be based on the degree of detail and division into sub-tasks to prove for the Employer, that the Contractor has the capacity to do the Works in accordance within the time frame specified in the Clients Time Schedule(s). The Contracting Authority will evaluate the degree to which the tender demonstrates a well-planned, realistic and robust time schedule, which allows sufficient time for potential schedule contingencies, but still provides evidence of a high level of security for delivery within the timeframe as set out in the Tender Documents. In this context it will be evaluated positive that: - the description and schedule reflect a realistic, but front-loaded schedule for the critical activities - hazardous activities are not performed concurrently in the same location - the division into sub-sections ensures that the tenderer has the capacity to perform in accordance with the overall project time schedule. the description and schedule reflect the tenderer’s ability to catch-up on delays and shows activities to activate
Contract terms For the evaluation of the sub-criteria the tenderer is allowed to propose deviations to the elements of the contract identified as competitive elements in the contract terms. The contract terms consist of: • Contract Agreement for Guldborgsund, doc.no. 23/03722-15 (lot 1) • Contract Agreement for Roskilde Fjord, doc.no. 23/03722-38 (lot 2) • Appendix 1 [General Conditions based on AB18], doc.no. 23/03722-16 (both lots) The deviations should be enclosed in the clarification list c.f. doc.no. 23/03722-6 and be included in the spreadsheet marked “Legal clarification”. The submitted clarification list should be clearly marked “Lot 1” or “Lot 2”. The proposed deviations should be explicit and with explanation as to why they are made. The tendered contract must be performed on the basis of the contract terms. The tenderer is allowed to propose explicit and well-explained deviations to the following listed competitive elements: - In the Contract Agreements, doc.no. 23/03722-15 (lot 1) and doc.no. 23/03722-38 (lot 2): • Section 5 [Contract Data] In terms of: Liquidated damages and maximum liquidated damages (Clause 40, subclause (2)) under [Clause 40. The contractor’s liability in case of delay] - In Appendix 1 [General Conditions based on AB18], doc.no. 23/03722-16 (both lots): • Clause 12 [Services to be provided by the contractor] • Clause 26 [Obstacles] • Clause 31. Construction meetings • Chapter E [Extension of time and delay] • Chapter F [Handover] • Chapter G [Defects] • Clause 59 [The client’s right to terminate the contract] Deviations to these elements will be included in the evaluation and it is noted that any deviations may lead to a reduction of the score depending on the content, clarity, and consequence of the deviation. In this regard it is explicitly noted that deviations which are intended to limit liability and shift the financial risk in favour of the tenderer will be of particular importance in the evaluation. If the tenderer has no deviations to the contract terms, the maximum score of 10 will be awarded. An overall evaluation for each lot will be made of this sub-criterion.
Codes CPV supplémentaires
Note sur la valeur
Afficher les données TED originales
Titre original du lot
Lot 2 - Cable crossings for new 145 kV cable systems and fiber connections across Roskilde Fjord
Description TED originale
Roskilde Fjord: One pipe set, one power cable system oPipe #1 from Roskilde Fjord West – East landings. Estimated length 1,755 m Tenders can be submitted for one or all partial agreements
Détails de la procédure
- Date de publication
- 11 Jun 2026
- Langues
- English
Métadonnées de référence
- Base juridique
- 32014L0025
Identifiants de référence
- ID de l'appel d'offres
- 405713-2026
Documents (1)
Appels d'offres similaires
Germany – Installation of cable infrastructure – Verlegung TK-Kabel mit Anpassung Kabelweg, BA 1, Streck 4000, km 209,1-km 214,3
Czechia – Geotechnical engineering services – Rámcová dohoda na služby GTP menších staveb pozemních komunikací 2026
France – Installation of cable infrastructure – Fourniture et la mise en œuvre d’un dispositif de vidéo protection de la voie publique, le Maintien en Conditions Opérationnelles, l’assistance et prestations de services associées sur le territoire communal de La Ville-aux-Dames.
Poland – Construction work – Zaprojektowanie, budowa i wyposażenie (dostawa i instalacja systemów i urządzeń) linii kolejowych dużych prędkości nr 85 i 86 w zakresie branż KSRK, teletechnika oraz branż towarzyszących
Norway – Telecommunications cable and equipment – Framework agreement for computer cabling services and accompanying materials
Denmark – Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork – Ny bane over Vestfyn - 92900.770 - 25kV Kabelforbindelse
Score d'opportunité
Pourquoi ce score ?
Opportunité
67 / 100
Complexité
86 / 100
Facteurs de risque
Structured data gives a submission deadline of 2026-07-10 10:00 UTC, while the XML notice says the prequalification dea...
The XML notice states the reference validity period was extended from 5 to 10 years and steel pipe references may be ac...