Dynamic purchasing system for construction works
Titre original de l'avis
United Kingdom – Construction work – Dynamic Purchasing System (DPS) for Construction and Development Works
Score d'opportunité
Pourquoi ce score ?
Opportunité
50 / 100
Complexité
75 / 100
Facteurs de risque
Critical information missing: estimated value, award criteria, selection criteria, and required documents. This prevent...
DPS with 7 lots and multiple possible buyers may lead to complex and varied call-off procedures.
Restricted procedure — pre-qualification required
Analyse approfondie du portefeuille
Utilise:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Aperçu
Moderate opportunityFaits clés
- Dynamic Purchasing System (DPS)
- Works contract
- 3 lots
- Duration until Feb 2029
- Construction and development works including new build, demolition, renovation, refurbishment, extensions, conversions, repair, and maintenance.
- DPS covers housing, health, education, libraries, civic, community, and commercial buildings.
Afficher le résumé complet
This is a Dynamic Purchasing System (DPS) for construction and development works in the UK, established by Prosper as a central purchasing body. The DPS is open for use by various public sector bodies and covers 7 lots: Demolition and Dismantling Services, Land Remediation, Full Groundworks Services, Construction Services (up to £1M), Construction Services (over £1M), Modern Methods of Construction, and Principal Contractor (Full Management Service). The DPS runs from 2019 to 2029. No estimated values, award criteria, or selection criteria are provided in the available data. The notice is an update changing deadlines and the buyer's address.
Risques
Critical information missing: estimated value, award criteria, selection criteria, and required documents. This prevent...
DPS with 7 lots and multiple possible buyers may lead to complex and varied call-off procedures.
Restricted procedure — pre-qualification required
L'analyse peut être incomplète
Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.
Exigences clés
Technical
- DPS open for use by Prosper's members and other UK public sector contracting bodies.
- Suppliers must register via the ProContract portal: Ouvrir le portail
- No variants allowed.
Les exigences peuvent être incomplètes.
Acheteur
Nom
Localisation
Newcastle upon Tyne, GBR
Site web
Profil acheteur
Identifiant
06597839
Activité
General public services
Lots (7)
LOT-0001
Demolition and Dismantling Services
Comprehensive demolition and dismantling services, including earthworks.
Localisation
Durée
Catégorie
Date limite
Détails des critères
This category is to cover the provision of comprehensive demolition and dismantling services, including earthworks.
Codes CPV supplémentaires
Note sur la valeur
Afficher les données TED originales
Description TED originale
This category is to cover the provision of comprehensive demolition and dismantling services, including earthworks.
LOT-0002
Land Remediation
Land remediation and decontamination services including bioremediation, chemical treatments, physical treatments, jet grouting, and remediation feasibility testing, in compliance with environment agency standards.
Localisation
Durée
Catégorie
Date limite
Détails des critères
This category is to cover the provision of land remediation and decontamination services including but not limited to: — bioremediation, — chemical treatments, — physical treatments, — jet grouting, — remediation feasibility testing. All land remediation activities must be in compliance with environment agency standards and regulations and any other relevant regulation or legislation effective during the lifetime of the DPS.
Codes CPV supplémentaires
Note sur la valeur
Afficher les données TED originales
Description TED originale
This category is to cover the provision of land remediation and decontamination services including but not limited to: — bioremediation, — chemical treatments, — physical treatments, — jet grouting, — remediation feasibility testing. All land remediation activities must be in compliance with environment agency standards and regulations and any other relevant regulation or legislation effective during the lifetime of the DPS.
LOT-0003
Full Groundworks Services
Comprehensive groundworks including elements from Lots 1 and 2, plus sub-structure, ground stabilisation, drainage, utilities, roads, sewers, and landscaping.
Localisation
Durée
Catégorie
Date limite
Détails des critères
This category is to cover the provision of comprehensive Groundworks services. Incorporating all elements covered by Lot 1 and Lot 2 this category also includes but not limited to all sub-structure and ground stabilisation works, services including drainage, utilities, roads and sewers, landscaping services.
Codes CPV supplémentaires
Note sur la valeur
Afficher les données TED originales
Description TED originale
This category is to cover the provision of comprehensive Groundworks services. Incorporating all elements covered by Lot 1 and Lot 2 this category also includes but not limited to all sub-structure and ground stabilisation works, services including drainage, utilities, roads and sewers, landscaping services.
LOT-0004
Construction Services (up to 1 000 000 GBP)
This category is for all types of building and construction works with a total contract value up to 1 000 000 GBP.
Localisation
Durée
Catégorie
Détails des critères
This category is for all types of building and construction works with a total contract value up to 1 000 000 GBP.
Codes CPV supplémentaires
LOT-0005
Construction Services (Over 1 000 000 GBP)
This category is for all types of building and construction works with a total contract value over 1 000 000 GBP.
Localisation
Durée
Catégorie
Détails des critères
This category is for all types of building and construction works with a total contract value over 1 000 000 GBP.
Codes CPV supplémentaires
LOT-0006
Modern Methods of Construction
This category is intended to provide the opportunity to utilise a range of Modern Methods of Construction (MMC) to build a range of residential, commercial and industrial properties including but not limited to: — volumetric construction, — pods, — panelised systems, — hybrid construction, — sub-assemblies and components, — site-based MMC. The category is open to manufacturers and/or Contractors with distribution/use agreements in place with manufacturers. The scope of this lot is deemed to include all current and any emerging or new innovations in methods of construction that may emerge during the term of the DPS.
Localisation
Durée
Catégorie
Détails des critères
This category is intended to provide the opportunity to utilise a range of Modern Methods of Construction (MMC) to build a range of residential, commercial and industrial properties including but not limited to: — volumetric construction, — pods, — panelised systems, — hybrid construction, — sub-assemblies and components, — site-based MMC. The category is open to manufacturers and/or Contractors with distribution/use agreements in place with manufacturers. The scope of this lot is deemed to include all current and any emerging or new innovations in methods of construction that may emerge during the term of the DPS.
Codes CPV supplémentaires
LOT-0007
Principal Contractor (Full Management Service)
This category covers the requirement of a contracting body to appoint a principal Contractor to control and manage an entire project and includes the scope of activities of all categories. Principal Contractors must comply with the duties and requirements of CDM 2015. Principal Contractors may need to work with a principal designer and/or accept novated designs. The scope of this lot also includes the provision of design services (principal designer) where a contracting body seeks to engage on a “Design and Build” basis.
Durée
Catégorie
Détails des critères
This category covers the requirement of a contracting body to appoint a principal Contractor to control and manage an entire project and includes the scope of activities of all categories. Principal Contractors must comply with the duties and requirements of CDM 2015. Principal Contractors may need to work with a principal designer and/or accept novated designs. The scope of this lot also includes the provision of design services (principal designer) where a contracting body seeks to engage on a “Design and Build” basis.
Codes CPV supplémentaires
Détails de la procédure
- Date de publication
- 15 Sep 2025
- Langues
- English
Métadonnées de référence
- Base juridique
- 32014L0024
Identifiants de référence
- ID de l'appel d'offres
- 604536-2025
Documents (1)
Appels d'offres similaires
Finland – Architectural, construction, engineering and inspection services – Tietomallikoordinaattori-, inventointimittaus- ja mallinnuspalvelujen puitejärjestely 2026-2028 (2028-2030)
Spain – Architectural, construction, engineering and inspection services – Redacción del Proyecto Básico y de Ejecución, Redacción del Estudio de Seguridad y Salud y Dirección de Obra para la construcción del I.E.S. Nº 1 de 12+0 uds. (Fase 1) en la urbanización El Bosque de Pioz (Guadalajara).
France – Construction work for school buildings – Travaux d'extension et rénovation complète du collège Charles EXBRAYAT à LA GRAND CROIX
Poland – Road construction works – Rozbudowa drogi krajowej nr 22 na odcinku Malbork -Królewo
Belgium – Architectural, construction, engineering and inspection services – Aanstellen ontwerper-Bouw van een nieuwe brandweerkazerne en omgevingswerken te Lede
France – Earthmoving work – Travaux d'aménagement des espaces publics du secteur Ouest de la ZAC Les Vergnes à Clermont-Ferrand - 63000
Score d'opportunité
Pourquoi ce score ?
Opportunité
50 / 100
Complexité
75 / 100
Facteurs de risque
Critical information missing: estimated value, award criteria, selection criteria, and required documents. This prevent...
DPS with 7 lots and multiple possible buyers may lead to complex and varied call-off procedures.
Restricted procedure — pre-qualification required
Analyse approfondie du portefeuille
Utilise:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications