Tenderwize
Retour à la recherche

Construction of Multimodal Transfer Centre in Lubin with Park&Ride and access roads – Task No. 4

Gmina Miejska Lubin·Lubin, Poland·Expired · Jul 16, 2026·Open·Works
Structured notice only
Titre original de l'avis

Poland – Cycle path construction work – Budowa Multimodalnego Centrum Przesiadkowego w Lubinie wraz z parkingiem typu Park&Ride i z przebudową dróg dojazdowych – Zadanie Nr 4

55/100

Score d'opportunité

Needs reviewMedium complexity
WorksExpired
Pourquoi ce score ?

Opportunité

55 / 100

Complexité

40 / 100

Facteurs de risque

No estimated contract value is provided, which can lead to uncertainty in pricing and fee calculation.

Key personnel must speak Polish or the contractor must provide an interpreter at their own cost, increasing administrat...

Analyse approfondie du portefeuille

Analyse approfondie de l'adéquation entreprise

Utilise:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Aperçu

Moderate opportunity

Faits clés

  • Works contract
  • 1 lot
  • Duration 150 DAY
  • Construction of a cycle path and pedestrian/cycle path along voivodeship road 333
  • Renovation of existing pavements and construction of service strips
Afficher le résumé complet

This is an open tender by the Municipal Commune of Lubin for the construction of a cycle path with pedestrian access along Zielonogórska Street (DW 333) in Lubin, Poland. The project is co-financed by the EU (ERDF) and includes roadworks, lighting, and ancillary works. The contract is a single lot with a 150-day performance period. The estimated value is not disclosed. The tender uses a 'reverse procedure' where the highest-scored offer is evaluated first for eligibility.

Risques

No estimated contract value is provided, which can lead to uncertainty in pricing and fee calculation.

Key personnel must speak Polish or the contractor must provide an interpreter at their own cost, increasing administrat...

L'analyse peut être incomplète

Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.

Exigences clés

Technical

  • Experience: at least 2 completed road construction/renovation projects each with a minimum value of PLN 3,000,000.00 gross within the last 5 years
  • Key personnel: construction manager (road works), electrical works manager, and sanitary works manager with relevant unlimited Polish building qualifications or equivalent
  • Key personnel must speak Polish or the contractor must provide an interpreter

Les exigences peuvent être incomplètes.

Critères d'attribution

Lot 1

Price – 60%60%Warranty period – 40%40%

Acheteur

Localisation

Lubin, POL

Profil acheteur

Ouvrir le profil

Identifiant

6922253959

Activité

General public services

Lots (1)

LOT-0001

Construction of Multimodal Transfer Centre in Lubin with Park&Ride and access roads – Task No. 4

Construction of a cycle path with pedestrian traffic along Zielonogórska Street (voivodeship road 333) from Szkolna Street to the exit behind Hutnicza Street. Scope includes cycle road construction, pedestrian/cycle paths, pavement renovation, crossings, slope reinforcement, retaining walls, culvert, and road lighting installation.

WorksEU fundedElectronic submissionSME suitable

Localisation

PL516, Poland

Durée

150 DAY

Catégorie

Cycle path construction work

Critères d'attribution

Price

Date limite

Expired Jul 16, 2026

Détails de la procédure

Date de publication
15 Jun 2026
Langues
Polish

Métadonnées de référence

Base juridique
32014L0024

Identifiants de référence

ID de l'appel d'offres
410445-2026

Documents (2)

Appels d'offres similaires