Denmark – Consultative engineering and construction services – Bornholms El-Produktion A/S' udbud af bygherrerådgivning i forbindelse med etablering af et nyt motorbaseret anlæg til reserveforsyning på mindst 45 MWe
Opportunity Score
Confidence: 60%
Complexity: high
—
Deadline
services
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
This tender from Bornholms El-Produktion A/S seeks a framework agreement for consultancy services (bygherrerådgivning) to support the establishment of a new motor-based backup power plant (minimum 45 MWe) on the island of Bornholm, Denmark. The project aims to replace aging diesel and thermal plants and provide black-start capability and commercial services. The contract is a single-lot framework agreement with an estimated value of 25,000,000 DKK and a maximum framework value of 45,000,000 DKK, lasting 9 years. The procedure is negotiated with a call for competition under the utilities directive. Award criteria include price (25%) and quality (75%). A minimum equity ratio of 20% over the last three years is required.
Strengths
Documents available
Electronic submission
High budget
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- The consultancy must cover the entire project from design to commissioning.
- The plant must use large, slow-speed dual-fuel engines (to be confirmed during consultancy).
- The contract may be transferred to other entities within the Bornholms Energi og Forsyning Holding group.
Award Criteria
Pris
Underkriteriet "Pris" vil blive vurderet på baggrund af Tilbudslisten på baggrund af følgende elementer: i) Fast pris i den byggeforberedende fase (30 %) og ii) en vægtet teampris baseret på tilbudsgiverens oplyste timepriser (70 %). Der henvises til udbudsbetingelserne for en uddybende beskrivelse af underkriteriet.
| Criterion | Type |
|---|---|
Pris Underkriteriet "Pris" vil blive vurderet på baggrund af Tilbudslisten på baggrund af følgende elementer: i) Fast pris i den byggeforberedende fase (30 %) og ii) en vægtet teampris baseret på tilbudsgiverens oplyste timepriser (70 %). Der henvises til udbudsbetingelserne for en uddybende beskrivelse af underkriteriet. | Price |
Buyer
Name
Bornholms El-Produktion A/S
Location
Rønne, DNK
Website
Buyer profile
Identifier
25798929
Lots (1)
Consultancy services for the entire project: design, procurement, construction supervision, and commissioning of a new motor-based backup power plant (min. 45 MWe) including generators, auxiliary systems, grid integration, and black-start capability.
Procurement Details
Publication
21 May 2026
Deadline
—
Procedure
open
Contract
services
Duration
9 YEAR
Language
DAN
Publication #
353208-2026
Classification
Performance: Denmark
Documents (2)
Similar tenders
Denmark – Evaluation consultancy services – Evaluation of the African Guarantee Fund and Denmark’s contribution
Denmark – Auditing services – REVISIONSOPGAVER FOR KØBENHAVNS KOMMUNE
Denmark – IT services: consulting, software development, Internet and support – 02.14 It-konsulenter (DIS)
Denmark – Engineering services – Silkeborg Spildevand - Udbud af Rådgiverydelser 2026 - Offentligt udbud
Denmark – Research and development services and related consultancy services – EEA/CCE/TC/26/002 - Topic Centre on Climate reporting across the Governance Regulation 2018/1999 and ETS Directive 2003/97/EC (Article 21)
Denmark – Research and development services and related consultancy services – EEA/CCE/TC/26/006 - Topic Centre on Climate Risk and Resilience: Reporting, Tools and Online Knowledge Support
Opportunity Score
Confidence: 60%
Complexity: high
—
Deadline
services
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation