Germany – Architectural, construction, engineering and inspection services – BFC Projektsteuerung - Errichtung einer Ladeinfrastruktur für Elektrobusse und die Erneuerung der Verkehrsflächen
Opportunity Score
Confidence: 60%
Complexity: high
—
Deadline
services
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
This tender by Berliner Verkehrsbetriebe (BVG) seeks a project manager (Projektsteuerer) for the planning and construction of electric bus charging infrastructure and renewal of traffic areas at the BFC site in Berlin. The contract involves project management across all phases (in line with AHO guidelines), including risk management, BIM, cost control, scheduling, and contract management. The procedure is a negotiated procedure with prior call for competition (Verhandlungsverfahren mit vorgeschaltetem Teilnahmewettbewerb) under German sectoral procurement law (SektVO). The contract runs from October 2026 to January 2032. The estimated value is not provided. Eligibility criteria are very demanding, requiring two comparable reference projects with specific characteristics (e.g., minimum construction costs of €15M, BIM, technical commissioning management, PKMS system, logistics in ongoing operations, etc.) and key personnel with specific qualifications. Award is 60% price and 40% quality (based on a concept for service and personnel deployment). Submission is electronic via the platform, with a deadline for participation requests (Teilnahmeanträge) on 17 June 2026 at 10:00. Questions must be submitted by 4 June 2026. The tender is suitable for SMEs, but the stringent references and financial requirements may limit competition.
Strengths
Documents available
SME suitable
Electronic submission
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Procedure: Negotiated procedure with prior call for competition (Verhandlungsverfahren mit vorgeschaltetem Teilnahmewettbewerb)
- Submission via electronic platform (Open portal) in text form
- Submission deadline for participation requests: 17 June 2026 at 10:00 (local time)
Award Criteria
Qualität
Leistungs- und Personaleinsatzkonzept
| Criterion | Type |
|---|---|
Qualität Leistungs- und Personaleinsatzkonzept | Quality |
Buyer
Name
Berliner Verkehrsbetriebe, Bereich Einkauf/ Materialwirtschaft
Location
Berlin, DEU
Identifier
0204:11-2000016000-38
Lots (1)
Project management services for the construction of electric bus charging infrastructure and renewal of traffic areas at the BFC site in Berlin, including all basic and special services as per the price list annex, covering risk management, project management system, coordination, BIM, decision management, interface management, reporting, cost/financing, scheduling, contract management, and filing.
Procurement Details
Publication
19 May 2026
Deadline
—
Procedure
open
Contract
services
Language
DEU
Publication #
345947-2026
Classification
Performance: Germany
Documents (2)
Similar tenders
Germany – Advisory architectural services – KGB Projektsteuerung
Germany – Advertising and marketing services – Agenturleistungen
Germany – Sludge disposal services – Landwirtschaftliche Verwertung des auf der Kläranlage Hessisch Oldendorf anfallenden Klärschlamms
Germany – Research and experimental development services – Fachberatung zu den Maßnahmen für das Infrastruktursicherheitsmanagement im Bereich Bundesfernstraßen
Germany – Installation services of electrical equipment – Landeshauptstadt Erfurt: Errichtung und Betrieb öffentlicher Ladeinfrastruktur sowie Errichtung und Betrieb eines Car-Sharing Angebots
Germany – Architectural, construction, engineering and inspection services – 2026-01842f-30636-IngV_B40 - Instandsetzung Mainbrücke Sindlingen / Frankfurt, ASB-Nr. 5917 584 / Objektpl. Verkehrsanlage Lph 8, Objektpl. Ing.-bauw. Brücke Lph 8 und öBÜ
Opportunity Score
Confidence: 60%
Complexity: high
—
Deadline
services
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation