Norway – Construction work – Project 1250901 AHO - Ventilation and ENØK K201 Turnkey contract
Opportunity Score
Why this score?
Opportunity
0 / 100
Complexity
0 / 100
Risk factors
No procurement documents available
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Tender facts
- Contracting authority
- Statsbygg
- Country
- Norway
- CPV
- 45000000 - Construction work +2 more
- Deadline
- Jan 04, 2027
AI tender analysis
Tenderwize prepares an AI analysis of this tender based on the TED notice and procurement documents: scope of work, key requirements, eligibility criteria, risks and questions for the buyer. The analysis is generated when the tender is opened.
Award Criteria
Lot 1
Buyer
Name
Location
Oslo, NOR
Buyer profile
Identifier
971278374
Activity
General public services
Lots (1)
LOT-0001
Project 1250901 AHO - Ventilation and ENØK K201 Turnkey contract
The Directorate of Public Construction and Property [Statsbygg) requests, in connection with project: no.: 1250901 name: AHO – Ventilation and ENØK tenders for a turnkey contract for replacing and upgrading the ventilation system as well as the implementation of energy efficiency measures (ENØK) at the Oslo School of Architecture and Design (AHO) in Oslo. The aim is to improve the indoor climate, operational security and energy efficiency in the existing teaching and administration building. The contracting authority is the Ministry of Education and Research at Statsbygg. The building is approx. 15,700 m2 and is located in Maridalsveien 29 in the centre of Oslo. A site inspection will be held for all tenderers 25.11.26, 08:00, at Maridalsveien 29, 0175 Oslo.
Location
Duration
Category
Award Criteria
Award details
Price
Exercise comprehension
Competence and experience for offered personnel. Experience with renovation (especially buildings with listed status), buildings in use, ventilation and automation will particularly be emphasised
Justification for use of the Norwegian Confederation of Trade Regulations § 5 b second paragraph of the third period. This procurement is for Ventilation and ECOX on the AHO. The most important climate footprint and environmental impacts in this procurement are: · Climate gas emissions and resource use connected to the use of new materials. · Climate gas emissions connected to energy use in the operation of AHO. · The generation of waste from the alterations of AHO. Concrete environmental requirements have been set in the competition in order to reduce the procurement ́s total climate footprint and environmental impact. It has been estimated that these requirements will give a better climate and environmental effect than the use of climate and environment as the award criterion. In order to reduce climate gas emissions and the use of resources connected to new materials, re-use assessments have been made and described the use of parts of the ventilation installations and windows. Emission requirements have also been set for the most commonly used and emission intensive materials in the procurement. These are best practice level from the latest edition of Green Building Alliance's Green Material Guide. Passive house standards are required for new ventilation systems and windows in order to reduce greenhouse gas emissions connected to energy use. In order to prevent emissions from waste generation, a high degree of sorting of all waste is required. Re-use assessments have also been made and re-use are required, as described above. The discarded windowed glass shall be recycled and not a landfill site. Statsbygg has assessed that the potential for further climate and environmental gains through a competition for award criteria is limited. This is because the requirements are set at the best practice level, both for materials and energy, as given by The Green Building Alliance and NS3701 (the passive house standard). An award criteria will therefore, to a small degree, be expected to provide better climate and environmental performance than the stipulated minimum requirements. Based on this, the terms for utilising the provision in the Norwegian Public Procurement Regulations § 5 b second paragraph of the third period are being assessed as fulfilled. Statsbygg is therefore exempted from the obligation to weight climate and the environment with a minimum of 30 percent or prioritise this among the three highest weighted award criteria.
Additional CPV codes
Procurement Details
- Publication date
- 05 Nov 2026
- Languages
- English, Norwegian
Reference metadata
- Legal basis
- 32014L0024
Reference IDs
- Tender ID
- 771351-2026
Documents (1)
Similar tenders
Germany – Heating, ventilation and air-conditioning installation work – NKJP_430_Raumlufttechnische Anlagen
Norway – Repair and maintenance services of building installations – Framework agreement for inside climate, ventilation and technical energy systems.
Germany – Ventilation and air-conditioning installation work – Lüftungsanlagen
France – Building construction work – Construction d'amphithéâtres bioclimatiques sur le campus de Terre Sainte à Saint-Pierre
Poland – Construction work – Rozbudowa, przebudowa i modernizacja Centrum Zdrowia Psychicznego w Budynkach C1 i C2 w Wojewódzkim Szpitalu Specjalistycznym nr 4 w Bytomiu zadanie realizowane w trybie zaprojektuj i wybuduj
Norway – Construction work – 1263101 UiO HSH Facade renovation - Turnkey contract K202 New ventilation aggregates
Opportunity Score
Why this score?
Opportunity
0 / 100
Complexity
0 / 100
Risk factors
No procurement documents available
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications