Tenderwize
Назад к поиску

Construction of new generation units with heat accumulator at EC Zawidawie

Zespół Elektrociepłowni Wrocławskich KOGENERACJA S.A.·Wrocław, Poland·Deadline Jul 28, 2026 · 37 days left·Open·Works
Structured notice only
Original notice title

Poland – Construction works for power plants and heating plants – Budowa nowych jednostek wytwórczych wraz z akumulatorem ciepła w EC Zawidawie

45/100

Opportunity Score

Needs reviewHigh complexity
WorksOpen
Why this score?

Opportunity

45 / 100

Complexity

70 / 100

Risk factors

Absence of estimated value or budget makes it impossible to gauge project scale and financial exposure.

Strict experience requirements may exclude bidders without exactly matching references.

No procurement documents available

Deep Portfolio Analysis

Deep Company Fit Analysis

Uses:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Overview

Moderate opportunity

Key Facts

  • Works contract
  • 1 lot
  • Design, supply, construction, assembly, integration with existing system, commissioning, and handover of:
  • Electric boiler plant (electrode or resistance) with total thermal power ≥10 MWt and efficiency ≥97%
Show full summary

This open procedure under the EU utility directive seeks a turnkey contractor for the design, construction, and commissioning of new generation units (electric boilers ≥10 MWt, heat accumulator ≥2,000 m³, cogeneration unit AK4 not included, fire water tank, and auxiliary infrastructure) at the EC Zawidawie plant in Wrocław, Poland. The single lot (LOT-0000) is awarded solely on price (100%). The estimated contract value is not disclosed. Submission deadline is 2026-07-28 at 10:00 UTC (12:00 local time). Eligibility requires proven experience in constructing a heat source ≥1.5 MWt and installing a cogeneration unit ≥1 MWe. A bid bond of 1,000,000 PLN is required. Documents are in Polish and some are confidential, requiring a signed confidentiality agreement. The notice was modified on 2026-06-19 to adjust the deadline and eligibility conditions.

Risks

Absence of estimated value or budget makes it impossible to gauge project scale and financial exposure.

Strict experience requirements may exclude bidders without exactly matching references.

No procurement documents available

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

Technical

  • Turnkey execution in 'pod klucz' formula
  • Bid bond of 1,000,000 PLN required before deadline

Administrative

  • Electronic submission via PGE procurement system (swpp2.gkpge.pl)

Requirements may be incomplete.

Award Criteria

Lot 1

Price onlyweight)100%

Buyer

Name

Zespół Elektrociepłowni Wrocławskich KOGENERACJA S.A.

Location

Wrocław, POL

Identifier

NIP: 8960000032

Lots (1)

LOT-0000

Construction of new generation units with heat accumulator at EC Zawidawie

Turnkey design, supply, construction, integration, commissioning of: electric boiler plant (min. 10 MWt, efficiency ≥97%), steel heat accumulator (net ≥2,000 m³), fire water tank, reconnection of existing cogeneration units, and balance-of-plant infrastructure. AK4 cogeneration unit (4.5 MWe) is not included in the scope. Power supply constraints from two different MV connections must be addressed in design.

WorksElectronic submission

Location

PL514, Poland

Category

Construction works for power plants

Selection criteria

Price

Deadline

Deadline Jul 28, 2026

Procurement Details

Publication date
18 Jun 2026
Notice type
Contract notice — standard
Languages
Polish

Reference metadata

Notice subtype
17
Notice version
1
Legal basis
32014L0025

Reference IDs

Tender ID
424578-2026

Documents (1)

Similar tenders