Utrzymanie urządzeń sieci trakcyjnej na terenie 14 Zakładów POLREGIO S.A. w okresie 12 miesięcy
Opportunity Score
Why this score?
Opportunity
50 / 100
Complexity
60 / 100
Risk factors
The submission deadline is only 15 days after the notice publication (corrected notice published 15 June, deadline 30 J...
Strict experience (2 contracts of min 800k PLN each) and specialized equipment (self-propelled overhead line train) may...
Submission deadline in 9 days
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Overview
Moderate opportunityKey Facts
- Services contract
- 1 lot
- Duration 12 MONTH
- Maintenance of traction network equipment (overhead line, associated components) at 14 POLREGIO S.A. plants in Poland.
- Contract duration: 12 months.
Show full summary
Open tendering procedure for maintenance of traction network equipment at 14 POLREGIO S.A. plants in Poland over 12 months. The single lot covers all plants. Award criteria is 100% price. No estimated value is disclosed. Bidders must hold a specific railway license, have relevant experience, qualified personnel, and specialized equipment. Submission deadline: 2026-06-30 10:00 (CET). Procurement documents are available online but were not analyzed in detail.
Risks
The submission deadline is only 15 days after the notice publication (corrected notice published 15 June, deadline 30 J...
Strict experience (2 contracts of min 800k PLN each) and specialized equipment (self-propelled overhead line train) may...
Submission deadline in 9 days
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
Technical
- At least 2 completed or ongoing maintenance services of traction network equipment in the last 3 years, each with a minimum value of 800,000 PLN net.
- At least one person as works manager with unrestricted building qualifications in electrical and power installations.
Certifications
- Valid license under Art. 43(1)(2) of the Polish Railway Transport Act.
Requirements may be incomplete.
Award Criteria
Lot 1
Buyer
Name
POLREGIO S.A.
Location
Warszawa, POL
Website
Buyer profile
Identifier
526-25-57-278
Lots (1)
LOT-0005
Utrzymanie urządzeń sieci trakcyjnej na terenie 14 Zakładów POLREGIO S.A. w okresie 12 miesięcy
Maintenance of overhead traction line equipment across 14 POLREGIO plants. Detailed scope in contract template (Załącznik nr 1 do SWZ).
Location
Duration
Category
Selection criteria
Deadline
Award details
Additional CPV codes
Value note
Show original TED data
Original TED description
1. Przedmiotem Zamówienia jest utrzymanie urządzeń sieci trakcyjnej na terenie 14 Zakładów POLREGIO S.A. w okresie 12 miesięcy. 2.Szczegółowy opis przedmiotu zamówienia zawarty jest we Wzorze Umowy (Załącznik nr 1 do SWZ).
Procurement Details
- Publication date
- 14 Jun 2026
- Notice type
- Contract notice — standard
- Languages
- Polish
Reference metadata
- Notice subtype
- 17
- Notice version
- 1
- Legal basis
- 32014L0025
Reference IDs
- Tender ID
- 406291-2026
- Source notice ID
- 96402198-528d-435e-ae61-e900a42c4363
Documents (1)
Similar tenders
Switzerland – Architectural, construction, engineering and inspection services – MP 2026.02.830 - Contrôle mécanique des mâts de trolleybus
Spain – Technical control services – Contratación de los servicios de revisión de seguridad y análisis de comportamiento de varias presas.
Germany – Engineering design services for the construction of civil engineering works – Kiesbergtunnel - Objekt- und Fachplanungen Konstruktion
Slovenia – Repair, maintenance and associated services related to railways and other equipment – REVIZIJA LOKOMOTIVE LK04
Poland – Technical control services – „Okresowa kontrola stanu technicznego budowli hydrotechnicznych podległych Zarządowi Zlewni w Nysie - przeglądy roczne i pięcioletnie 2026 r. cz. 1-5"
Spain – Repair, maintenance and associated services related to railways and other equipment – Servicios de mantenimiento de las instalaciones de control de tráfico y sistemas complementarios de la línea de alta velocidad Madrid-Barcelona-Figueres. Tramo: Lleida- Barcelona Sants-Figueres.
Opportunity Score
Why this score?
Opportunity
50 / 100
Complexity
60 / 100
Risk factors
The submission deadline is only 15 days after the notice publication (corrected notice published 15 June, deadline 30 J...
Strict experience (2 contracts of min 800k PLN each) and specialized equipment (self-propelled overhead line train) may...
Submission deadline in 9 days
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications