ESCOLA SECUNDÁRIA DU BOCAGE
Original notice title
Portugal – Secondary school construction work – ESCOLA SECUNDÁRIA DU BOCAGE
Opportunity Score
Why this score?
Opportunity
70 / 100
Complexity
40 / 100
Risk factors
Selection criteria and full award methodology not included in the notice; must be obtained from procurement documents t...
All submissions and documents must be in Portuguese, which may be a challenge for non-Portuguese speakers.
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Overview
Strong opportunityKey Facts
- EUR 12.9M estimated value
- Works contract
- 1 lot
- Duration 730 DAY
- Construction of a secondary school (Escola Secundária du Bocage) in Setúbal, Portugal.
- Duration: 730 days from contract start.
Show full summary
Open tender for the construction of Escola Secundária du Bocage, a secondary school, in Setúbal, Portugal. The contract is for works with an estimated value of €12,924,108.39 and a duration of 730 days. Submission deadline is 2026-07-24. The procedure is an open call with electronic submission required. Award is based on price only (with possible quality criteria indicated in the XML notice). Procurement documents are available but were not analyzed.
Risks
Selection criteria and full award methodology not included in the notice; must be obtained from procurement documents t...
All submissions and documents must be in Portuguese, which may be a challenge for non-Portuguese speakers.
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
Administrative
- Submission deadline: 2026-07-24T23:59:59 (local time?).
- Electronic submission via Open portal
- Language: Portuguese (POR) only.
Requirements may be incomplete.
Award Criteria
Lot 1
Buyer
Name
Município de Setúbal
Location
setúbal, PRT
Website
Identifier
501294104
Activity
General public services
Lots (1)
LOT-0000
ESCOLA SECUNDÁRIA DU BOCAGE
Construction of secondary school in Setúbal, Portugal. Duration 730 days. Estimated value €12,924,108.39.
EUR 12.9M
Estimated value
Location
Duration
Category
Selection criteria
Deadline
Award details
Value note
Show original TED data
Original TED description
ESCOLA SECUNDÁRIA DU BOCAGE
Procurement Details
- Publication date
- 10 cze 2026
- Notice type
- Contract notice — standard
- Languages
- Portuguese
Reference metadata
- Notice subtype
- 16
- Notice version
- 1
- Legal basis
- 32014L0024
Reference IDs
- Tender ID
- 400095-2026
Documents (2)
Similar tenders
Estonia – Underwear – Termopesu ostmine
Poland – Hire of industrial vehicles with driver – Kompleksowa obsługa placów składowych i transportu wewnętrznego na powierzchni (w tym kopalnianych sieci kolei wąskotorowych) na rzecz Polskiej Grupy Górniczej S.A. KWK Murcki - Staszic
France – Development services of real estate – SELECTION D'UN PROJET POUR LA REALISATION D'UN ENSEMBLE IMMOBILIER DE 28 LOGEMENTS COLLECTIFS A CHATENAY-MALABRY (92) EN CPI
Poland – Pipeline, piping, pipes, casing, tubing and related items – „Dostawy rur z tworzyw sztucznych dla Południowego Koncernu Węglowego S.A.”
Austria – Construction supervision services – A01 GEN Knoten Linz – Knoten Haid + A01 ASt Traun/Haid - Örtliche Bauaufsicht E&M
Czechia – Diagnostic agents – Dodávky ZP_IVD – Reagencie a spotřební materiál pro sekvenační analýzu
Opportunity Score
Why this score?
Opportunity
70 / 100
Complexity
40 / 100
Risk factors
Selection criteria and full award methodology not included in the notice; must be obtained from procurement documents t...
All submissions and documents must be in Portuguese, which may be a challenge for non-Portuguese speakers.
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications