5-year overhaul of hydroelectric unit at Klimkówka hydropower plant
Original notice title
Przegląd 5-letni hydrozespołu - Elektrownia Wodna Klimkówka
Opportunity Score
Why this score?
Opportunity
40 / 100
Complexity
55 / 100
Risk factors
Requires at least 3 projects of vertical hydroset ≥1.2 MW with value ≥250k PLN each within 3 years – a very stringent c...
Without any estimated value, it is impossible to gauge the contract's financial attractiveness or align pricing strateg...
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Overview
Moderate opportunityKey Facts
- Services contract
- 2 lots
- 5-year inspection and technical assessment of the hydroset at Klimkówka Hydro Power Plant
- Repair and maintenance services of generators (CPV 50532300-6)
Show full summary
This tender by Państwowe Gospodarstwo Wodne Wody Polskie (RZGW Rzeszów) concerns a 5-year inspection and maintenance of a hydroset at Klimkówka Hydro Power Plant in Poland. The contract is a single lot, open procedure, non-framework, non-DPS, with a 100-day performance period. No estimated value is disclosed. Award criteria: price (60%) and warranty period (40%). Strict technical experience is required: at least 3 similar services (vertical hydroset ≥1.2 MW, each ≥250 000 PLN gross) within the last 3 years, plus qualified staff. Electronic submission via the buyer's platform is mandatory. All communication is in Polish.
Risks
Requires at least 3 projects of vertical hydroset ≥1.2 MW with value ≥250k PLN each within 3 years – a very stringent c...
Without any estimated value, it is impossible to gauge the contract's financial attractiveness or align pricing strateg...
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
Technical
- No variants allowed
- No lot splitting – single lot for technological reasons
- Subcontracting allowed for any part, but subcontractors must be declared in the offer
Requirements may be incomplete.
Award Criteria
Lot 1
Lot 2
Buyer
Name
Państwowe Gospodarstwo Wodne Wody Polskie
Location
Warszawa, POL
Website
Buyer profile
Identifier
368302575
Lots (2)
LOT-0001
Przegląd 5-letni hydrozespołu - Elektrownia Wodna Klimkówka
Inspection, technical assessment, and necessary repair/maintenance of the hydroset at Klimkówka Hydro Power Plant. Detailed technical documentation is referenced but not analyzed.
Location
Category
Deadline
Award details
Additional CPV codes
Value note
Show original TED data
Original TED description
Szczegółowy opis przedmiotu zamówienia zawiera Załącznik Nr 1 do SWZ – Dokumentacja techniczna
Lot 2
Lot 2
Incomplete lot data from structured data – only award criteria (quality) provided; missing identifier, title, CPVs, value, deadline.
Procurement Details
- Publication date
- 08 Jun 2026
- Notice type
- Contract notice — standard
- Languages
- Polish
Reference metadata
- Notice subtype
- 16
- Notice version
- 1
- Legal basis
- 32014L0024
Reference IDs
- Tender ID
- 395205-2026
- Source notice ID
- 429bd259-56de-4fa6-bee1-da76beeff929
Documents (1)
Similar tenders
Poland – Horticultural services – Pielęgnacja i utrzymanie zieleni na terenie miasta Połaniec
Poland – Repair and maintenance services of medical equipment – Obsługa serwisowa aparatów USG marki GE - 11 sztuk
Poland – Software implementation services – Zakup migracji Systemu Wspomagania Ekonomiki Zakładu (SWEZ) do nowej wersji oraz usług wsparcia i konsultacji dla procesu migracji
Poland – Banking services – Obsługa płatności bezgotówkowych w jednostkach Krajowej Administracji Skarbowej i systemie e-Urząd Skarbowy
Poland – Call centre – Świadczenie usługi obsługi infolinii „PKP Intercity” S.A.
Poland – Postal services – Świadczenie usług pocztowych w obrocie krajowym i zagranicznym na potrzeby Urzędu Miejskiego w Białymstoku.
Opportunity Score
Why this score?
Opportunity
40 / 100
Complexity
55 / 100
Risk factors
Requires at least 3 projects of vertical hydroset ≥1.2 MW with value ≥250k PLN each within 3 years – a very stringent c...
Without any estimated value, it is impossible to gauge the contract's financial attractiveness or align pricing strateg...
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications