Wymiana 2 szt. pomp na stanowiskach w PŚ Motława
Opportunity Score
Why this score?
Opportunity
60 / 100
Complexity
70 / 100
Risk factors
Strict experience requirements: three specific reference projects with high thresholds (pump capacity, transformer powe...
Works must be performed in an active pumping station without interruption – requires careful planning and phasing
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Overview
Moderate opportunityKey Facts
- PLN 8.6M estimated value
- Works contract
- 1 lot
- Duration 18 MONTH
- Replacement of two pumps at the Motława pumping station
- Construction works including supply and installation of pumps
Show full summary
One lot tender by Gdańska Infrastruktura Wodociągowo-Kanalizacyjna Sp. z o.o. for replacement of two pumps at the Motława wastewater pumping station in Gdańsk, Poland. Open procedure, award based on lowest price. Estimated value 8,595,815.33 PLN. Deadline for submissions: 15 July 2026, 10:00 CET. Requires specific experience in pump installation, transformer station modernization, and control system reconstruction. Bid bond of 100,000 PLN required.
Risks
Strict experience requirements: three specific reference projects with high thresholds (pump capacity, transformer powe...
Works must be performed in an active pumping station without interruption – requires careful planning and phasing
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
Technical
- Registration in a professional or trade register in the country of establishment
- Reference project: supply and installation of at least one dry-installed pump with capacity ≥1500 m3/h and power ≥100 kW in a municipal wastewater pumping station during operation
- Reference project: modernization of transformer station including replacement of transformers 15/0.4kV (≥250kVA) and main low-voltage switchgear
Requirements may be incomplete.
Award Criteria
Lot 1
Buyer
Name
Gdańska Infrastruktura Wodociągowo-Kanalizacyjna Sp. z o.o.
Location
Gdańsk, POL
Website
Buyer profile
Identifier
0000216612
Lots (1)
LOT-0001
Wymiana 2 szt. pomp na stanowiskach w PŚ Motława
Replacement of two pumps at the Motława pumping station, including construction works, supply and installation of pumps, modernization of transformer station (replacement of transformers 15/0.4kV, main switchgear), and reconstruction of power supply and control systems. All works must be performed without interrupting station operation.
PLN 8.6M
Estimated value
Location
Duration
Category
Selection criteria
Deadline
Award details
Additional CPV codes
Value note
Show original TED data
Original TED description
Wykonanie robót budowlanych w celu realizacji zadania inwestycyjnego pn. Wymiana 2 szt. pomp na stanowiskach w PŚ Motława.
Procurement Details
- Publication date
- 08 Jun 2026
- Notice type
- Contract notice — standard
- Languages
- Polish
Reference metadata
- Notice subtype
- 17
- Notice version
- 1
- Legal basis
- 32014L0025
Reference IDs
- Tender ID
- 392668-2026
- Source notice ID
- 305db82f-7945-4efd-9ec8-0b531001f574
Documents (1)
Similar tenders
Portugal – Wastewater treatment plant construction work – AMPLIAÇÃO DA ETAR DE CALDAS DA RAINHA
Germany – Construction work for swimming pool – Freizeitbad GalaxSea Jena - Energetische Sanierung - Los 16: Badetechnische Anlagen
North Macedonia – Wastewater treatment plant construction work – Wastewater collection and treatment investment project in the Municipality of Stip
Germany – Sewage treatment works – Erweiterung der Kläranlage Silberstedt - Bauleistungen
Slovakia – Construction work – ČOV Šamorín - intenzifikácia ČOV
Slovakia – Wastewater treatment plant construction work – Giraltovce – ČOV – 2. etapa
Opportunity Score
Why this score?
Opportunity
60 / 100
Complexity
70 / 100
Risk factors
Strict experience requirements: three specific reference projects with high thresholds (pump capacity, transformer powe...
Works must be performed in an active pumping station without interruption – requires careful planning and phasing
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications