Dam construction work in Tontouta

Société Néo-Calédonienne d'Energie·Nouméa, NCL·Expired · Jun 15, 2026·Oth Mult·Works
Structured notice only
Original notice title

STEP de Tontouta - Nouvelle Calédonie

40/100

Opportunity Score

Needs reviewHigh complexity
WorksExpired
Why this score?

Opportunity

40 / 100

Complexity

85 / 100

Risk factors

Lack of value information makes it impossible to assess project viability or budget

Subcontracting not allowed; bidder must have full capability to execute all works

No procurement documents available

Deep Portfolio Analysis

Deep Company Fit Analysis

Uses:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Overview

Moderate opportunity

Key Facts

  • Works contract
  • 3 lots
  • Study, design, and construction of a 100 MW pumped storage hydroelectric plant (STEP) with 130 MW pumping capacity near Tontouta river in New Caledonia
  • Two-phase approach: Phase 1 (ECI) for detailed design, risk analysis, and EPC preparation; Phase 2 (optional EPC) for full construction
Show full summary

This tender, issued by Société Néo-Calédonienne d'Energie (ENERCAL) via EDF as project manager, is for the study, design, and construction of a 100 MW pumped storage hydroelectric plant (STEP) near the Tontouta river in New Caledonia. The procedure is a two-phase process: Phase 1 (ECI contract) includes detailed design, risk analysis, and preparation of an EPC contract; Phase 2 is an optional EPC contract for full construction. The tender is published under the Utilities Directive (2014/25/EU). Only a TED XML notice was analyzed; no procurement documents were extracted.

Risks

Lack of value information makes it impossible to assess project viability or budget

Subcontracting not allowed; bidder must have full capability to execute all works

No procurement documents available

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

Technical

  • Multi-stage procedure (ECI then optional EPC)

Administrative

  • Electronic submission via Open portal
  • Language: French (FRA)

Requirements may be incomplete.

Buyer

Name

Société Néo-Calédonienne d'Energie

Location

Nouméa, NCL

Buyer profile

Open profile

Identifier

103 916 334

Lots (7)

LOT-0001

STEP de Tontouta - Nouvelle Calédonie

Phase 1: ECI contract for detailed design (APD), methods/planning, risk analysis, price confirmation, and preparation of EPC specifications. Phase 2 (optional): EPC contract for full construction including upper basin, lower basin, penstock, powerhouse, and grid connection.

WorksElectronic submission

Location

France

Category

Construction work for dams

Deadline

Expired Jun 15, 2026

Lot 2

Lot 2

Additional CPV for hydraulic structures construction work (45248000).

Category

Construction work

Lot 3

Lot 3

Additional CPV for engineering consultancy services (71310000).

Category

Consultative engineering

Lot 4

Lot 4

Etude, conception et réalisation d’un aménagement hydro-électrique de type « STEP » (Système de Transfert d’Energie par Pompage) de 100 MW de puissance en turbinage (130 MW en pompage) à proximité du fleuve côtier « Tontouta » en Nouvelle Calédonie.

Category

Construction work

Lot 5

Lot 5

Etude, conception et réalisation d’un aménagement hydro-électrique de type « STEP » (Système de Transfert d’Energie par Pompage) de 100 MW de puissance en turbinage (130 MW en pompage) à proximité du fleuve côtier « Tontouta » en Nouvelle Calédonie.

Category

Consultative engineering

Lot 6

Lot 6

Etude, conception et réalisation d’un aménagement hydro-électrique de type « STEP » (Système de Transfert d’Energie par Pompage) de 100 MW de puissance en turbinage (130 MW en pompage) à proximité du fleuve côtier « Tontouta » en Nouvelle Calédonie.

Category

Electric motors, generators and transformers

Lot 7

Lot 7

Etude, conception et réalisation d’un aménagement hydro-électrique de type « STEP » (Système de Transfert d’Energie par Pompage) de 100 MW de puissance en turbinage (130 MW en pompage) à proximité du fleuve côtier « Tontouta » en Nouvelle Calédonie.

Category

Hydraulic turbines

Procurement Details

Publication date
29 Apr 2026
Notice type
Contract notice — standard
Languages
French

Reference metadata

Notice subtype
17
Notice version
1
Legal basis
32014L0025

Reference IDs

Tender ID
299334-2026
Source notice ID
7a684cc6-d87b-40a5-bb32-5d0f7a894ebe