Trabzon water supply system completion works

Department of Project Implementation (DoPI), General Directorate of European Union and Foreign Relations (DGEUFR), Ministry of Environment, Urbanization and Climate Change (MoEUCC)·Ankara, TUR·Deadline Jul 21, 2026 · 30 days left·Open·Works
Original notice title

Construction of Trabzon Water Supply System - Completion Works

0/100

Opportunity Score

High riskLow complexity
WorksOpen
Why this score?

Opportunity

0 / 100

Complexity

0 / 100

Deep Portfolio Analysis

Deep Company Fit Analysis

Uses:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Award Criteria

Lot 1

Please consult the procurement documents

Buyer

Name

Department of Project Implementation (DoPI), General Directorate of European Union and Foreign Relations (DGEUFR), Ministry of Environment, Urbanization and Climate Change (MoEUCC)

Location

Ankara, TUR

Identifier

Department of Project Implementation (DoPI), General Directorate of European Union and Foreign Relations (DGEUFR), Ministry of Environment, Urbanization and Climate Change (MoEUCC)

Lots (3)

LOT-0001

Construction of Trabzon Water Supply System - Completion Works

The scope of work is summarised as below: a) 2600 house connections between the new distribution pipeline and the subscribers” water meter using PE pipes with diameter DN32 to DN 110 and 15.600 m house connection pipe line per an average connection length of approximately 6 m b) Functional SCADA system consisting of computer hardware and software in compliance with the existing SCADA system of the End Recipient c) Construction of 16 underground flowmeters, 1 PRV chamber fitted and 7 Residual Chlorine Measurement Equipment d) Construction of additional water distribution network pipelines diameter DN110 to DN 225 ( appr. 48.500 m ) and DN250 to DN630 (appr.1500m) e) Construction of 9000 m water mains DN 630 and DN1000 f) Construction of total 18 underground air valves chambers and the discharge valve chambers g) Installation of 1055 missing valve box h) Supply and installation of 51 PRV chambers, missing ventilation pipes, missing manometers, missing valves, missing fittings and other items

WorksElectronic submission

Location

TUR

Category

Works related to water-distribution…

Deadline

Deadline Jul 21, 2026

Lot 2

Lot 2

The scope of work is summarised as below: a) 2600 house connections between the new distribution pipeline and the subscribers” water meter using PE pipes with diameter DN32 to DN 110 and 15.600 m house connection pipe line per an average connection length of approximately 6 m b) Functional SCADA system consisting of computer hardware and software in compliance with the existing SCADA system of the End Recipient c) Construction of 16 underground flowmeters, 1 PRV chamber fitted and 7 Residual Chlorine Measurement Equipment d) Construction of additional water distribution network pipelines diameter DN110 to DN 225 ( appr. 48.500 m ) and DN250 to DN630 (appr.1500m) e) Construction of 9000 m water mains DN 630 and DN1000 f) Construction of total 18 underground air valves chambers and the discharge valve chambers g) Installation of 1055 missing valve box h) Supply and installation of 51 PRV chambers, missing ventilation pipes, missing manometers, missing valves, missing fittings and other items

Category

Construction work for water

Lot 3

Lot 3

The scope of work is summarised as below: a) 2600 house connections between the new distribution pipeline and the subscribers” water meter using PE pipes with diameter DN32 to DN 110 and 15.600 m house connection pipe line per an average connection length of approximately 6 m b) Functional SCADA system consisting of computer hardware and software in compliance with the existing SCADA system of the End Recipient c) Construction of 16 underground flowmeters, 1 PRV chamber fitted and 7 Residual Chlorine Measurement Equipment d) Construction of additional water distribution network pipelines diameter DN110 to DN 225 ( appr. 48.500 m ) and DN250 to DN630 (appr.1500m) e) Construction of 9000 m water mains DN 630 and DN1000 f) Construction of total 18 underground air valves chambers and the discharge valve chambers g) Installation of 1055 missing valve box h) Supply and installation of 51 PRV chambers, missing ventilation pipes, missing manometers, missing valves, missing fittings and other items

Category

Ancillary works for water pipelines

Procurement Details

Publication date
21 Apr 2026
Notice type
Contract notice — standard
Languages
English

Reference metadata

Notice subtype
16
Notice version
1
Legal basis
32024R2509

Reference IDs

Tender ID
275926-2026
Source notice ID
50c4969d-7616-4090-9a81-739dc4c9da6b

Documents (1)