Budowa pod klucz centrum mieszkaniowego Sandbrekkevegen

Bergen Kommune·Bergen, Norway·Deadline Jan 15, 2027 · 58 days left·Open·Works
Oryginalny tytuł ogłoszenia

Norway – Construction work – D0440 EFU-10978 Sandbrekkevegen residential centre and rental housing, turnkey contractor

0/100

Ocena szansy

High riskLow complexity
WorksOpen
Skąd ta ocena?

Szansa

0 / 100

Złożoność

0 / 100

Czynniki ryzyka

No procurement documents available

Głęboka analiza portfolio

Głęboka analiza dopasowania firmy

Wykorzystuje:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Najważniejsze informacje

Zamawiający
Bergen Kommune
Kraj
Norwegia
CPV
45000000 - Construction work +5 więcej
Termin
Jan 15, 2027

Analiza AI przetargu

Tenderwize przygotowuje analizę AI tego przetargu na podstawie ogłoszenia TED i dokumentów zamówienia: zakres prac, kluczowe wymagania, warunki udziału, ryzyka i pytania do zamawiającego. Analiza jest generowana po otwarciu przetargu.

Kryteria udzielenia

Lot 1

Price — 85%Environment - non-slip construction site — 10%Environment - materials — 5%In this procurement, the award criteria are combined with climate and environmental requirements in the requirement specification. The contracting authority has assessed the project ́s climate and environmental impact and concluded that it would be better to set requirements in this procurement rather than use the 30 percent award criteria, cf. the Public Procurement Act § 5b. The justification for this will be reviewed below. In accordance with the Public Procurement Act § 5b, the Contracting Authority shall, as a main rule, weight climate and environment considerations with at least 30 percent. In accordance with § 5b second paragraph of the third period, this weighting can be replaced with climate and environmental requirements in the requirement specification alone or combined with the award criteria with a lower weight than, if this gives better climate or environmental effect, and the reasoning is stated in the procurement documents. The following activities have been carried out to map the climate and environmental impact of the procurement: Review of planned work and assessment of extent and environmental impact in consultation with internal climate and environmental adviser. Due to a price and design contest (build to cost), the choice of systems is up to the contractor. Assumptions have therefore been made for what could be climate and environmental impact. From the climate and environment analysis, these climate and environmental considerations have been identified: * Materials: particularly concrete for floors on the ground and foundations, vinyl, gypsum and plywood. * Energy in operation: Energy consumption for room heating, tap water, ventilation, lighting and equipment throughout the lifetime of the project. * Construction site including mass transport: The climate and environmental impact makes upof the direct emissions to air, and affects the surrounding area with a significant amount of noise and particles for air. Priorities will be given to measures that limit the climate footprint for the above mentioned emission posts, through the use of requirements and award criteria. A mapping of the market through the EFU ́s ongoing and executed construction projects has been carried out in order to assess the level of ambition and cost, as well as obtain knowledge on what can be offered in the region. Based on the above mentioned analyses and activities, the following requirements and award criteria are set in the project. * Requirement forlower energy consumption than TEK17 energy framework model. * Option for future retrofitting and expansion of solar panel installations (planning and physical measures). * Requirement for climate gas calculations. * Requirement for circularity analysis/index in accordance with FutureBuilt. * Requirementsource sortingin TEK 17). * Requirement for emission free vehicles. * The objective of maximum waste quantities. * Requirement for low-emitting materials. * Requirements for the absence of environmental toxins. * Requirement for legally carved wood. * Requirement for discharge free building heating and drying. * Requirements to safeguard flora. * Requirement forre-use of ventilation channels. * Requirement forre-use of cable bridges/channels. Award criteria: *Maximum CO2 emissions for materials, with emphasis on concrete. *Maximum diesel quantities. EFU believes it is clear that these requirements provide better climate and environmental effect thanweighting because: In this competition the contracting authority has chosen to have comprehensive requirements as to how the construction work is carried out, as well as systems that limit the climate and environmental impact of the building's lifetime. Using requirements that are considerably stricter than the minimum requirements in TEK 17, the Contracting Authority ensures that all tenderers fulfil all environmental requirements, and thus achieve better climate and environmental effect than if the tenderers have the freedom to fulfil one or several of the environmental requirements in their tender offer and where it had to be assessed as part of the tender evaluation. Furthermore, it is the entirety of fulfilment of these requirements that give the best climate and environmental effect in order to reduce the largest emission drivers in the construction project. The contracting authority therefore believes that it will be clearly better to combine requirements and award criteria in this procurement

Zamawiający

Lokalizacja

Bergen, NOR

Profil zamawiającego

Otwórz profil

Identyfikator

964338531

Działalność

General public services

Części (1)

LOT-0001

D0440 EFU-10978 Sandbrekkevegen residential centre and rental housing, turnkey contractor

Sandbrekkeveien residential centre shall be an institution with 15 resident rooms divided between two departments. A long term department with 9 rooms and a short-term department with 6 rooms, each of the departments shall have the accompanying outside areas. The resident group will be persons who have a decision on 24 hour care in age groups 18-30 years. The resident group has severe functional declines due to mental challenges diagnosed with developmental disturbances, or autism spectrum disturbance with low function levels. The building shall also include the necessary personnel facilities connected to the department and in the personnel base. The outside area shall provide a sheltered patio for residents. The site has a recently approved zoning plan from 2024. This is developed for a residential centre with 9 flats with associated personnel areas, as well as 8 ordinary rental residences. This concept has been adopted changed to what is the basis of this project. It must be expected that in the interaction phase one must consider, as well as seek dispensation from parts of this if this proves necessary. For this turnkey contract, the builder has set a cost cap of NOK 83,053 million excluding VAT, both the contract ́s phases 1 and 2 shall be carried out within this cost cap.

WorksEU fundedElectronic submission

Lokalizacja

NO0A2, Norway

Czas trwania

25 MONTH

Kategoria

Construction work

Kryteria udzielenia

Cost

Szczegóły zamówienia

Data publikacji
16 Nov 2026
Języki
English, Norwegian

Metadane referencyjne

Podstawa prawna
32014L0024

Identyfikatory referencyjne

ID przetargu
798638-2026

Dokumenty (1)

Podobne przetargi

Cookies & Privacy

With your consent, we use Google Analytics, Microsoft Clarity (session recordings) and Google Ads cookies to understand how Tenderwize is used and to measure our advertising. You can change your choice at any time via “Cookie Settings” in the footer. Cookie Policy · Privacy Policy