Archeologia morska dla projektu wyspy energetycznej Bornholm
Oryginalny tytuł ogłoszenia
Denmark, Germany – Archaeological services – Marine Archeology for the Bornholm Energy Island project - 26/12562
Ocena szansy
Skąd ta ocena?
Szansa
0 / 100
Złożoność
0 / 100
Głęboka analiza portfolio
Wykorzystuje:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Najważniejsze informacje
- Zamawiający
- Energinet Eltransmission A/S
- Kraj
- Dania
- CPV
- 71351914 - Archaeological services +2 więcej
- Termin
- Dec 14, 2026
- Szacowana wartość
- EUR 12M
Analiza AI przetargu
Tenderwize przygotowuje analizę AI tego przetargu na podstawie ogłoszenia TED i dokumentów zamówienia: zakres prac, kluczowe wymagania, warunki udziału, ryzyka i pytania do zamawiającego. Analiza jest generowana po otwarciu przetargu.
Kryteria udzielenia
Lot 1
Zamawiający
Lokalizacja
Fredericia, DNK
Profil zamawiającego
Identyfikator
39314878
Działalność
Electricity-related activities
Części (1)
LOT-0000
Marine Archeology for the Bornholm Energy Island project - 26/12562
The Contracting Authority wants to purchase a service for marine archaeological site investigations for a ca. 200 km cable route between Bornholm and Zealand in the Baltic Sea. The services include ROV inspections, diver inspections, Vibrocore sampling, probe sampling and marine archaeological test pits. For further details regarding the purchase, reference is made to the tender documents. The tendered contract has a duration of 2 years. The value of the contract is expected to amount to 12,000,000 EUR.
EUR 12M
Szacowana wartość
Lokalizacja
Czas trwania
Kategoria
Kryteria udzielenia
Szczegóły kryteriów
Prices must be stated in the attached Price List doc. no. 26/12562-6 and the defined price elements must be completed herein. To help navigate the Price list, please refer to the Price list – instructions doc.no. 26/12562-21 Prices must be stated in EUR exclusive of VAT but inclusive of all other expenses associated with the purchase. When evaluating 'Price', the Contracting Authority will evaluate the total evaluation sum, cf. the Price List.
Time Schedule The Tenderer must prepare and submit the following documentation: 1. A general time schedule and 2. Filled in Milestone register General time schedule: The general time schedule should present the contract milestones, the commencement and duration of the offered main activities, work packages and deliverables. The general time schedule should be structured as a Gantt chart. The general time schedule should include all time necessary for completing the Scope of Services such as (but not limited to) planning, mobilization, operations, standby, transit, reporting and possible contingencies. Filled in milestone register As set out in Milestone register -template doc.no. 26/12562-5, this must be filled in and submitted with the tender. A number of selected key events are subject to the risk of liquidated damages as described in the tender document “Service Agreement”. These key events are identified in the “Milestone register – template” with the value “YES” in the column LD. For the sub-criterion “Time Schedule”, the Contracting Authority will evaluate the degree to which the requested schedule described in the Scope of Services, chapter 3 are met, Further, the Contracting Authority will evaluate the degree to which the tender demonstrates a realistic and robust time schedule, which allows sufficient time for potential schedule contingencies, but still provides evidence of a high level of security for delivery within the timeframe as set out in Scope of Services, chapter 3 An overall evaluation will be made of this sub-criterion. For this sub-criterion, a minimum score of 4 is required for the tender to be compliant. Failure to reach this score in connection with shortlisting under section 3.9 or an evaluation leading to the award of the contract will result in the tender being excluded from the competition. Scores are assigned in accordance with section 5.1.2.
Equipment The Tenderer shall provide a description of the proposed equipment that addresses the following: • Vessels • Instruments and Equipment Vessels The description should present the vessels and redundancy arrangements that are offered to complete the Scope of Services with enclosures. The Tenderer shall for each offered vessel include a table with the following information: 1. Identification: Name, Flag, IMO number, MMSI number, Call sign, Owner 2. Dimensions: Length LOA, Width, Draft, A few overview photos, Accommodation capacity, total, Accommodation capacity, available for Client 3. Operational limitations for survey and archaeological investigation activities: Minimum water depth, Maximum wave height, Maximum wind speed, Maximum sea current 4. Operating platform (e.g., deck area), lifting equipment, launch and recovery systems, as well as station keeping (DP performance plots if relevant). Instruments and Equipment The description should present the equipment and instruments that are offered to complete the Scope of Services with enclosures. The description should include the following: 1. A presentation of the offered instruments for positioning of vessels and subsea units, spread for data acquisition and equipment for seabed sampling to complete the Scope of Services. 2. A short overview of the tests and calibrations applied to sensors to verify that they are ready for service. 3. The description shall address approach to break down and spares including possible contingent capacities. 1The Contracting Authority will evaluate the proposed Equipment in relation to the scope and the complexity of the tendered assignment for, cf. the Scope of Services documents, emphasizing the following: • The offered vessels meet the technical requirements as described in Scope of Services ‐ Enclosure 1 – Technical Requirements – chapter 5.1 and 5.3. • The technical solution documents vessels, instruments and equipment which are suitable and adapted to the site location, seabed conditions (such as water depth and anticipated geology) and anticipated metocean conditions at the specific time of year. • The Technical Solution proposes contingent capacities. An overall evaluation will be made of this sub-criterion. For this sub-criterion it is a minimum requirement that the tenderer reach a minimum score of 4 for the tender to be compliant. Not reaching this score either in connection with shortlisting, cf. section 3.9, or in connection with the tender evaluation (an evaluation leading to the award of the contract) will result in the tender being excluded from the competition.
Execution Plan The Tenderer shall also submit CVs for the proposed Project Manager and HSE Manager as part of the tender. The CVs shall describe each person's relevant qualifications and experience, including previous assignments, responsibilities and involvement in planning comparable marine operations The Tenderer shall also provide an Execution Plan that describes planning (c.f. Scope of Services, Encl1, Chapter 4), delivering the work packages (c.f. Scope of Services, Chapter 4) and the Project Manager and HSE Manager’s role and involvement in the planning tasks under the Contract. The Contracting Authority will evaluate the proposed Execution Plan in relation to the scope and complexity of the tendered assignment, cf. the Scope of Services documents. It will be evaluated positively to the extent that the Execution Plan demonstrates: 1. A well-structured approach to managing the complex reporting and deliverable structure of the assignment 2. Clear identification and effective management of project risks, dependencies, interfaces and potential bottlenecks. 3. Project Manager and HSE Manager with relevant qualifications and experience in planning comparable marine operations. An overall evaluation will be made of this sub-criterion. For this sub-criterion it is a minimum requirement that the tenderer reach a minimum score of 4 for the tender to be compliant. Not reaching this score either in connection with shortlisting, cf. section 3.9, or in connection with the tender evaluation (an evaluation leading to the award of the contract) will result in the tender being excluded from the competition.
Dodatkowe kody CPV
Szczegóły zamówienia
- Data publikacji
- 15 Nov 2026
- Języki
- English
Metadane referencyjne
- Podstawa prawna
- 32014L0025
Identyfikatory referencyjne
- ID przetargu
- 795849-2026
Dokumenty (1)
Podobne przetargi
Ireland – Archaeological services – WCCC26 328 Provision of Archaeological Services
France – Archaeological services – Réalisation d’opérations de fouilles archéologiques sur le patrimoine de l'EPA Euromediterranee - Ilot Montolieu
Poland – Supervision of building work – Zarządzanie i nadzór nad realizacją inwestycji pn. „Budowa obwodnicy Klimontowa w ciągu DW 758”
Poland – Archaeological services – Wykonanie archeologicznych badań sondażowych i wykopaliskowych na stanowiskach kolidujących z budową drogi ekspresowej S19 odc. węzeł Sokółka Północ – węzeł Czarna Białostocka, wraz z opracowaniem wyników badań
Spain – Architectural and related services – Servicio de asistencia técnica de redacción de proyectos y dirección de obras del Centro Social El Altet.
France – Archaeological services – Réalisation des fouilles archéologiques de la Bâtie d'Azieu (2027-2029)
Ocena szansy
Skąd ta ocena?
Szansa
0 / 100
Złożoność
0 / 100
Głęboka analiza portfolio
Wykorzystuje:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications