Qualification System for Ground Investigation Works
Oryginalny tytuł ogłoszenia
Ireland-Dublin: Ground investigation services
Ocena szansy
Skąd ta ocena?
Szansa
70 / 100
Złożoność
60 / 100
Czynniki ryzyka
Night work on railway tracks requires strict safety protocols and PTS certification; failure to obtain or maintain PTS...
Estimated value is a ceiling, not a commitment; actual work volume may be lower.
Restricted procedure — pre-qualification required
Głęboka analiza portfolio
Wykorzystuje:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Najważniejsze informacje
- Zamawiający
- Saint Nicholas GFC
- Kraj
- Irlandia
- CPV
- 45111250 - Ground investigation work +1 więcej
- Termin
- Sep 14, 2027
- Szacowana wartość
- EUR 10M
Przegląd
Strong opportunityKluczowe fakty
- EUR 10M estimated value
- Services contract
- 1 lot
- Ground investigation services including soil and rock drilling, trial pits, trenching, probing.
- Utility mapping and structural investigations.
Pokaż pełne podsumowanie
This is a qualification system (DPS) for ground investigation services for Iarnród Eireann-Irish Rail, covering all locations on the Irish Rail network. The system is established for four years (extendable to six) with an estimated total value of EUR 10,000,000. Applicants can apply at any time during the system's life. Services include ground investigation, utility mapping, structural investigations, boreholes, in-situ and laboratory testing, and reporting. Successful candidates will receive future call-off tenders.
Ryzyka
Night work on railway tracks requires strict safety protocols and PTS certification; failure to obtain or maintain PTS...
Estimated value is a ceiling, not a commitment; actual work volume may be lower.
Restricted procedure — pre-qualification required
No procurement documents available
Kluczowe wymagania
Technical
- Ability to carry out Shell and Auger, Cable Percussion, Rotary Coring, Window Sample boreholes.
- Capability for structural coring, trial pitting, slit trenching, dynamic probing.
Certifications
- Staff must hold Irish Rail approved Personal Track Safety (PTS) certificates for railway work.
Zamawiający
Nazwa
Lokalizacja
Drogheda, IRL
Strona
Profil zamawiającego
Działalność
Education
Części (1)
8378
Qualification System for Ground Investigation Works
A single qualification system for ground investigation services including utility mapping, structural investigations, boreholes (Shell and Auger, Cable Percussion, Rotary Coring, Window Sample), trial pitting, slit trenching, dynamic probing, in-situ and laboratory testing, soil and groundwater sampling, geophysical surveying, groundwater level monitoring, and preparation of factual and interpretative reports. Work must be carried out on the Irish Rail network, often at night under track protection. Service providers must hold Irish Rail approved Personal Track Safety (PTS) certificates.
EUR 10M
Szacowana wartość
Kategoria
Termin
Dodatkowe kody CPV
Uwaga do wartości
Szczegóły zamówienia
- Data publikacji
- 24 Aug 2023
- Języki
- English
Metadane referencyjne
- Podstawa prawna
- 32014L0025
Identyfikatory referencyjne
- ID przetargu
- 515121-2023
Podobne przetargi
France – Engineering studies – Système d'Acquisition Dynamique pour la réalisation d'études techniques liées aux travaux
Germany – Construction work for pipelines, communication and power lines – Qualifizierungssystem für die Erneuerung der Seekabel zu den ostfriesischen Inseln - Projekt "InselPuls"
France – Engineering studies – Système d'Acquisition Dynamique pour la réalisation d'études techniques liées aux travaux
Spain – Legal services – Servicios de Colaboración con la Intervención General del Ayuntamiento de Molina de Segura, basado en Sistema Dinámico de Adquisición.
Norway – Engineering services – Dynamic purchasing system - Planning and engineering design of investment, operation and maintenance.
Norway-Moss: Ground investigation services
Ocena szansy
Skąd ta ocena?
Szansa
70 / 100
Złożoność
60 / 100
Czynniki ryzyka
Night work on railway tracks requires strict safety protocols and PTS certification; failure to obtain or maintain PTS...
Estimated value is a ceiling, not a commitment; actual work volume may be lower.
Restricted procedure — pre-qualification required
Głęboka analiza portfolio
Wykorzystuje:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications