Transmission line construction work

E.ON Észak-dunántúli Áramhálózati Zrt.·Győr, Hungary·Expired · Aug 10, 2026·Open·Works
Structured notice only
Oryginalny tytuł ogłoszenia

Hungary – Construction work – Távvezeték-kivitelezés IV. ütem – 3 részben (ism.)

62/100

Ocena szansy

Needs reviewHigh complexity
WorksExpired
Skąd ta ocena?

Szansa

62 / 100

Złożoność

78 / 100

Czynniki ryzyka

The structured data deadline is 2026-08-10 09:00 UTC, while the XML notice shows EndTime 11:00:00+02:00, which is consi...

Procurement documents are referenced by URL, but no extracted document text was provided, so the contract draft and tec...

Głęboka analiza portfolio

Głęboka analiza dopasowania firmy

Wykorzystuje:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Przegląd

Moderate opportunity

Kluczowe fakty

  • Works contract
  • 3 lots
  • Construction of a 132 kV transmission line between Zirc and Észak-Litér in three separate lots.
  • Lot 1: foundation works for transmission line towers, including archaeological excavation and full demining.
Pokaż pełne podsumowanie

This is an open works tender for the construction of the Zirc–Észak-Litér 132 kV overhead line in 3 lots: foundations, tower erection/assembly, and wiring/ground cable laying. The notice is in Hungarian, electronic submission is required, and the deadline is 2026-08-10 09:00 UTC. No contract value is provided in the structured data or XML. The tender has explicit technical and professional eligibility requirements, including references, staff qualifications, registry membership, insurance, HSE, and quality/environment systems. Procurement documents are available via EKR, but no extracted procurement document text was provided, so they were not analyzed.

Ryzyka

The structured data deadline is 2026-08-10 09:00 UTC, while the XML notice shows EndTime 11:00:00+02:00, which is consi...

Procurement documents are referenced by URL, but no extracted document text was provided, so the contract draft and tec...

Analiza może być niepełna

Przeanalizowano tylko część dokumentacji. Pozostałe dokumenty mogą zawierać dodatkowe wymagania, certyfikaty lub dokumenty do złożenia.

Kluczowe wymagania

Technical

  • The contractor must provide a technical-financial schedule.

Administrative

  • Electronic submission is required.
  • The notice language is Hungarian.

Wymagania mogą być niepełne.

Kryteria udzielenia

Lot 1

Quality criterion: additional warranty period, weight 15, weight code poi-exa.15%

Lot 2

Quality criterion: expert experience beyond eligibility, weight 15, weight code poi-exa.15%

Lot 3

Price criterion: net contract price excluding reserve fund, weight 70, weight code poi-exa.70%

Zamawiający

Lokalizacja

Győr, HUN

Profil zamawiającego

Otwórz profil

Identyfikator

10741980208

Działalność

Electricity-related activities

Części (3)

LOT-0001

Foundations for Zirc–Észak-Litér line

Lot 1 covers construction of foundation works for the 132 kV Zirc–Észak-Litér transmission line. The scope includes use of buyer-provided materials/equipment from the technical specification, procurement of missing materials by the contractor, complete archaeological excavation work, and full demining. The route crosses several Veszprém county settlements. The lot duration is 140 working days, excluding 15 December to 15 January.

WorksEU fundedElectronic submissionSME suitable

Lokalizacja

Zirc Észak-Litér közötti nyomvonal, Hungary

Czas trwania

140 DAY

Kategoria

Site preparation work

Kryteria udzielenia

Quality

Termin

Expired Aug 10, 2026

LOT-0002

Tower erection and assembly for Zirc–Észak-Litér line

Lot 2 covers tower erection and assembly works for the 132 kV Zirc–Észak-Litér transmission line. The contractor must use buyer-provided materials/equipment from the technical specification and procure any missing materials/equipment. The route crosses several Veszprém county settlements. The lot duration is 122 working days, excluding 15 December to 15 January.

WorksEU fundedElectronic submissionSME suitable

Lokalizacja

Zirc Észak-Litér közötti nyomvonal, Hungary

Czas trwania

122 DAY

Kategoria

Assembly of metal structures

Kryteria udzielenia

Quality

Termin

Expired Aug 10, 2026

LOT-0003

Wiring and ground cable laying for Zirc–Észak-Litér line

Lot 3 covers wiring and ground cable laying works for the 132 kV Zirc–Észak-Litér transmission line. The scope includes a 21.2 km overhead section and a 1.1 km underground cable section, with specified conductor and optical cable types, plus post-completion operating and HIF permit procedures. The route crosses several Veszprém county settlements. The lot duration is 99 working days, excluding 15 December to 15 January.

WorksEU fundedElectronic submissionSME suitable

Lokalizacja

Zirc Észak-Litér közötti nyomvonal, Hungary

Czas trwania

99 DAY

Kategoria

Construction work

Kryteria udzielenia

Price

Termin

Expired Aug 10, 2026

Szczegóły zamówienia

Data publikacji
08 Jul 2026
Języki
Hungarian

Metadane referencyjne

Podstawa prawna
32014L0025

Identyfikatory referencyjne

ID przetargu
475172-2026

Dokumenty (1)

Podobne przetargi