Tenderwize
Wróć do wyszukiwania

Marine construction works and subsea pipelines for Stralcio II

Heratech S.r.l.·Bologna, Italy·EUR 22.8M·Deadline Sep 02, 2026 · 8 days left·Open·Works
High value
Oryginalny tytuł ogłoszenia

Italy – Marine construction works – Procedura aperta per l’affidamento di lavori per la realizzazione “a corpo” e la messa in servizio dello “Stralcio II” (realizzazione delle condotte sottomarine Colonnella e Rodella) dell’intervento denominato “Realizzazione dei sistemi impiantistici a servizio delle Fosse Colonnella 1, Colonnella 2 e Rodella nel Comune di Rimini (RN)”

66/100

Ocena szansy

Needs reviewHigh complexity
WorksOpen
Skąd ta ocena?

Szansa

66 / 100

Złożoność

74 / 100

Czynniki ryzyka

Procurement documents are referenced via a portal link, but their extracted text was not provided, so important conditi...

The notice references article 94 et seq. of D.Lgs. 36/2023 and additional requirements in the DGUE and tender documents...

Submission deadline in 8 days

Głęboka analiza portfolio

Głęboka analiza dopasowania firmy

Wykorzystuje:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Przegląd

Moderate opportunity

Kluczowe fakty

  • EUR 22.8M estimated value
  • Works contract
  • 1 lot
  • Execution of marine construction works for the 'Stralcio II – Vasche Sud' intervention in Rimini.
  • Realization and commissioning of subsea pipelines Colonnella and Rodella.
Pokaż pełne podsumowanie

Open works tender for marine construction and subsea pipelines in Rimini, Italy, for the Colonnella and Rodella outfalls system under the municipality’s optimized bathing protection plan. It is an electronically submitted procedure with one lot, an estimated value of EUR 22,779,251.83, and a 60/40 quality-price award split. Procurement documents are referenced via a portal link, but no extracted document text beyond the TED XML notice was provided, so document-level review is limited.

Ryzyka

Procurement documents are referenced via a portal link, but their extracted text was not provided, so important conditi...

The notice references article 94 et seq. of D.Lgs. 36/2023 and additional requirements in the DGUE and tender documents...

Submission deadline in 8 days

Analiza może być niepełna

Przeanalizowano tylko część dokumentacji. Pozostałe dokumenty mogą zawierać dodatkowe wymagania, certyfikaty lub dokumenty do złożenia.

Kluczowe wymagania

Technical

  • The procedure is open and appears to be a telematic procedure.
  • Execution duration is stated in the XML notice as 580 days from handover.

Administrative

  • Electronic submission is required.

Kryteria udzielenia

Lot 1

Quality criterion: technical value, 60 points.60%Price criterion: price, 40 points.40%

Zamawiający

Lokalizacja

Bologna, ITA

Identyfikator

03578271201

Działalność

Water-related activities

Części (1)

LOT-0001

Marine construction works and subsea pipelines for Stralcio II

Designated as an open works contract for the 'Stralcio II – Vasche Sud' intervention, covering the realization 'a corpo' and commissioning of the underwater pipelines Colonnella and Rodella for the Rimini system infrastructure. Scope is explicitly linked to marine construction works and subsea pipelines in Rimini, Italy.

WorksEU fundedElectronic submissionSME suitable

EUR 22.8M

Szacowana wartość

Lokalizacja

Rimini, Italy

Kategoria

Marine construction works

Kryteria udzielenia

Best price-quality ratio

Termin

Deadline Sep 02, 2026

Szczegóły zamówienia

Data publikacji
08 Jul 2026
Języki
Italian

Metadane referencyjne

Podstawa prawna
32014L0025

Identyfikatory referencyjne

ID przetargu
474859-2026

Dokumenty (2)

Podobne przetargi