Tenderwize
Wróć do wyszukiwania

Energy Efficiency and Plant Requalification Concession

Comune di Novara·Novara, Italy·EUR 108M·Deadline Aug 27, 2026 · 3 days left·Open·Services
High value
Oryginalny tytuł ogłoszenia

Italy – Energy and related services – Concessione, in regime di project financing, della RIQUALIFICAZIONE IMPIANTISTICA FINALIZZATA ALL'EFFICIENTAMENTO ENERGETICO DEGLI IMPIANTI TECNOLOGICI DI PROPRIETA' DEL COMUNE DI NOVARA.

58/100

Ocena szansy

Needs reviewHigh complexity
ServicesOpen
Skąd ta ocena?

Szansa

58 / 100

Złożoność

86 / 100

Czynniki ryzyka

Important procurement documents are referenced via the portal but were not analyzed in extracted text form, so contract...

The notice says no variants are allowed, which limits proposal flexibility.

Submission deadline in 3 days

Głęboka analiza portfolio

Głęboka analiza dopasowania firmy

Wykorzystuje:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Przegląd

Moderate opportunity

Kluczowe fakty

  • EUR 108M estimated value
  • Services contract
  • 1 lot
  • Duration 240 MONTH
  • Project-financing concession for energy-related requalification of municipal technological systems owned by Comune di Novara.
  • Heating/cooling plant and HVAC-related upgrades, including chillers, air handling units, thermal systems and related controls.
Pokaż pełne podsumowanie

This is a 240-month project-finance concession for the energy-related requalification and efficiency upgrade of municipal technological systems owned by Comune di Novara. The notice shows one lot, estimated at EUR 107,961,085, with electronic submission allowed and a deadline on 2026-08-27 16:00 UTC (18:00 local in the XML). Awarding is quality-weighted (75 points) plus price (25 points), with many detailed technical improvement criteria. Procurement documents are referenced via the tender portal, but no extracted procurement document text was provided beyond the TED XML notice, so only notice-level analysis is possible.

Ryzyka

Important procurement documents are referenced via the portal but were not analyzed in extracted text form, so contract...

The notice says no variants are allowed, which limits proposal flexibility.

Submission deadline in 3 days

Analiza może być niepełna

Przeanalizowano tylko część dokumentacji. Pozostałe dokumenty mogą zawierać dodatkowe wymagania, certyfikaty lub dokumenty do złożenia.

Kluczowe wymagania

Technical

  • The concession duration is 240 months.
  • The project is a services concession under a project-financing regime.

Administrative

  • Electronic submission is allowed.

Kryteria udzielenia

Lot 1

Quality criterion: replacement of chillers; weight 10 (per-exa).10%Quality criterion: replacement of UTAs; weight 10 (per-exa).10%Quality criterion: advanced air-system maintenance; weight 6 (per-exa).6%Quality criterion: rapid safety remediation within 30 days; weight 2 (per-exa).2%Quality criterion: shorter recalculation threshold for energy amounts; weight 3 (per-exa).3%Quality criterion: higher threshold for extraordinary lighting maintenance; weight 4 (per-exa).4%Quality criterion: administrative access/control tools; weight 2 (per-exa).2%Quality criterion: VMC installation in larger buildings; weight 5 (per-exa).5%Quality criterion: expanded tele-management; weight 2 (per-exa).2%Quality criterion: hydraulic schematics for thermal plants; weight 2 (per-exa).2%Quality criterion: improved electrical panels for thermal plants; weight 4 (per-exa).4%Quality criterion: fire-prevention filing management; weight 2 (per-exa).2%Quality criterion: pedestrian-crossing safety works; weight 6 (minimum 10 crossings required for scoring).6%Quality criterion: management model improvements; weight 4 (per-exa).4%Quality criterion: environmental/circular-economy certifications; weight 1 (per-exa).1%Quality criterion: Christmas lighting management; weight 4 (per-exa).4%Quality criterion: fibre-optic infrastructure rationalisation; weight 7 (per-exa).7%Quality criterion: gender equality certification; weight 1 (per-exa).1%Price criterion: economic offer; weight 25 (per-exa).25%

Zamawiający

Lokalizacja

Novara, ITA

Identyfikator

00125680033

Działalność

General public services

Części (1)

LOT-0001

Energy Efficiency and Plant Requalification Concession

Project-financing concession for the requalification of municipal technological systems in Novara to improve energy efficiency. The scope explicitly includes HVAC/chiller replacement, air-handling units, advanced maintenance, tele-management, public lighting and related infrastructure, with performance in Novara, Italy. Some technical details are only partially described in the notice and appear to be further specified in the procurement documents.

ServicesEU fundedElectronic submission

EUR 108M

Szacowana wartość

Lokalizacja

Novara NOVARA (NO), Italy

Czas trwania

240 MONTH

Kategoria

Energy and related services

Kryteria udzielenia

Best price-quality ratio

Termin

Deadline Aug 27, 2026

Szczegóły zamówienia

Data publikacji
06 Jul 2026
Języki
Italian

Metadane referencyjne

Podstawa prawna
32014L0023

Identyfikatory referencyjne

ID przetargu
465774-2026

Dokumenty (1)

Podobne przetargi