Tenderwize
Wróć do wyszukiwania

Road Construction Works – Timisoara Green Corridor

Municipiul Timisoara·Timisoara, Romania·RON 95.3M | EUR 18.2M·Expired · Aug 13, 2026·Open·Works
High valueStructured notice only
Oryginalny tytuł ogłoszenia

Romania – Trunk road construction work – Execuție lucrări aferente proiectului „CORIDOR DE MOBILITATE „MAGISTRALA VERDE” ÎN TIMIȘOARA – BD. 16 DECEMBRIE 1989 – CALEA ȘAGULUI ” - Cod SMIS 356962

65/100

Ocena szansy

Needs reviewHigh complexity
WorksExpired
Skąd ta ocena?

Szansa

65 / 100

Złożoność

80 / 100

Czynniki ryzyka

Short preparation period: notice published July 5, deadline August 13 (approx. 5.5 weeks).

Full procurement documents (caiet de sarcini, annexes) not analyzed; critical details may be missed.

Głęboka analiza portfolio

Głęboka analiza dopasowania firmy

Wykorzystuje:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Przegląd

Moderate opportunity

Kluczowe fakty

  • RON 95.3M estimated value
  • Works contract
  • 1 lot
  • Duration 30 MONTH
  • Execution of road construction works for the 'CORIDOR DE MOBILITATE «MAGISTRALA VERDE»' project in Timisoara.
  • Modernization and rehabilitation of Bd. 16 Decembrie 1989 and Calea Șagului (approx. 2.5 km).
Pokaż pełne podsumowanie

This is an open EU-funded tender by Municipiul Timisoara for the execution of road construction works as part of the 'CORIDOR DE MOBILITATE «MAGISTRALA VERDE»' project in Timisoara, Romania. The project involves modernization and rehabilitation of approximately 2.5 km of trunk road (Bd. 16 Decembrie 1989 and Calea Șagului), including dedicated public transport lanes, cycle paths, sidewalks, signaling systems, public lighting, urban furniture, and related utility works. The contract value is 95,295,312.81 RON (approx. 18.2M EUR) with a 30-month duration. The procedure is open, with electronic submission required. Award criteria combine price (30%) and quality (70%), with specific weightings for key personnel experience, warranty duration, management plan, and social inclusion. Eligibility requires registration and DUAE completion. Important deadlines: tender submission by 2026-08-13 (time discrepancy: structured data 12:00, XML notice 15:00). Procurement documents are available online but were not analyzed.

Ryzyka

Short preparation period: notice published July 5, deadline August 13 (approx. 5.5 weeks).

Full procurement documents (caiet de sarcini, annexes) not analyzed; critical details may be missed.

Analiza może być niepełna

Przeanalizowano tylko część dokumentacji. Pozostałe dokumenty mogą zawierać dodatkowe wymagania, certyfikaty lub dokumenty do złożenia.

Kluczowe wymagania

Technical

  • Estimated value: 95,295,312.81 RON (approx. 18.2M EUR).
  • Duration: 30 months from contract start.

Administrative

  • Open procedure; electronic submission via e-licitatie.ro.

Wymagania mogą być niepełne.

Kryteria udzielenia

Lot 1

Price criterion: lowest price gets max points, others proportional.30%Quality: points based on number of similar contracts managed (up to 6), with partial credit for non-HG 1/2018 contracts.20%Quality: linear scoring from 60 to 120 months warranty, max 15 points.15%Quality: scoring based on approach, technical methodology, organization, risk management, quality management, and warranty methodology.15%Quality: points based on number of similar contracts (up to 4), minimum 2 required for conformity.10%Quality: points based on percentage of vulnerable personnel employed (10% = 10 pts, 5% = 5 pts, 2% = 2 pts, <2% = 0 pts), with maintenance requirements and penalties.10%

Zamawiający

Lokalizacja

Timisoara, ROU

Profil zamawiającego

Otwórz profil

Identyfikator

14756536

Działalność

General public services

Części (1)

LOT-0000

Road Construction Works – Timisoara Green Corridor

Execution of road construction works for the 'CORIDOR DE MOBILITATE «MAGISTRALA VERDE»' project in Timisoara, including road modernization, dedicated bus lanes, cycle paths, sidewalks, signaling, lighting, urban furniture, and utility relocation. Total route length approx. 2.5 km, with detailed surface areas for carriageway (53,872 sqm), cycle paths (8,070 sqm), sidewalks (19,050 sqm), and access areas. EU-funded under Regional Program Vest 2021-2027.

WorksEU fundedElectronic submission

EUR 18.2M

Szacowana wartość

Lokalizacja

RO424, Romania

Czas trwania

30 MONTH

Kategoria

Trunk road construction work

Kryteria udzielenia

Best price-quality ratio

Termin

Expired Aug 13, 2026

Szczegóły zamówienia

Data publikacji
05 Jul 2026
Języki
Romanian

Metadane referencyjne

Podstawa prawna
32014L0024

Identyfikatory referencyjne

ID przetargu
462407-2026

Dokumenty (2)

Podobne przetargi