Framework agreement for electrical installations, structured cabling and broadcast engineering
Oryginalny tytuł ogłoszenia
Norway – Electrical installation work – NRK 2026/45 Framework agreement for electrical installations, structured cabling, and broadcast engineering.
Ocena szansy
Skąd ta ocena?
Szansa
62 / 100
Złożoność
68 / 100
Czynniki ryzyka
Submission deadline is fixed at 2026-08-11T10:00:00Z, so preparation time may be limited relative to current date conte...
Work must be planned to avoid any disruption to NRK production, indicating strict operational coordination needs in an...
Restricted procedure — pre-qualification required
Głęboka analiza portfolio
Wykorzystuje:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Przegląd
Moderate opportunityKluczowe fakty
- NOK 120M estimated value
- Framework procurement
- Works contract
- 1 lot
- Duration 48 MONTH
- Framework agreement for electrical installations, structured cabling, and broadcast engineering.
- Installation services and materials for electrical systems, structured cabling, and broadcast engineering.
Pokaż pełne podsumowanie
NRK is procuring a nationwide framework agreement for electrical installations, structured cabling, and broadcast engineering for existing buildings in operational media environments. The notice indicates a restricted procedure with electronic submission, an estimated value of NOK 120,000,000, and a 48-month maximum duration including options. The tender is evaluated on price, key personnel competence/experience, and environmental measures. Procurement documents are available via Mercell, but no full procurement document text was provided beyond the TED XML notice, so some submission and qualification details are incomplete.
Ryzyka
Submission deadline is fixed at 2026-08-11T10:00:00Z, so preparation time may be limited relative to current date conte...
Work must be planned to avoid any disruption to NRK production, indicating strict operational coordination needs in an...
Restricted procedure — pre-qualification required
Analiza może być niepełna
Przeanalizowano tylko część dokumentacji. Pozostałe dokumenty mogą zawierać dodatkowe wymagania, certyfikaty lub dokumenty do złożenia.
Kluczowe wymagania
Technical
- The procedure is restricted.
- The contractor must continuously plan and adapt work to avoid disrupting NRK production.
Administrative
- Electronic submission is required.
Kryteria udzielenia
Lot 1
Zamawiający
Lokalizacja
OSLO, NOR
Strona
Profil zamawiającego
Identyfikator
976390512
Działalność
Recreation, culture and religion
Części (1)
LOT-0000
Framework agreement for electrical installations, structured cabling and broadcast engineering
Nationwide framework agreement for technical installation services and materials in electrical systems, structured cabling, and broadcast engineering. The scope focuses on electrotechnical work in existing buildings such as studios, control rooms, server rooms, editorial offices, and open-plan offices, with work to be carried out in an operating media environment and adapted to avoid production disruptions.
EUR 10.6M
Szacowana wartość
Lokalizacja
Czas trwania
Kategoria
Kryteria udzielenia
Termin
Szczegóły kryteriów
Completed prices and mark-up percentages in the following documents: ● Annex 11 Price Form: o Point 3 'Hourly rates and security guard services'. o Point 4 "Mark-up Percentages". ● Annex 11-1 Unit prices, structured cabling ● Annex 11-2 Material prices electro
Relevant experience" means experience from maintenance and refurbishment/modification projects within the respective disciplines (electrical systems, structured cabling, and broadcast engineering) in existing buildings with ongoing operations. Reference is made to Appendix 9: Technical Specifications [eller Scope of Work]. The tenderer shall provide an account of relevant competence and experience (both formal education/certification and actual work experience), in accordance with Appendix 9: Technical Specifications, Section 5: "Key Personnel and Other Staffing". ● Tables: Tables 1–7 in Section 5.2 "Proposed Key Personnel" must be completed. ● CVs: In addition, 7 CVs must be submitted (one for each key person). Each CV must not exceed 2 pages.
The tenderer shall commit to an environmentally friendly execution of the assignment, ensuring the lowest possible carbon footprint and optimized use of materials. Environmental Action Plan The tenderer shall account for the environmental benefits of the binding measures offered. In the plan, the tenderer shall describe any environmental benefits related to the execution methodology and solutions applied in the work. Examples of such elements are listed below, but the tenderer is free to include additional elements in the plan: A. Use of zero-emission vehicles. B. Choice of environmentally friendly materials with lower greenhouse gas emissions during execution (documentation: Environmental Product Declarations / EPDs). C. Waste management and reuse of materials. D. Choice of materials with a long lifespan. E. Measures to reduce greenhouse gas emissions. F. Any other environmental benefits resulting from measures taken during execution. Please use corresponding headings/bullet points to clearly indicate which response belongs to each environmental measure. The plan is limited to a maximum of 4 pages.
Dodatkowe kody CPV
Uwaga do wartości
Pokaż oryginalne dane TED
Oryginalny tytuł części
NRK 2026/45 Framework agreement for electrical installations, structured cabling, and broadcast engineering.
Oryginalny opis TED
NRK intends to enter into parallel framework agreements for technical installations within electrical systems, structured cabling, and broadcast engineering. NRK has an ongoing need for installation services and materials for the following areas: Electrical installations Structured cabling Broadcast engineering The framework agreement applies nationwide. Historically, up to 80% of the assignments have been associated with the headquarters in Oslo. Historical volumes are indicative only and do not constitute any future commitment for NRK. The agreement primarily covers electrotechnical installations in existing buildings, such as studios, control rooms, server rooms, editorial offices, and open-plan office environments. The assignments will vary considerably in both scope and complexity. As NRK is a media enterprise in full operation, the contractor must continuously plan and adapt the work to prevent any disruptions to production.
Szczegóły zamówienia
- Data publikacji
- 01 Jul 2026
- Języki
- English, Norwegian
Metadane referencyjne
- Podstawa prawna
- 32014L0024
Identyfikatory referencyjne
- ID przetargu
- 453136-2026
Dokumenty (1)
Podobne przetargi
France – Construction work for school buildings – Travaux d'extension et rénovation complète du collège Charles EXBRAYAT à LA GRAND CROIX
France – Electrical wiring and fitting work – Accord-cadre relatif à la réalisation de travaux d’électricité CFO/CFA - Lot n°2 : Projets et travaux complexes
Germany – Installation of cable infrastructure – Verlegung TK-Kabel mit Anpassung Kabelweg, BA 1, Streck 4000, km 209,1-km 214,3
Germany – Electrical installation work – Elektrotechnische Leistungen in 220-/380-kV-Umspannwerken / Electrotechnical Works in 220-/380-kV Substations
France – Installation of cable infrastructure – Fourniture et la mise en œuvre d’un dispositif de vidéo protection de la voie publique, le Maintien en Conditions Opérationnelles, l’assistance et prestations de services associées sur le territoire communal de La Ville-aux-Dames.
Italy – Other electrical installation work – Affidamento in concessione della realizzazione e successiva gestione di interventi di decarbonizzazione in siti di proprietà o nelle disponibilità di Padania Acque S.p.A.
Ocena szansy
Skąd ta ocena?
Szansa
62 / 100
Złożoność
68 / 100
Czynniki ryzyka
Submission deadline is fixed at 2026-08-11T10:00:00Z, so preparation time may be limited relative to current date conte...
Work must be planned to avoid any disruption to NRK production, indicating strict operational coordination needs in an...
Restricted procedure — pre-qualification required
Głęboka analiza portfolio
Wykorzystuje:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications