Tenderwize
Wróć do wyszukiwania

Design and construction of traction power infrastructure for railway line 85 (Warsaw–Łódź)

Centralny Port Komunikacyjny sp. z o.o.·Warszawa, Poland·Expired · Aug 31, 2026·Comp Dial·Works
Oryginalny tytuł ogłoszenia

Poland – Construction work – Opracowanie dokumentacji projektowej i realizacja robót budowlanych w zakresie podsystemu "Energia" - sieć trakcyjna na linii kolejowej nr 85 odc. Warszawa - Łódź

64/100

Ocena szansy

Needs reviewHigh complexity
WorksExpired
Skąd ta ocena?

Szansa

64 / 100

Złożoność

88 / 100

Czynniki ryzyka

This is a competitive dialogue with a later SWZ; bidders must qualify for dialogue before seeing final tender condition...

The notice states that some directly related documents are confidential or trade-secret material, and these were not pr...

No procurement documents available

Głęboka analiza portfolio

Głęboka analiza dopasowania firmy

Wykorzystuje:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Najważniejsze informacje

Zamawiający
Centralny Port Komunikacyjny sp. z o.o.
Kraj
Polska
CPV
45000000 - Construction work +6 więcej
Termin
Aug 31, 2026

Przegląd

Moderate opportunity

Kluczowe fakty

  • Works contract
  • 1 lot
  • Duration until Dec 2032
  • Prepare project documentation for the Energy subsystem.
  • Construct traction network infrastructure for railway line 85.
Pokaż pełne podsumowanie

This is a Polish competitive dialogue for design and construction works for the "Energy" subsystem of railway line no. 85 (Warsaw–Łódź), led by Centralny Port Komunikacyjny sp. z o.o. The contract covers project documentation, construction of traction power infrastructure, related works on PKP PLK infrastructure, EC verification certification, declarations, and documentation for authorization to operate the subsystem. The notice indicates one lot, electronic submission is required, and the procedure includes an invited-dialogue stage with a maximum of 5 participants selected if more candidates qualify. Contract value is not stated in the provided structured data or XML.

Ryzyka

This is a competitive dialogue with a later SWZ; bidders must qualify for dialogue before seeing final tender condition...

The notice states that some directly related documents are confidential or trade-secret material, and these were not pr...

No procurement documents available

Analiza może być niepełna

Przeanalizowano tylko część dokumentacji. Pozostałe dokumenty mogą zawierać dodatkowe wymagania, certyfikaty lub dokumenty do złożenia.

Kluczowe wymagania

Technical

  • Candidates may be invited to the dialogue; the notice states a maximum of 5 participants if more than 5 qualified candidates apply.
  • Consortium bids are allowed.

Administrative

  • Electronic submission is required.

Kryteria udzielenia

Lot 1

Price (type: price, weight not stated)Quality criterion: completion time for general traction network design (weight not stated)Quality criterion: staff experience (weight not stated)Quality criterion: characteristics of key materials (weight not stated)Quality criterion: extension of quality warranty period (weight not stated)

Zamawiający

Lokalizacja

Warszawa, POL

Profil zamawiającego

Otwórz profil

Identyfikator

PL 7010894497

Działalność

General public services

Części (1)

LOT-0001

Design and construction of traction power infrastructure for railway line 85 (Warsaw–Łódź)

Design documentation and construction works for the 'Energy' subsystem: traction network, power supply elements, autotransformer cabins, control of traction network switches, and necessary rebuilding of existing PKP PLK infrastructure at connection points. The scope also includes obtaining EC verification certification for the Energy subsystem, issuing verification declarations, and preparing documentation needed for operating authorization. Source: structured data and XML notice.

WorksEU fundedElectronic submission

Lokalizacja

PL913, Poland

Czas trwania

Dec 2027 - Dec 2032

Kategoria

Construction work

Kryteria udzielenia

Best price-quality ratio

Termin

Expired Aug 31, 2026

Szczegóły zamówienia

Data publikacji
30 Jun 2026
Języki
Polish

Metadane referencyjne

Podstawa prawna
32014L0025

Identyfikatory referencyjne

ID przetargu
449352-2026

Dokumenty (1)

Podobne przetargi

Romania – Hospital facilities construction work – SERVICII DE ELABORARE A DOCUMENTAȚIEI TEHNICO-ECONOMICE LA STADIUL PT + DDE, ASISTENȚĂ TEHNICĂ DIN PARTEA PROIECTANTULUI, EXECUȚIE LUCRĂRI ȘI FURNIZARE DOTĂRI ÎN CADRUL PROIECTULUI CU TITLUL „EXTINDERE CORP C2, MODIFICĂRI INTERIOARE ȘI EXTERIOARE, SUPRAETAJARE, MODERNIZARE FAȚADE ȘI AMENAJARE EXTERIOARĂ. MODIFICARE ȘI RELOCARE CORPURI C3 ȘI C4 – FAZA 1”

Nov 23

Ireland – Construction work for electricity power lines – The MaresConnect 750MW HVDC Interconnector System

Oct 31

Germany – Engineering design services for the construction of civil engineering works – Planungsleistungen Grundhafter Ausbau der Bodestraße in Staßfurt

Nov 3

Sweden – Construction work – För utförande av stationsåtgärder inom Uppsala och Tierp kommun, Uppsala län

Oct 9

Germany – Construction work for pipelines, communication and power lines – Qualifizierungssystem für die Erneuerung der Seekabel zu den ostfriesischen Inseln - Projekt "InselPuls"

Dec 31

Bulgaria – Construction work for electricity power lines – „Присъединяване на нови клиенти с реконструкция и изграждане на въздушни и кабелни мрежи средно напрежение (СрН) и ниско напрежение (НН) и ел. оборудване на трафопостове (ТП) на територията на град София и София Област, обслужвана от „Електроразпределителни мрежи Запад” EАД“, реф. № КС 26-046

May 21