Functional adaptation of S.R.20 from S.P.142 to Carmagnola and Po bridge
Oryginalny tytuł ogłoszenia
Italy – Roadworks – PROCEDURA APERTA PER L’AFFIDAMENTO DEI LAVORI DI “ADEGUAMENTO FUNZIONALE S.R.20 TRATTO TRA LA S.P. 142 E L’ABITATO DI CARMAGNOLA E PONTE PO” (024TO20)
Ocena szansy
Skąd ta ocena?
Szansa
70 / 100
Złożoność
60 / 100
Czynniki ryzyka
Structured data indicates EU funded, but XML notice states no EU funds. This could affect contract conditions or financ...
No procurement documents (e.g., disciplinary, specifications) were analyzed. Key details on eligibility, technical requ...
Głęboka analiza portfolio
Wykorzystuje:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Przegląd
Moderate opportunityKluczowe fakty
- EUR 9.4M estimated value
- Works contract
- 1 lot
- Duration 920 DAY
- Functional adaptation of S.R.20 road between S.P.142 and Carmagnola, including the Po bridge
- Optional works for carriageway adjustment (Phase B) as described in special specifications
Pokaż pełne podsumowanie
Open procedure for functional adaptation of S.R.20 road between S.P.142 and Carmagnola, including the Po bridge. Single lot, roadworks contract with a duration of 920 days. Estimated value €9,430,278.13. Award based on best price-quality ratio (80% quality, 20% price). Submission deadline 5 August 2026 at 10:00 CET. Electronic submission required via Sintel platform. EU funding flag is inconsistent between structured data (EU funded) and XML notice (no EU funds).
Ryzyka
Structured data indicates EU funded, but XML notice states no EU funds. This could affect contract conditions or financ...
No procurement documents (e.g., disciplinary, specifications) were analyzed. Key details on eligibility, technical requ...
Analiza może być niepełna
Przeanalizowano tylko część dokumentacji. Pozostałe dokumenty mogą zawierać dodatkowe wymagania, certyfikaty lub dokumenty do złożenia.
Kluczowe wymagania
Technical
- Open procedure under Italian procurement code (D.Lgs. 36/2023)
- Award based on best price-quality ratio (80% quality, 20% price)
Administrative
- Electronic submission via Sintel platform
Wymagania mogą być niepełne.
Kryteria udzielenia
Lot 1
Zamawiający
Nazwa
Lokalizacja
TORINO, ITA
Strona
Profil zamawiającego
Identyfikator
09740180014
Działalność
General public services
Części (1)
LOT-0001
Functional adaptation of S.R.20 from S.P.142 to Carmagnola and Po bridge
Roadworks for functional adaptation of S.R.20, including carriageway adjustment and optional works (Phase B). Performance locations: Carmagnola and Carignano, Italy. Contract includes options for modifications under Article 120 of Italian procurement code.
EUR 9.4M
Szacowana wartość
Lokalizacja
Czas trwania
Kategoria
Kryteria udzielenia
Termin
Szczegóły kryteriów
Offerta tecnica - vedasi Disciplinare di Gara
Offerta economica - vedasi Disciplinare di gara
Uwaga do wartości
Pokaż oryginalne dane TED
Oryginalny tytuł części
PROCEDURA APERTA PER L’AFFIDAMENTO DEI LAVORI DI “ADEGUAMENTO FUNZIONALE S.R.20 TRATTO TRA LA S.P. 142 E L’ABITATO DI CARMAGNOLA E PONTE PO” (024TO20)
Oryginalny opis TED
PROCEDURA APERTA PER L’AFFIDAMENTO DEI LAVORI DI “ADEGUAMENTO FUNZIONALE S.R.20 TRATTO TRA LA S.P. 142 E L’ABITATO DI CARMAGNOLA E PONTE PO” (024TO20)
Szczegóły zamówienia
- Data publikacji
- 25 Jun 2026
- Języki
- Italian
Metadane referencyjne
- Podstawa prawna
- 32014L0024
Identyfikatory referencyjne
- ID przetargu
- 439481-2026
Dokumenty (1)
Podobne przetargi
France – Earthmoving work – Travaux d'aménagement des espaces publics du secteur Ouest de la ZAC Les Vergnes à Clermont-Ferrand - 63000
Belgium – Structures construction work – Réalisation d’une dalle feu et d’un multivolume simulateur feu à l’Ecole du feu à Amay
Belgium – Roadworks – Renouvellement de revêtements par programme PMS sur le réseau routier non structurant de la Direction des Routes de Namur sur les districts routiers de Bouge, Spy et Philippeville
Belgium – Roadworks – Renouvellement de revêtements par programme PMS sur le réseau routier non structurant de la Direction des Routes de Namur sur les districts routiers de Floreffe, Ciney, Sinsin et Gedinne
France – Road-repair works – Le présent accord-cadre a pour objet les travaux d'entretien, d'aménagements ponctuels et de sécurité des voiries, pistes cyclables et des dépendances du territoire essonnien- 9 lots. La description des travaux est renseignée dans les pièces de la consultation
France – Construction work – Construction d'un pôle oncologie
Ocena szansy
Skąd ta ocena?
Szansa
70 / 100
Złożoność
60 / 100
Czynniki ryzyka
Structured data indicates EU funded, but XML notice states no EU funds. This could affect contract conditions or financ...
No procurement documents (e.g., disciplinary, specifications) were analyzed. Key details on eligibility, technical requ...
Głęboka analiza portfolio
Wykorzystuje:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications