Engineering and Environmental Consultancy Services for Nenagh Flood Relief Scheme
Oryginalny tytuł ogłoszenia
Ireland – Engineering services – Engineering and Environmental Consultancy Services for Nenagh Flood Relief Scheme
Ocena szansy
Skąd ta ocena?
Szansa
60 / 100
Złożoność
70 / 100
Czynniki ryzyka
Award criteria, selection criteria, and detailed requirements are not available in the notice. Without analyzing procur...
Structured data indicates EU-funded, but XML notice states 'no-eu-funds'. This could affect compliance obligations or p...
Głęboka analiza portfolio
Wykorzystuje:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Przegląd
Moderate opportunityKluczowe fakty
- EUR 3M estimated value
- Services contract
- 1 lot
- Duration 108 MONTH
- Identification and design of a flood relief scheme for Nenagh
- Submission for planning consent
Pokaż pełne podsumowanie
Tipperary County Council is procuring engineering and environmental consultancy services for the Nenagh Flood Relief Scheme. The contract covers identification, design, planning consent, detailed design, and construction oversight of a flood relief scheme. Estimated value €3M, duration 108 months. Open procedure, deadline 5 August 2026. Award criteria details are not provided. EU funding status is inconsistent between structured data (EU-funded) and XML notice (no EU funds). Only the TED notice was analyzed; procurement documents were not examined.
Ryzyka
Award criteria, selection criteria, and detailed requirements are not available in the notice. Without analyzing procur...
Structured data indicates EU-funded, but XML notice states 'no-eu-funds'. This could affect compliance obligations or p...
Analiza może być niepełna
Przeanalizowano tylko część dokumentacji. Pozostałe dokumenty mogą zawierać dodatkowe wymagania, certyfikaty lub dokumenty do złożenia.
Kluczowe wymagania
Technical
- Consultant must handle both engineering and environmental elements
- Project duration of 108 months
Administrative
- Electronic submission required
Wymagania mogą być niepełne.
Zamawiający
Lokalizacja
Clonmel, Nenagh, IRL
Strona
Profil zamawiającego
Identyfikator
32452
Działalność
General public services
Części (1)
LOT-0001
Engineering and Environmental Consultancy Services for Nenagh Flood Relief Scheme
Single lot covering all engineering and environmental consultancy for the flood relief scheme, from initial studies through design, planning, and construction supervision.
EUR 3M
Szacowana wartość
Lokalizacja
Czas trwania
Kategoria
Termin
Szczegóły kryteriów
Background - The OPW, working in partnership with Tipperary County Council and other Local Authorities, commissioned and have completed the Shannon Upper and Lower River Basin Catchment Flood Risk Assessment and Management (CFRAM) Study. The Shannon Upper and Lower River Basin (‘Shannon’) CFRAM Study Area included Nenagh as an Area for Further Assessment (AFA) and identified that a flood relief scheme for the community would be appropriate to be further developed for implementation. To advance and implement a flood relief scheme for Nenagh, Tipperary County Council, supported by a Steering Group, intends to commission a Contract to develop and assist with the implementation of the Scheme. This Contract will be procured using one Consulting firm (hereafter referred to as “the Consultant”) to progress both the Engineering and Environmental elements of the Tender Specification. Project Objectives - The objective of this project is the identification, design and submission for planning consent of a Flood Relief Scheme, that is technically, socially, environmentally and economically acceptable, to alleviate the risk of flooding in the community of Nenagh to a determined Standard of Protection, to complete the detailed design, and to procure, manage and oversee the construction of that Scheme. The tasks that are to be carried out by the Consultant to fulfil this objective are described in detail within the Tender Specification.
Dodatkowe kody CPV
Uwaga do wartości
Pokaż oryginalne dane TED
Oryginalny opis TED
Background - The OPW, working in partnership with Tipperary County Council and other Local Authorities, commissioned and have completed the Shannon Upper and Lower River Basin Catchment Flood Risk Assessment and Management (CFRAM) Study. The Shannon Upper and Lower River Basin (‘Shannon’) CFRAM Study Area included Nenagh as an Area for Further Assessment (AFA) and identified that a flood relief scheme for the community would be appropriate to be further developed for implementation. To advance and implement a flood relief scheme for Nenagh, Tipperary County Council, supported by a Steering Group, intends to commission a Contract to develop and assist with the implementation of the Scheme. This Contract will be procured using one Consulting firm (hereafter referred to as “the Consultant”) to progress both the Engineering and Environmental elements of the Tender Specification. Project Objectives - The objective of this project is the identification, design and submission for planning consent of a Flood Relief Scheme, that is technically, socially, environmentally and economically acceptable, to alleviate the risk of flooding in the community of Nenagh to a determined Standard of Protection, to complete the detailed design, and to procure, manage and oversee the construction of that Scheme. The tasks that are to be carried out by the Consultant to fulfil this objective are described in detail within the Tender Specification.
Szczegóły zamówienia
- Data publikacji
- 24 Jun 2026
- Języki
- English
Metadane referencyjne
- Podstawa prawna
- 32014L0024
Identyfikatory referencyjne
- ID przetargu
- 438414-2026
Dokumenty (2)
Podobne przetargi
Denmark – Technical testing, analysis and consultancy services – Miljøkortlægning, rapportering og prøvetagning
France – Infrastructure works consultancy services – Etude préliminaires / AVP et missions complémentaires) pour l'aménagement du pôle d'échanges Multimodal de la gare de la Verpillière - 2026-2030
France – Engineering services – Maîtrise d'œuvre pour travaux d’extensions, renforcements, renouvellements des réseaux AEP, pour travaux d’extensions, sécurisation, réhabilitations des réseaux EU et pour postes de refoulement.
Denmark – Technical testing, analysis and consultancy services – Udbud af teknisk rådgivning – forundersøgelse klimatilpasning
Italy – Engineering design services for the construction of civil engineering works – PROGRAMMAZIONE FSC 2021 – 2027 - GARA EUROPEA A PROCEDURA APERTA PER L’AFFIDAMENTO DEI SERVIZI TECNICI DI PROGETTAZIONE, DIREZIONE LAVORI E COORDINAMENTO DELLA SICUREZZA IN FASE DI PROGETTAZIONE E ESECUZIONE RELATIVI ALL'INTERVENTO DENOMINATO: “VIABILITA' DI ACCESSO AL NUOVO OSPEDALE DI ANDRIA” - CUP: B81B24000700001
France – Feasibility study, advisory service, analysis – MISSION DE MAITRISE D'OEUVRE RELATIVE A LA REHABILITATION DU RESERVOIR 10 000 N°2 (ET DU RESERVOIR 10 000 N°1) – STATION DE PRODUCTION D’EAU POTABLE DE LA BASTIDE - PHASE CANDIDATURE
Ocena szansy
Skąd ta ocena?
Szansa
60 / 100
Złożoność
70 / 100
Czynniki ryzyka
Award criteria, selection criteria, and detailed requirements are not available in the notice. Without analyzing procur...
Structured data indicates EU-funded, but XML notice states 'no-eu-funds'. This could affect compliance obligations or p...
Głęboka analiza portfolio
Wykorzystuje:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications