EPC-Errichtung Batteriespeicher Moorburg / Construction of the Battery Storage Moorburg
Oryginalny tytuł ogłoszenia
Germany – Construction work for power plant – EPC-Errichtung Batteriespeicher Moorburg / Construction of the Battery Storage Moorburg
Ocena szansy
Skąd ta ocena?
Szansa
50 / 100
Złożoność
85 / 100
Czynniki ryzyka
The entire procedure is subject to receipt of building permit (Section 72 HBauO) and immission control permit (Section...
Award requires approval from the supervisory board of Hamburger Energiewerke. A negative decision leads to cancellation...
Głęboka analiza portfolio
Wykorzystuje:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Przegląd
Moderate opportunityKluczowe fakty
- Works contract
- 1 lot
- EPC turnkey construction of a 200 MW/400-800 MWh battery energy storage system
- Engineering, procurement, construction, commissioning and handover
Pokaż pełne podsumowanie
EPC turnkey construction of a 200 MW / 400-800 MWh battery energy storage system (BESS) in Hamburg, Germany, including long-term O&M and guarantees. Negotiated procedure with prequalification under German and EU law. Subject to building permit and supervisory board approval.
Ryzyka
The entire procedure is subject to receipt of building permit (Section 72 HBauO) and immission control permit (Section...
Award requires approval from the supervisory board of Hamburger Energiewerke. A negative decision leads to cancellation...
Analiza może być niepełna
Przeanalizowano tylko część dokumentacji. Pozostałe dokumenty mogą zawierać dodatkowe wymagania, certyfikaty lub dokumenty do złożenia.
Kluczowe wymagania
Technical
- Procedure subject to building permit (Section 72 HBauO) and supervisory board approval
- Prequalification phase: applications in German or English accepted
Administrative
- Legally binding language is German; final bid must be in German
Zamawiający
Lokalizacja
Hamburg, DEU
Identyfikator
HRB143733
Działalność
Production, transport or distribution of gas or heat
Części (1)
LOT-0001
EPC-Errichtung Batteriespeicher Moorburg / Construction of the Battery Storage Moorburg
Design, procurement, construction, commissioning and handover of a turnkey BESS with 200 MW installed power and 400-800 MWh capacity, including grid connection, multi-year O&M, availability and performance guarantees, degradation coverage, extended warranties, and spare parts stock. Performance location: Hamburg, Germany.
Lokalizacja
Kategoria
Termin
Szczegóły kryteriów
Ziel des Vorhabens ist die Errichtung eines betriebsbereiten Batteriespeichers mit einer installierten Leistung von 200 MW und einer Speicherkapazität zwischen 400 und 800 MWh. Die Anlage ist als kommerziell betriebene Anlage konzipiert und vorrangig auf die Teilnahme am Stromgroßhandel (Day-Ahead und Intraday) sowie an den Regelenergiemärkten ausgerichtet und sie soll einen Beitrag zur Stabilisierung des Stromnetzes leisten, die Integration erneuerbarer Energien unterstützen und Flexibilität im Energiesystem bereitstellen. Die Realisierung erfolgt vollumfänglich über einen EPC-Vertrag. Der Auftragnehmer übernimmt die Gesamtverantwortung für Planung, Beschaffung, Errichtung, Inbetriebnahme und Übergabe der schlüsselfertigen Anlage. Die Liefer- und Leistungsgrenze bildet das Umspannwerk, an das der Speicher angeschlossen wird. Darüber hinaus umfasst die Ausschreibung den geordneten Übergang in den Betrieb sowie langfristige betriebliche Absicherungen. Hierzu zählen insbesondere ein mehrjähriger Betriebs- und Wartungsvertrag (O&M), Verfügbarkeits- und Leistungsgarantien einschließlich der Absicherung der Kapazität über die Lebensdauer (Degradation), erweiterte Gewährleistungs- und Langzeitgarantien sowie eine gesicherte Ersatzteilbevorratung. Ziel ist ein über den gesamten Lebenszyklus zuverlässiger und wirtschaftlicher Anlagenbetrieb. The objective of the project is the construction of an operational battery storage facility with an installed power of 200 MW and a storage capacity between 400 and 800 MWh. The plant is designed as a commercially operated facility and is primarily geared towards participation in the wholesale electricity market (day-ahead and intraday) and the balancing energy markets. It is intended to contribute to the stabilisation of the power grid, support the integration of renewable energies and provide flexibility within the energy system. The project is realised entirely under an EPC contract. The contractor assumes overall responsibility for the design, procurement, construction, commissioning and handover of the turnkey plant. The supply and performance boundary is formed by the substation to which the storage facility is connected. In addition, the tender covers the transition into operation as well as long-term operational safeguards. These include in particular a multi-year operation and maintenance contract (O&M), availability and performance guarantees including safeguarding of the capacity over the service life (degradation), extended warranty and long-term guarantees as well as a secured spare parts stock. The objective is reliable and economic plant operation throughout the entire life cycle.
Dodatkowe kody CPV
Uwaga do wartości
Pokaż oryginalne dane TED
Oryginalny opis TED
Ziel des Vorhabens ist die Errichtung eines betriebsbereiten Batteriespeichers mit einer installierten Leistung von 200 MW und einer Speicherkapazität zwischen 400 und 800 MWh. Die Anlage ist als kommerziell betriebene Anlage konzipiert und vorrangig auf die Teilnahme am Stromgroßhandel (Day-Ahead und Intraday) sowie an den Regelenergiemärkten ausgerichtet und sie soll einen Beitrag zur Stabilisierung des Stromnetzes leisten, die Integration erneuerbarer Energien unterstützen und Flexibilität im Energiesystem bereitstellen. Die Realisierung erfolgt vollumfänglich über einen EPC-Vertrag. Der Auftragnehmer übernimmt die Gesamtverantwortung für Planung, Beschaffung, Errichtung, Inbetriebnahme und Übergabe der schlüsselfertigen Anlage. Die Liefer- und Leistungsgrenze bildet das Umspannwerk, an das der Speicher angeschlossen wird. Darüber hinaus umfasst die Ausschreibung den geordneten Übergang in den Betrieb sowie langfristige betriebliche Absicherungen. Hierzu zählen insbesondere ein mehrjähriger Betriebs- und Wartungsvertrag (O&M), Verfügbarkeits- und Leistungsgarantien einschließlich der Absicherung der Kapazität über die Lebensdauer (Degradation), erweiterte Gewährleistungs- und Langzeitgarantien sowie eine gesicherte Ersatzteilbevorratung. Ziel ist ein über den gesamten Lebenszyklus zuverlässiger und wirtschaftlicher Anlagenbetrieb. The objective of the project is the construction of an operational battery storage facility with an installed power of 200 MW and a storage capacity between 400 and 800 MWh. The plant is designed as a commercially operated facility and is primarily geared towards participation in the wholesale electricity market (day-ahead and intraday) and the balancing energy markets. It is intended to contribute to the stabilisation of the power grid, support the integration of renewable energies and provide flexibility within the energy system. The project is realised entirely under an EPC contract. The contractor assumes overall responsibility for the design, procurement, construction, commissioning and handover of the turnkey plant. The supply and performance boundary is formed by the substation to which the storage facility is connected. In addition, the tender covers the transition into operation as well as long-term operational safeguards. These include in particular a multi-year operation and maintenance contract (O&M), availability and performance guarantees including safeguarding of the capacity over the service life (degradation), extended warranty and long-term guarantees as well as a secured spare parts stock. The objective is reliable and economic plant operation throughout the entire life cycle.
Szczegóły zamówienia
- Data publikacji
- 23 Jun 2026
- Języki
- German
Metadane referencyjne
- Podstawa prawna
- 32014L0025
Identyfikatory referencyjne
- ID przetargu
- 430708-2026
Dokumenty (2)
Podobne przetargi
Netherlands – Heat pumps – Verduurzaming dorpshuis "Swanla"
Portugal – Construction work for power plant – PRC_0370/2024_GAE-O1166 - Empreitada de Conceção-Construção de Centrais Fotovoltaicas para Autoconsumo III
Switzerland – Electricity distribution and control apparatus – Gebäude-Transformatorenstation 2026-2031
Spain – Batteries – Baterías y fungibles para equipos SAI ABB en sedes CRTVE
Denmark – Cycles with auxiliary motors – Elcykler, ladcykler og tibehør
Denmark – Servers – 02.03 Servere og storage (DIS)
Ocena szansy
Skąd ta ocena?
Szansa
50 / 100
Złożoność
85 / 100
Czynniki ryzyka
The entire procedure is subject to receipt of building permit (Section 72 HBauO) and immission control permit (Section...
Award requires approval from the supervisory board of Hamburger Energiewerke. A negative decision leads to cancellation...