Tenderwize
Wróć do wyszukiwania

EPC-Errichtung Batteriespeicher Moorburg / Construction of the Battery Storage Moorburg

Hamburger Energiewerke Energie Hub Moorburg GmbH·Hamburg, Germany·Expired · Jul 20, 2026·Neg W Call·Works
Oryginalny tytuł ogłoszenia

Germany – Construction work for power plant – EPC-Errichtung Batteriespeicher Moorburg / Construction of the Battery Storage Moorburg

50/100

Ocena szansy

Needs reviewHigh complexity
WorksExpired
Skąd ta ocena?

Szansa

50 / 100

Złożoność

85 / 100

Czynniki ryzyka

The entire procedure is subject to receipt of building permit (Section 72 HBauO) and immission control permit (Section...

Award requires approval from the supervisory board of Hamburger Energiewerke. A negative decision leads to cancellation...

Głęboka analiza portfolio

Głęboka analiza dopasowania firmy

Wykorzystuje:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Przegląd

Moderate opportunity

Kluczowe fakty

  • Works contract
  • 1 lot
  • EPC turnkey construction of a 200 MW/400-800 MWh battery energy storage system
  • Engineering, procurement, construction, commissioning and handover
Pokaż pełne podsumowanie

EPC turnkey construction of a 200 MW / 400-800 MWh battery energy storage system (BESS) in Hamburg, Germany, including long-term O&M and guarantees. Negotiated procedure with prequalification under German and EU law. Subject to building permit and supervisory board approval.

Ryzyka

The entire procedure is subject to receipt of building permit (Section 72 HBauO) and immission control permit (Section...

Award requires approval from the supervisory board of Hamburger Energiewerke. A negative decision leads to cancellation...

Analiza może być niepełna

Przeanalizowano tylko część dokumentacji. Pozostałe dokumenty mogą zawierać dodatkowe wymagania, certyfikaty lub dokumenty do złożenia.

Kluczowe wymagania

Technical

  • Procedure subject to building permit (Section 72 HBauO) and supervisory board approval
  • Prequalification phase: applications in German or English accepted

Administrative

  • Legally binding language is German; final bid must be in German

Zamawiający

Lokalizacja

Hamburg, DEU

Identyfikator

HRB143733

Działalność

Production, transport or distribution of gas or heat

Części (1)

LOT-0001

EPC-Errichtung Batteriespeicher Moorburg / Construction of the Battery Storage Moorburg

Design, procurement, construction, commissioning and handover of a turnkey BESS with 200 MW installed power and 400-800 MWh capacity, including grid connection, multi-year O&M, availability and performance guarantees, degradation coverage, extended warranties, and spare parts stock. Performance location: Hamburg, Germany.

WorksEU fundedElectronic submission

Lokalizacja

Hamburg, Germany

Kategoria

Construction work for power plant

Termin

Expired Jul 20, 2026

Szczegóły zamówienia

Data publikacji
23 Jun 2026
Języki
German

Metadane referencyjne

Podstawa prawna
32014L0025

Identyfikatory referencyjne

ID przetargu
430708-2026

Dokumenty (2)

Podobne przetargi