Intelligent Transport Systems Equipment Framework Generation 2
Oryginalny tytuł ogłoszenia
Ireland – Installation of signalling equipment – Intelligent Transport Systems Equipment Frameworks Generation 2
Ocena szansy
Skąd ta ocena?
Szansa
60 / 100
Złożoność
75 / 100
Czynniki ryzyka
Estimated overall contract amount (€42.7M) is significantly lower than the total framework maximum (€75M). Actual spend...
For Lots 3A-3F, no immediate call-off contract; TII may not issue any task orders for extended periods.
Głęboka analiza portfolio
Wykorzystuje:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Przegląd
Moderate opportunityKluczowe fakty
- EUR 42.7M estimated value
- Framework procurement
- Works contract
- 3 lots
- Duration 4 YEAR
- Supply, installation, integration, and commissioning of Intelligent Transport Systems (ITS) equipment across the Irish national road network
- Includes CCTV, VMS, ANPR, TMUs, AMI, cabinets, ERT, RSU/OBU, ANPR/CCTV, and speed limit signs
Pokaż pełne podsumowanie
Transport Infrastructure Ireland (TII) seeks to establish nine framework agreements for Intelligent Transport Systems (ITS) equipment under the TII492 programme. Lots 1, 2, and 3A-3F cover ITS equipment for TII's national road network, including installation, integration, and commissioning. Lot 4 is a separate framework for local authorities to procure Periodic School Limit signs. The framework term is 4 years. The overall estimated maximum value is €75 million (€27M for Lots 1-3F, €48M for Lot 4), though structured data shows an estimated value of €42.7 million. The procedure is open with a submission deadline of 14 July 2026.
Ryzyka
Estimated overall contract amount (€42.7M) is significantly lower than the total framework maximum (€75M). Actual spend...
For Lots 3A-3F, no immediate call-off contract; TII may not issue any task orders for extended periods.
Analiza może być niepełna
Przeanalizowano tylko część dokumentacji. Pozostałe dokumenty mogą zawierać dodatkowe wymagania, certyfikaty lub dokumenty do złożenia.
Kluczowe wymagania
Technical
- Must be able to deliver end-to-end ITS solutions including civil works
- Cybersecurity and safety compliance required
- Lots 3A-3F do not have immediate call-off contracts; works are ordered as needed via quotations and task orders
Zamawiający
Lokalizacja
Dublin, IRL
Strona
Profil zamawiającego
Identyfikator
4115929RH
Działalność
General public services
Części (9)
LOT-0001
Lot 1 multi-supplier framework agreement for ITS equipment exceeding €500,000
Multi-supplier framework for ITS equipment supply, installation, integration, and commissioning across national road network. Includes CCTV, VMS, ANPR, TMUs. Traffic management, PSCS duties, integration with TII systems. Framework term 4 years.
EUR 42.7M
Szacowana wartość
Lokalizacja
Czas trwania
Kategoria
Termin
Szczegóły kryteriów
Lot 1 is a multi-supplier framework agreement for ITS equipment exceeding €500,000. This framework provides for the supply, installation, integration, and commissioning of ITS equipment across the national road network. Works include the provision and installation of roadside electronic systems (e.g. CCTV, VMS, ANPR, TMUs), together with testing, commissioning, and integration into existing TII and third-party platforms. The Contractor will be responsible for traffic management, PSCS duties, stakeholder coordination, and integration with TII and third-party systems, and shall ensure that all equipment is operational and compliant with applicable technical, software, cybersecurity, and safety requirements. The frameworks deliver end-to-end ITS solutions, from supply through to live system operation.
Dodatkowe kody CPV
Uwaga do wartości
Maksymalna wartość umowy ramowej
Pokaż oryginalne dane TED
Oryginalny opis TED
Lot 1 is a multi-supplier framework agreement for ITS equipment exceeding €500,000. This framework provides for the supply, installation, integration, and commissioning of ITS equipment across the national road network. Works include the provision and installation of roadside electronic systems (e.g. CCTV, VMS, ANPR, TMUs), together with testing, commissioning, and integration into existing TII and third-party platforms. The Contractor will be responsible for traffic management, PSCS duties, stakeholder coordination, and integration with TII and third-party systems, and shall ensure that all equipment is operational and compliant with applicable technical, software, cybersecurity, and safety requirements. The frameworks deliver end-to-end ITS solutions, from supply through to live system operation.
LOT-0002
Lot 2 single-supplier framework agreement for ITS equipment valued at less than €500,000
Single-supplier framework for ITS equipment valued under €500,000. Supply, installation, integration, commissioning. Includes CCTV, VMS, ANPR, TMUs. Initial call-off contract awarded in parallel with framework.
EUR 42.7M
Szacowana wartość
Lokalizacja
Czas trwania
Kategoria
Termin
Szczegóły kryteriów
Lot 2 is a single-supplier framework agreement for ITS equipment valued at less than €500,000. This framework provides for the supply, installation, integration, and commissioning of ITS equipment across the national road network. Works include the provision and installation of roadside electronic systems (e.g. CCTV, VMS, ANPR, TMUs), together with testing, commissioning, and integration into existing TII and third-party platforms. The Contractor will be responsible for traffic management, PSCS duties, stakeholder coordination, and integration with TII and third-party systems, and shall ensure that all equipment is operational and compliant with applicable technical, software, cybersecurity, and safety requirements. The frameworks deliver end-to-end ITS solutions, from supply through to live system operation. Please Note : Transport Infrastructure Ireland (TII) intends to award the framework agreement and the initial call-off contract in parallel to the highest-ranked bidder. Works under the contract will be issued by way of task orders, meaning the appointed contractor will be contractually obliged to deliver the specified works as and when required by TII. Both the framework agreement and the initial call-off contract will have a duration of four years. However, individual task orders issued during this period may extend beyond the end of the framework term, where permitted under the contract.
Dodatkowe kody CPV
Uwaga do wartości
Maksymalna wartość umowy ramowej
Pokaż oryginalne dane TED
Oryginalny opis TED
Lot 2 is a single-supplier framework agreement for ITS equipment valued at less than €500,000. This framework provides for the supply, installation, integration, and commissioning of ITS equipment across the national road network. Works include the provision and installation of roadside electronic systems (e.g. CCTV, VMS, ANPR, TMUs), together with testing, commissioning, and integration into existing TII and third-party platforms. The Contractor will be responsible for traffic management, PSCS duties, stakeholder coordination, and integration with TII and third-party systems, and shall ensure that all equipment is operational and compliant with applicable technical, software, cybersecurity, and safety requirements. The frameworks deliver end-to-end ITS solutions, from supply through to live system operation. Please Note : Transport Infrastructure Ireland (TII) intends to award the framework agreement and the initial call-off contract in parallel to the highest-ranked bidder. Works under the contract will be issued by way of task orders, meaning the appointed contractor will be contractually obliged to deliver the specified works as and when required by TII. Both the framework agreement and the initial call-off contract will have a duration of four years. However, individual task orders issued during this period may extend beyond the end of the framework term, where permitted under the contract.
LOT-0003
Lot 3A single-supplier framework agreement for Advanced Matrix Indicators (AMI) and Variable Message Signs (VMS)
Single-supplier framework for supply, installation, testing, integration, commissioning of AMI and VMS. No immediate call-off contract; TII will request quotations as needed.
EUR 42.7M
Szacowana wartość
Lokalizacja
Czas trwania
Kategoria
Termin
Szczegóły kryteriów
The scope includes the supply, installation, testing, integration, commissioning, and handover of ITS equipment, comprising: • Lot 3A: Advanced Matrix Indicators (AMI) and Variable Message Signs (VMS) The Contractor shall deliver the Works at specified locations, coordinate with relevant stakeholders, and ensure full integration with TII systems. Responsibilities will include traffic management, PSCS duties, and compliance with all applicable statutory, safety, technical, and operational requirements. Please note: No call-off contract will be issued immediately upon award of Lot 3A Instead, once a specific requirement is identified, TII will request a quotation from the contractor and, subject to agreement, will enter into a call-off contract. The call-off contract will remain in place for the remaining duration of the framework. For example, where a call-off contract is established six months after the framework commencement, the contract duration will extend for the remaining three and a half years. This contract will cover the delivery of the initial scope of works and provide for the instruction of additional work, as required, through task orders over its duration. This approach ensures that contractors are contractually obliged to deliver works as and when required, while avoiding the need for them to maintain insurances, and associated overheads in advance of any confirmed workload.
Dodatkowe kody CPV
Uwaga do wartości
Maksymalna wartość umowy ramowej
Pokaż oryginalne dane TED
Oryginalny tytuł części
Lot 3A single-supplier framework agreement for Advanced Matrix Indicators (AMI) and Variable Message Signs (VMS)
Oryginalny opis TED
The scope includes the supply, installation, testing, integration, commissioning, and handover of ITS equipment, comprising: • Lot 3A: Advanced Matrix Indicators (AMI) and Variable Message Signs (VMS) The Contractor shall deliver the Works at specified locations, coordinate with relevant stakeholders, and ensure full integration with TII systems. Responsibilities will include traffic management, PSCS duties, and compliance with all applicable statutory, safety, technical, and operational requirements. Please note: No call-off contract will be issued immediately upon award of Lot 3A Instead, once a specific requirement is identified, TII will request a quotation from the contractor and, subject to agreement, will enter into a call-off contract. The call-off contract will remain in place for the remaining duration of the framework. For example, where a call-off contract is established six months after the framework commencement, the contract duration will extend for the remaining three and a half years. This contract will cover the delivery of the initial scope of works and provide for the instruction of additional work, as required, through task orders over its duration. This approach ensures that contractors are contractually obliged to deliver works as and when required, while avoiding the need for them to maintain insurances, and associated overheads in advance of any confirmed workload.
LOT-0004
Lot 3B single-supplier framework agreement for Cabinets and ancillary equipment
The scope includes the supply, installation, testing, integration, commissioning, and handover of ITS equipment, comprising: • Lot 3B: Cabinets and ancillary equipment The Contractor shall deliver the Works at specified locations, coordinate with relevant stakeholders, and ensure full integration with TII systems. Responsibilities will include traffic management, PSCS duties, and compliance with all applicable statutory, safety, technical, and operational requirements. Please note: No call-off contract will be issued immediately upon award of Lot 3B Instead, once a specific requirement is identified, TII will request a quotation from the contractor and, subject to agreement, will enter into a call-off contract. The call-off contract will remain in place for the remaining duration of the framework. For example, where a call-off contract is established six months after the framework commencement, the contract duration will extend for the remaining three and a half years. This contract will cover the delivery of the initial scope of works and provide for the instruction of additional work, as required, through task orders over its duration. This approach ensures that contractors are contractually obliged to deliver works as and when required, while avoiding the need for them to maintain insurances, and associated overheads in advance of any confirmed workload.
EUR 42.7M
Szacowana wartość
Lokalizacja
Czas trwania
Kategoria
Szczegóły kryteriów
The scope includes the supply, installation, testing, integration, commissioning, and handover of ITS equipment, comprising: • Lot 3B: Cabinets and ancillary equipment The Contractor shall deliver the Works at specified locations, coordinate with relevant stakeholders, and ensure full integration with TII systems. Responsibilities will include traffic management, PSCS duties, and compliance with all applicable statutory, safety, technical, and operational requirements. Please note: No call-off contract will be issued immediately upon award of Lot 3B Instead, once a specific requirement is identified, TII will request a quotation from the contractor and, subject to agreement, will enter into a call-off contract. The call-off contract will remain in place for the remaining duration of the framework. For example, where a call-off contract is established six months after the framework commencement, the contract duration will extend for the remaining three and a half years. This contract will cover the delivery of the initial scope of works and provide for the instruction of additional work, as required, through task orders over its duration. This approach ensures that contractors are contractually obliged to deliver works as and when required, while avoiding the need for them to maintain insurances, and associated overheads in advance of any confirmed workload.
Dodatkowe kody CPV
Maksymalna wartość umowy ramowej
LOT-0005
Lot 3C single-supplier framework agreement for Traffic Monitoring Units (TMU), Cycle Monitoring Units (CMU), Automatic Incident Detectors (AID)
The scope includes the supply, installation, testing, integration, commissioning, and handover of ITS equipment, comprising: • Lot 3C: Traffic Monitoring Units (TMU), Cycle Monitoring Units (CMU), Automatic Incident Detectors (AID) Responsibilities will include traffic management, PSCS duties, and compliance with all applicable statutory, safety, technical, and operational requirements. Please note: No call-off contract will be issued immediately upon award of Lot 3C Instead, once a specific requirement is identified, TII will request a quotation from the contractor and, subject to agreement, will enter into a call-off contract. The call-off contract will remain in place for the remaining duration of the framework. For example, where a call-off contract is established six months after the framework commencement, the contract duration will extend for the remaining three and a half years. This contract will cover the delivery of the initial scope of works and provide for the instruction of additional work, as required, through task orders over its duration. This approach ensures that contractors are contractually obliged to deliver works as and when required, while avoiding the need for them to maintain insurances, and associated overheads in advance of any confirmed workload.
EUR 42.7M
Szacowana wartość
Lokalizacja
Czas trwania
Kategoria
Szczegóły kryteriów
The scope includes the supply, installation, testing, integration, commissioning, and handover of ITS equipment, comprising: • Lot 3C: Traffic Monitoring Units (TMU), Cycle Monitoring Units (CMU), Automatic Incident Detectors (AID) Responsibilities will include traffic management, PSCS duties, and compliance with all applicable statutory, safety, technical, and operational requirements. Please note: No call-off contract will be issued immediately upon award of Lot 3C Instead, once a specific requirement is identified, TII will request a quotation from the contractor and, subject to agreement, will enter into a call-off contract. The call-off contract will remain in place for the remaining duration of the framework. For example, where a call-off contract is established six months after the framework commencement, the contract duration will extend for the remaining three and a half years. This contract will cover the delivery of the initial scope of works and provide for the instruction of additional work, as required, through task orders over its duration. This approach ensures that contractors are contractually obliged to deliver works as and when required, while avoiding the need for them to maintain insurances, and associated overheads in advance of any confirmed workload.
Dodatkowe kody CPV
Maksymalna wartość umowy ramowej
LOT-0006
Lot 3D single-supplier framework agreement for Emergency Roadside Telephones (ERT)
The scope includes the supply, installation, testing, integration, commissioning, and handover of ITS equipment, comprising: • Lot 3D: Emergency Roadside Telephones (ERT) The Contractor shall deliver the Works at specified locations, coordinate with relevant stakeholders, and ensure full integration with TII systems. Responsibilities will include traffic management, PSCS duties, and compliance with all applicable statutory, safety, technical, and operational requirements. Please note: No call-off contract will be issued immediately upon award of Lot 3D Instead, once a specific requirement is identified, TII will request a quotation from the contractor and, subject to agreement, will enter into a call-off contract. The call-off contract will remain in place for the remaining duration of the framework. For example, where a call-off contract is established six months after the framework commencement, the contract duration will extend for the remaining three and a half years. This contract will cover the delivery of the initial scope of works and provide for the instruction of additional work, as required, through task orders over its duration. This approach ensures that contractors are contractually obliged to deliver works as and when required, while avoiding the need for them to maintain insurances, and associated overheads in advance of any confirmed workload.
EUR 42.7M
Szacowana wartość
Lokalizacja
Czas trwania
Kategoria
Szczegóły kryteriów
The scope includes the supply, installation, testing, integration, commissioning, and handover of ITS equipment, comprising: • Lot 3D: Emergency Roadside Telephones (ERT) The Contractor shall deliver the Works at specified locations, coordinate with relevant stakeholders, and ensure full integration with TII systems. Responsibilities will include traffic management, PSCS duties, and compliance with all applicable statutory, safety, technical, and operational requirements. Please note: No call-off contract will be issued immediately upon award of Lot 3D Instead, once a specific requirement is identified, TII will request a quotation from the contractor and, subject to agreement, will enter into a call-off contract. The call-off contract will remain in place for the remaining duration of the framework. For example, where a call-off contract is established six months after the framework commencement, the contract duration will extend for the remaining three and a half years. This contract will cover the delivery of the initial scope of works and provide for the instruction of additional work, as required, through task orders over its duration. This approach ensures that contractors are contractually obliged to deliver works as and when required, while avoiding the need for them to maintain insurances, and associated overheads in advance of any confirmed workload.
Dodatkowe kody CPV
Maksymalna wartość umowy ramowej
LOT-0007
Lot 3E single-supplier framework agreement for Roadside Units (RSU) and On-Board Units (OBU)
The scope includes the supply, installation, testing, integration, commissioning, and handover of ITS equipment, comprising: • Lot 3E: Roadside Units (RSU) and On-Board Units (OBU) The Contractor shall deliver the Works at specified locations, coordinate with relevant stakeholders, and ensure full integration with TII systems. Responsibilities will include traffic management, PSCS duties, and compliance with all applicable statutory, safety, technical, and operational requirements. Please note: No call-off contract will be issued immediately upon award of Lot 3E Instead, once a specific requirement is identified, TII will request a quotation from the contractor and, subject to agreement, will enter into a call-off contract. The call-off contract will remain in place for the remaining duration of the framework. For example, where a call-off contract is established six months after the framework commencement, the contract duration will extend for the remaining three and a half years. This contract will cover the delivery of the initial scope of works and provide for the instruction of additional work, as required, through task orders over its duration. This approach ensures that contractors are contractually obliged to deliver works as and when required, while avoiding the need for them to maintain insurances, and associated overheads in advance of any confirmed workload.
EUR 42.7M
Szacowana wartość
Lokalizacja
Czas trwania
Kategoria
Szczegóły kryteriów
The scope includes the supply, installation, testing, integration, commissioning, and handover of ITS equipment, comprising: • Lot 3E: Roadside Units (RSU) and On-Board Units (OBU) The Contractor shall deliver the Works at specified locations, coordinate with relevant stakeholders, and ensure full integration with TII systems. Responsibilities will include traffic management, PSCS duties, and compliance with all applicable statutory, safety, technical, and operational requirements. Please note: No call-off contract will be issued immediately upon award of Lot 3E Instead, once a specific requirement is identified, TII will request a quotation from the contractor and, subject to agreement, will enter into a call-off contract. The call-off contract will remain in place for the remaining duration of the framework. For example, where a call-off contract is established six months after the framework commencement, the contract duration will extend for the remaining three and a half years. This contract will cover the delivery of the initial scope of works and provide for the instruction of additional work, as required, through task orders over its duration. This approach ensures that contractors are contractually obliged to deliver works as and when required, while avoiding the need for them to maintain insurances, and associated overheads in advance of any confirmed workload.
Dodatkowe kody CPV
Maksymalna wartość umowy ramowej
LOT-0008
Lot 3F single-supplier framework agreement for Automatic Number Plate Recognition (ANPR) and Closed-Circuit Television (CCTV) cameras
The scope includes the supply, installation, testing, integration, commissioning, and handover of ITS equipment, comprising: • Lot 3F: Automatic Number Plate Recognition (ANPR) and Closed-Circuit Television (CCTV) cameras. The Contractor shall deliver the Works at specified locations, coordinate with relevant stakeholders, and ensure full integration with TII systems. Responsibilities will include traffic management, PSCS duties, and compliance with all applicable statutory, safety, technical, and operational requirements. Please note: No call-off contract will be issued immediately upon award of Lot 3F Instead, once a specific requirement is identified, TII will request a quotation from the contractor and, subject to agreement, will enter into a call-off contract. The call-off contract will remain in place for the remaining duration of the framework. For example, where a call-off contract is established six months after the framework commencement, the contract duration will extend for the remaining three and a half years. This contract will cover the delivery of the initial scope of works and provide for the instruction of additional work, as required, through task orders over its duration. This approach ensures that contractors are contractually obliged to deliver works as and when required, while avoiding the need for them to maintain insurances, and associated overheads in advance of any confirmed workload.
EUR 42.7M
Szacowana wartość
Lokalizacja
Czas trwania
Kategoria
Szczegóły kryteriów
The scope includes the supply, installation, testing, integration, commissioning, and handover of ITS equipment, comprising: • Lot 3F: Automatic Number Plate Recognition (ANPR) and Closed-Circuit Television (CCTV) cameras. The Contractor shall deliver the Works at specified locations, coordinate with relevant stakeholders, and ensure full integration with TII systems. Responsibilities will include traffic management, PSCS duties, and compliance with all applicable statutory, safety, technical, and operational requirements. Please note: No call-off contract will be issued immediately upon award of Lot 3F Instead, once a specific requirement is identified, TII will request a quotation from the contractor and, subject to agreement, will enter into a call-off contract. The call-off contract will remain in place for the remaining duration of the framework. For example, where a call-off contract is established six months after the framework commencement, the contract duration will extend for the remaining three and a half years. This contract will cover the delivery of the initial scope of works and provide for the instruction of additional work, as required, through task orders over its duration. This approach ensures that contractors are contractually obliged to deliver works as and when required, while avoiding the need for them to maintain insurances, and associated overheads in advance of any confirmed workload.
Dodatkowe kody CPV
Maksymalna wartość umowy ramowej
LOT-0009
Lot 4 multi-supplier Framework Agreement for ITS equipment (Speed Limit signage)
Lot 4 provides for the supply, installation, integration, and commissioning of Dynamic Warning Signs, thereby establishing a framework agreement through which local authorities may procure speed limit signage, including Periodic School Limit signs, at schools nationwide. The Contractor shall be responsible for delivery of fully operational systems, including coordination with other contractors and integration with existing TII platforms (e.g. NIMS, ATMS, AFMS). Key obligations include traffic management, PSCS duties, subcontractor management, and compliance with applicable safety, technical, and cybersecurity requirements. The scope also includes software provision, system integration, remote monitoring capability, and full handover, ensuring all equipment operates effectively within the existing network. Please Note: Following engagement with the Department of Transport, Lot 4 has been introduced to address a significant and time-critical national requirement arising from the national speed limit review. The Department has issued a ministerial circular requiring local authorities to adopt special speed limit bye-laws for school zones by the end of October 2026 and to implement the associated signage by March 2027. This has resulted in a substantial and urgent demand for Periodic Speed Limit Signs (PSLS). Lot 4 establishes a framework agreement through which local authorities may procure these works. TII’s role will be limited to establishing and managing the framework agreement, including overseeing eTenders system and monitoring of framework ceiling values. Local authorities will be responsible for conducting mini-competitions and funding all resulting call-off contracts. TII does not currently anticipate direct use of Lot 4 but retains the option to utilise the framework should a requirement arise.
EUR 42.7M
Szacowana wartość
Lokalizacja
Czas trwania
Kategoria
Szczegóły kryteriów
Lot 4 provides for the supply, installation, integration, and commissioning of Dynamic Warning Signs, thereby establishing a framework agreement through which local authorities may procure speed limit signage, including Periodic School Limit signs, at schools nationwide. The Contractor shall be responsible for delivery of fully operational systems, including coordination with other contractors and integration with existing TII platforms (e.g. NIMS, ATMS, AFMS). Key obligations include traffic management, PSCS duties, subcontractor management, and compliance with applicable safety, technical, and cybersecurity requirements. The scope also includes software provision, system integration, remote monitoring capability, and full handover, ensuring all equipment operates effectively within the existing network. Please Note: Following engagement with the Department of Transport, Lot 4 has been introduced to address a significant and time-critical national requirement arising from the national speed limit review. The Department has issued a ministerial circular requiring local authorities to adopt special speed limit bye-laws for school zones by the end of October 2026 and to implement the associated signage by March 2027. This has resulted in a substantial and urgent demand for Periodic Speed Limit Signs (PSLS). Lot 4 establishes a framework agreement through which local authorities may procure these works. TII’s role will be limited to establishing and managing the framework agreement, including overseeing eTenders system and monitoring of framework ceiling values. Local authorities will be responsible for conducting mini-competitions and funding all resulting call-off contracts. TII does not currently anticipate direct use of Lot 4 but retains the option to utilise the framework should a requirement arise.
Dodatkowe kody CPV
Maksymalna wartość umowy ramowej
Szczegóły zamówienia
- Data publikacji
- 23 Jun 2026
- Języki
- English
Metadane referencyjne
- Podstawa prawna
- 32014L0024
Identyfikatory referencyjne
- ID przetargu
- 430387-2026
Dokumenty (2)
Podobne przetargi
Poland – Software package and information systems – Rozbudowa SOSRD o udostępnianie w czasie rzeczywistym danych o natężeniu ruchu wraz z ich klasyfikacją
Poland – Cycle path construction work – Regionalne ścieżki rowerowe VeloMałopolska: budowa trasy VeloSkawa na odcinku Graboszyce – Podolsze
France – Preventive maintenance services – SECONDE CONSULTATION - RELANCE DES LOTS N° 07, 16, 20, 22, 28 ET 43 - PRESTATIONS DE MAINTENANCES, CONTROLES REGLEMENTAIRES, DIAGNOSTICS, INTERVENTIONS DEPANNAGES ET D'URGENCES, TRAVAUX CORRECTIFS ET DE MISE EN CONFORMITE DES EQUIPEMENTS LIES AUX BATIMENTS
Germany – Installation of traffic guidance equipment – Kreuzungsfreier Ausbau Frankenschnellweg, Abschnitt West: bauzeitliche Verkehrssicherung im Zuge von Baumaßnahmen
Denmark – Partially underground railway works – Copenhagen - New Metroline, M5 Transportation System
France – Repair and maintenance of plant – Travaux d’entretien et de réparations courantes pour le GHT Yvelines Nord
Ocena szansy
Skąd ta ocena?
Szansa
60 / 100
Złożoność
75 / 100
Czynniki ryzyka
Estimated overall contract amount (€42.7M) is significantly lower than the total framework maximum (€75M). Actual spend...
For Lots 3A-3F, no immediate call-off contract; TII may not issue any task orders for extended periods.