Tenderwize
Wróć do wyszukiwania

Design and Construction of Grade-Separated Junction on A1

COMPANIA NATIONALA DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A.·Cluj-Napoca, Romania·RON 149.1M | EUR 28.5M·Expired · Jul 09, 2026·Open·Works
High valueStructured notice only
Oryginalny tytuł ogłoszenia

Romania – Construction work for highways, roads – Proiectare si Executie Nod Rutier A1 (km 326+155) – DJ 704 (Cugir)

70/100

Ocena szansy

Needs reviewHigh complexity
WorksExpired
Skąd ta ocena?

Szansa

70 / 100

Złożoność

75 / 100

Czynniki ryzyka

Short deadline (21 days) for preparing a complex bid may lead to incomplete proposals.

Strict experience criteria for key personnel (Project Manager, Design Team Leader, Road Design Engineer) may disqualify...

Głęboka analiza portfolio

Głęboka analiza dopasowania firmy

Wykorzystuje:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Przegląd

Moderate opportunity

Kluczowe fakty

  • RON 149.1M estimated value
  • Works contract
  • 1 lot
  • Duration 78 MONTH
  • Design and construction of a grade-separated junction (Nod Rutier) on A1 highway at km 326+155, connecting to DJ 704 (Cugir).
  • Contract includes potential modifications as per HG 1/2018 (changes in parties, technical solutions, environmental requirements, archaeological discharge, etc.).
Pokaż pełne podsumowanie

The contracting authority, CNAIR through DRDP Brasov, is procuring design and construction of a grade-separated junction (Nod Rutier) on the A1 highway at km 326+155, connecting to DJ 704 (Cugir). The contract covers both design and execution, with a 78-month duration and an estimated value of RON 149,112,769.48 (approx EUR 28.5M). Procedure is open, with deadline 9 July 2026. Award based on best price-quality ratio (price 40%, quality 60% including warranty, experience, and methodology).

Ryzyka

Short deadline (21 days) for preparing a complex bid may lead to incomplete proposals.

Strict experience criteria for key personnel (Project Manager, Design Team Leader, Road Design Engineer) may disqualify...

Analiza może być niepełna

Przeanalizowano tylko część dokumentacji. Pozostałe dokumenty mogą zawierać dodatkowe wymagania, certyfikaty lub dokumenty do złożenia.

Kluczowe wymagania

Technical

  • EU-funded project.

Administrative

  • Open procedure with electronic submission via SEAP (Otwórz portal).
  • Language: Romanian.

Wymagania mogą być niepełne.

Kryteria udzielenia

Lot 1

Price (40%): lowest price gets maximum points, others proportionally.40%Warranty period (12%): minimum 60 months, maximum points at 120 months, 0.20 points per extra month.12%Project Manager experience (10%): points for number of relevant contracts (2, 3, 4+).10%Design Team Leader experience (10%): points for number of relevant contracts.10%Road Design Engineer experience (10%): points for number of relevant contracts.10%Methodology (18%): assessed on completeness and integration of technical, human, and environmental aspects.18%

Zamawiający

Lokalizacja

Cluj-Napoca, ROU

Profil zamawiającego

Otwórz profil

Identyfikator

16054368

Działalność

General public services

Części (1)

LOT-0000

Design and Construction of Grade-Separated Junction on A1

Design and execution of a road junction (grade-separated) on A1 at km 326+155, connecting to DJ 704 (Cugir). Includes potential modifications as listed in contract. Duration 78 months. Estimated value RON 149,112,769.48.

WorksEU fundedElectronic submission

EUR 28.5M

Szacowana wartość

Lokalizacja

RO321, Romania

Czas trwania

78 MONTH

Kategoria

Construction work for highways, roads

Kryteria udzielenia

Price

Termin

Expired Jul 09, 2026

Szczegóły zamówienia

Data publikacji
18 Jun 2026
Języki
Romanian

Metadane referencyjne

Podstawa prawna
32014L0024

Identyfikatory referencyjne

ID przetargu
422736-2026

Dokumenty (2)

Podobne przetargi