Tenderwize
Wróć do wyszukiwania

Design and Execution of TransRegio Feleac TR35 – Lot 3

Municipiul Cluj-Napoca·Cluj-Napoca, Romania·RON 1082.8M | EUR 206.5M·Expired · Jul 20, 2026·Open·Works
High valueStructured notice only
Oryginalny tytuł ogłoszenia

Romania – Road construction works – "PROIECTARE SI EXECUȚIE LUCRĂRI: „Drum TransRegio Feleac TR 35 – Etapa I Centura Metropolitană TR 35 și Drumuri de Legătură – Faza I Centura Metropolitană TR 35 şi Drumuri de legătură, Lot 3: drumul TR35 între km 19+600 și km 24+365, incluzând Nodul 8-(Basarabiei), Nodul 9 (Frunzișului), cu tunelurile 1+2+3 și drumul de legătură DL B8 (Tr 35 Nod 9 – Strada Frunzișului din Municipiul Cluj-Napoca)

65/100

Ocena szansy

Needs reviewHigh complexity
WorksExpired
Skąd ta ocena?

Szansa

65 / 100

Złożoność

75 / 100

Czynniki ryzyka

Inconsistent submission time between structured data (12:00) and XML (15:00). This could lead to disqualification if no...

No procurement documents (technical specifications, contract terms) were analyzed. Critical details may be missing.

Głęboka analiza portfolio

Głęboka analiza dopasowania firmy

Wykorzystuje:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Przegląd

Moderate opportunity

Kluczowe fakty

  • RON 1082.8M estimated value
  • Works contract
  • 1 lot
  • Duration 48 MONTH
  • Design and construction of Lot 3 of the TransRegio Feleac TR35 ring road (km 19+600 to km 24+365).
  • Includes Nodes 8 and 9, three tunnels, and connecting road DL B8.
Pokaż pełne podsumowanie

This is an open EU-funded tender issued by Municipiul Cluj-Napoca (Romania) for the design and execution of Lot 3 of the TransRegio Feleac TR35 metropolitan ring road, including 3 tunnels and connecting roads. The estimated value is 1,082,772,582.06 RON (approx. 206.8M EUR). The contract duration is 48 months (17 months design + 31 months execution). Submission deadline is 2026-07-20 (note time inconsistency: structured data says 12:00, XML says 15:00). Award criteria: 40% price, 60% quality (split across 7 sub-criteria). Only the tender notice (TED XML) was analyzed; no procurement documents were extracted.

Ryzyka

Inconsistent submission time between structured data (12:00) and XML (15:00). This could lead to disqualification if no...

No procurement documents (technical specifications, contract terms) were analyzed. Critical details may be missing.

Analiza może być niepełna

Przeanalizowano tylko część dokumentacji. Pozostałe dokumenty mogą zawierać dodatkowe wymagania, certyfikaty lub dokumenty do złożenia.

Kluczowe wymagania

Technical

  • Tenderers must be established in EU/EEA, GPA signatories, or countries with relevant international agreements.
  • Registration with Romanian Trade Registry (ONRC) or equivalent for the top-ranked bidder only.
  • Subcontractors must also provide proof of registration for their share of works.

Wymagania mogą być niepełne.

Kryteria udzielenia

Lot 1

Price: 40% weight. Lowest price gets maximum points, others proportional.40%Quality: 10% weight. Points for number of contracts as Manager/Director on similar road projects.10%Quality: 5% weight. Points for participation in feasibility studies or technical designs for roads.5%Quality: 5% weight. Points for experience in road design contracts.5%Quality: 4% weight. Points for experience in designing bridges/passages/viaducts ≥150m.4%Quality: 30% weight. Points for offering rainwater capture/reuse systems and solar-powered lighting with storage. Higher points for larger solar panels and battery capacity.30%Quality: 3% weight. Points for experience in designing tunnels ≥100m.3%Quality: 3% weight. Points for experience in coordinating construction of tunnels ≥100m.3%

Zamawiający

Lokalizacja

Cluj-Napoca, ROU

Profil zamawiającego

Otwórz profil

Identyfikator

4305857

Działalność

General public services

Części (1)

LOT-0000

Design and Execution of TransRegio Feleac TR35 – Lot 3

Design and construction of the TR35 road between km 19+600 and km 24+365, including Node 8 (Basarabiei), Node 9 (Frunzișului), tunnels 1, 2, and 3, and connecting road DL B8. Works include road construction, bridges, tunnels, and engineering-design services. Duration: 48 months (17 months design, 31 months construction).

WorksEU fundedElectronic submission

EUR 206.5M

Szacowana wartość

Lokalizacja

RO113, Romania

Czas trwania

48 MONTH

Kategoria

Road construction works

Kryteria udzielenia

Best price-quality ratio

Termin

Expired Jul 20, 2026

Szczegóły zamówienia

Data publikacji
08 Jun 2026
Języki
Romanian

Metadane referencyjne

Podstawa prawna
32014L0024

Identyfikatory referencyjne

ID przetargu
394152-2026

Dokumenty (2)

Podobne przetargi