Tenderwize
Wróć do wyszukiwania

General Planning Services for Trolleybus Infrastructure

Innsbrucker Verkehrsbetriebe und Stubaitalbahn GmbH·Innsbruck, Austria·Expired · Jun 24, 2026·Neg W Call·Services
Structured notice only
Oryginalny tytuł ogłoszenia

Austria – Architectural, engineering and planning services – Generalplanerleistungen für die Schaffung der notwendigen O-Bus-Infrastruktur für den ÖPNV in Innsbruck

50/100

Ocena szansy

Needs reviewMedium complexity
ServicesExpired
Skąd ta ocena?

Szansa

50 / 100

Złożoność

60 / 100

Czynniki ryzyka

No estimated value, eligibility criteria, or detailed award criteria are provided in the notice. This makes it difficul...

Two-stage negotiated procedure with candidate reduction may involve significant effort for shortlisted bidders.

Głęboka analiza portfolio

Głęboka analiza dopasowania firmy

Wykorzystuje:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Przegląd

Moderate opportunity

Kluczowe fakty

  • Services contract
  • 1 lot
  • General planning services for trolleybus infrastructure in Innsbruck
  • Phases: Grundlagenermittlung (basic analysis), Vorentwurfsplanung (preliminary design), Entwurfsplanung (design), Einreich-/Genehmigungsplanung (submission/permit planning), Ausführungsplanung (execution planning) including bill of quantities, and Begleitung der Ausführung (construction accompaniment).
Pokaż pełne podsumowanie

This tender concerns a work contract for general planning services for the trolleybus infrastructure in Innsbruck, Austria. The procedure is a two-stage negotiated procedure with prior call for competition. The contract covers phases from basic analysis to execution planning and construction accompaniment. The estimated value is not disclosed, and detailed eligibility and award criteria are to be provided in the second stage. The tender is suitable for SMEs and is EU-funded.

Ryzyka

No estimated value, eligibility criteria, or detailed award criteria are provided in the notice. This makes it difficul...

Two-stage negotiated procedure with candidate reduction may involve significant effort for shortlisted bidders.

Analiza może być niepełna

Przeanalizowano tylko część dokumentacji. Pozostałe dokumenty mogą zawierać dodatkowe wymagania, certyfikaty lub dokumenty do złożenia.

Kluczowe wymagania

Technical

  • Two-stage negotiated procedure with prior call for competition.
  • Participation is initially open; candidates will be reduced to a minimum of 3 for the second stage.
  • Contract is a work contract (Werkvertrag).

Wymagania mogą być niepełne.

Kryteria udzielenia

Lot 1

Price: 70% (further details in second stage)70%Concept: 20% (further details in second stage)20%Presentation of concept: 10% (further details in second stage)10%

Zamawiający

Lokalizacja

Innsbruck, AUT

Profil zamawiającego

Otwórz profil

Identyfikator

FN 37318f

Działalność

Urban railway, tramway, trolleybus or bus services

Części (1)

LOT-0001

General Planning Services for Trolleybus Infrastructure

Work contract for general planning services for the construction of necessary trolleybus infrastructure in Innsbruck, covering phases: basic analysis, preliminary design, design, submission/permit planning, execution planning including bill of quantities, and construction accompaniment.

ServicesEU fundedElectronic submissionSME suitable

Lokalizacja

Austria

Kategoria

Architectural

Kryteria udzielenia

Price

Termin

Expired Jun 24, 2026

Szczegóły zamówienia

Data publikacji
04 Jun 2026
Języki
German

Metadane referencyjne

Podstawa prawna
32014L0025

Identyfikatory referencyjne

ID przetargu
387215-2026

Dokumenty (1)

Podobne przetargi