BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station
Oryginalny tytuł ogłoszenia
Norway – Pipeline, piping, pipes, casing, tubing and related items – BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station
Ocena szansy
Skąd ta ocena?
Szansa
60 / 100
Złożoność
70 / 100
Czynniki ryzyka
Missing procurement documents: only the TED notice was analyzed. Crucial details on terms, conditions, specifications...
Specific technical requirements (waterproof concrete, deep sheet pitting, pressurized pipes Ø500mm+, steel pipes PN16)...
No procurement documents available
Głęboka analiza portfolio
Wykorzystuje:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Przegląd
Moderate opportunityKluczowe fakty
- NOK 95M estimated value
- Supplies contract
- 1 lot
- Duration 46 MONTH
- Establishment of raw water pump station
- Execution of pipelines from ENT2 to ENT3 (land pipeline contract)
Pokaż pełne podsumowanie
This tender, issued by Gjøvik Municipality (Norway), is for the establishment of a raw water pump station as part of a backup water supply system for Gjøvik and Biri. The project is the second stage of a larger initiative and includes pipeline work, pump installation, and associated construction. The contract is valued at 95,000,000 NOK with a duration of 46 months. The procedure is a negotiated procedure with a call for competition (neg-w-call). The deadline for submission is 31 July 2026. The award is based on price (55%), climate/environment (30%), and implementation plan (15%). Only one lot is identified.
Ryzyka
Missing procurement documents: only the TED notice was analyzed. Crucial details on terms, conditions, specifications...
Specific technical requirements (waterproof concrete, deep sheet pitting, pressurized pipes Ø500mm+, steel pipes PN16)...
No procurement documents available
Analiza może być niepełna
Przeanalizowano tylko część dokumentacji. Pozostałe dokumenty mogą zawierać dodatkowe wymagania, certyfikaty lub dokumenty do złożenia.
Kluczowe wymagania
Technical
- Sufficient financial capacity (annual accounts 2024/2025, credit rating ≤6 months old)
- Relevant experience in waterproof concrete, deep sheet pitting, pressurized pipes, pumps, and steel pipes (max 4 reference projects in last 10 years)
Certifications
- Legally established company (registration certificate or equivalent)
Wymagania mogą być niepełne.
Kryteria udzielenia
Lot 1
Zamawiający
Nazwa
Lokalizacja
Gjøvik, NOR
Strona
Profil zamawiającego
Identyfikator
940155223
Działalność
General public services
Części (1)
LOT-0001
BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station
Establishment of a raw water pump station including execution of pipelines from ENT2 to the land pipeline contract (ENT3). Scope includes waterproof concrete, deep sheet pitting, pressurized stainless steel pipes, pump delivery/installation, and steel pipes. Part of a backup water system for Gjøvik and Biri.
EUR 8.8M
Szacowana wartość
Lokalizacja
Czas trwania
Kategoria
Kryteria udzielenia
Termin
Szczegóły kryteriów
Price
Climate and environment
Implementation plan
Dodatkowe kody CPV
Pokaż oryginalne dane TED
Oryginalny opis TED
Gjøvik municipality is responsible for ensuring a safe and stable delivery of drinking water to the inhabitants of the municipality. In order to strengthen security of supply, it has been decided to establish a full-fledged back-up water system that can supply both Biri and Gjøvik. Stage 1 of the project included the establishment of an submarine pipeline from Gjøvik to Redalen, the construction of a pressure increase station, as well as the establishment of a connection point for the continuation of the pipeline towards Biri. The sea pipeline was lowered in Mjøsa in autumn 2020, and after completion of the pump station the facility was put into operation in 2021. In stage 2 the pipeline shall be continued from Redalen to Biri, where both a raw water pump station and a new water treatment plant shall be established. In this contract, the establishment of a raw water pump station with the execution of pipelines from ENT2 up until the land pipeline contract ("ENT3") shall be executed.
Szczegóły zamówienia
- Data publikacji
- 02 Jun 2026
- Języki
- English, Norwegian
Metadane referencyjne
- Podstawa prawna
- 32014L0025
Identyfikatory referencyjne
- ID przetargu
- 382098-2026
Dokumenty (1)
Podobne przetargi
Switzerland – Construction work for water and sewage pipelines – CERM - Centre d'entretien routier des montagnes - La Chaux-de-Fonds - LOT GC01_Réseaux - CFC 13, 452, 453.2,454, 455.2, 456, 463, 465
Poland – Road construction works – Rozbudowa drogi krajowej nr 22 na odcinku Malbork -Królewo
Denmark – Construction work – Opførelse af bygværker til Kalundborg Central Renseanlæg F1.BA.01
Norway – Construction work – Tradesman services - Plumbing for Midt-Telemark and Nome municipalities.
France – Drinking-water treatment plant construction work – Marché de travaux dans le cadre de construction de l’UTEP de la Technopole et la reconfiguration des adductions des ressources de l’Est sur le territoire de la Commune de Saint Denis
France – Construction work for water and sewage pipelines – Réhabilitation de réseaux d’alimentation en eau potable, eau industrielle et assainissement
Ocena szansy
Skąd ta ocena?
Szansa
60 / 100
Złożoność
70 / 100
Czynniki ryzyka
Missing procurement documents: only the TED notice was analyzed. Crucial details on terms, conditions, specifications...
Specific technical requirements (waterproof concrete, deep sheet pitting, pressurized pipes Ø500mm+, steel pipes PN16)...
No procurement documents available
Głęboka analiza portfolio
Wykorzystuje:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications