Tenderwize
Wróć do wyszukiwania

Contract Administration and Construction Supervision of the Pipe Conveyor from Telal AlThahab to the downstream location on King Abdallah Canal, at Turnout 95

Ministry of Water and Irrigation Jordan Valley Authority - Main contact·Amman, JOR·EUR 4.7M·Expired · Jul 08, 2026·Open·Services
High valueStructured notice only
Oryginalny tytuł ogłoszenia

Jordan – Contract administration services – Contract Administration and Construction Supervision of the Pipe Conveyor from Telal AlThahab to the downstream location on King Abdallah Canal, at Turnout 95

60/100

Ocena szansy

Needs reviewHigh complexity
ServicesExpired
Skąd ta ocena?

Szansa

60 / 100

Złożoność

80 / 100

Czynniki ryzyka

Stringent financial and experience requirements may exclude many bidders. Minimum turnover of EUR 1.5M and specific pip...

JVCA members must meet specific minimum percentages (40% for each member, 60% for leading) for turnover, and leading me...

Głęboka analiza portfolio

Głęboka analiza dopasowania firmy

Wykorzystuje:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Przegląd

Moderate opportunity

Kluczowe fakty

  • EUR 4.7M estimated value
  • Services contract
  • 1 lot
  • Duration 54 MONTH
  • Assistance to the Client in contract administration and construction supervision
  • Supervision of construction of the main conveyor from Telal Al Thahab to downstream on King Abdullah Canal at Turnout 95
Pokaż pełne podsumowanie

This tender is for contract administration and construction supervision of a pipe conveyor project in Jordan, funded by the European Investment Bank. The single lot requires extensive experience in pipeline and riverine structure supervision, with strict financial and experience criteria. Submission is not electronic; tenders must be submitted physically. The deadline is 2026-07-08 (extended from 2026-06-10).

Ryzyka

Stringent financial and experience requirements may exclude many bidders. Minimum turnover of EUR 1.5M and specific pip...

JVCA members must meet specific minimum percentages (40% for each member, 60% for leading) for turnover, and leading me...

Analiza może być niepełna

Przeanalizowano tylko część dokumentacji. Pozostałe dokumenty mogą zawierać dodatkowe wymagania, certyfikaty lub dokumenty do złożenia.

Kluczowe wymagania

Technical

  • Deadline: 2026-07-08 at 12:00 (CEST) / 10:00 UTC

Administrative

  • Submission must be in English
  • Electronic submission is not allowed; tenders must be submitted physically

Wymagania mogą być niepełne.

Zamawiający

Lokalizacja

Amman, JOR

Identyfikator

Ministry of Jordan

Działalność

General public services

Części (1)

LOT-0001

Contract Administration and Construction Supervision of the Pipe Conveyor from Telal AlThahab to the downstream location on King Abdallah Canal, at Turnout 95

Consultancy services for contract administration and construction supervision of a pipe conveyor from Telal AlThahab to King Abdullah Canal. Location: Jordan Valley. Duration: 54 months.

ServicesEU fundedElectronic submission

EUR 4.7M

Szacowana wartość

Lokalizacja

Jordan Valley, JOR

Czas trwania

54 MONTH

Kategoria

Contract administration services

Termin

Expired Jul 08, 2026

Szczegóły zamówienia

Data publikacji
25 May 2026
Języki
English

Metadane referencyjne

Podstawa prawna
other

Identyfikatory referencyjne

ID przetargu
357549-2026

Dokumenty (1)

Podobne przetargi

Spain – Construction supervision services – Servei d’assistència tècnica per a la direcció, coordinació i gestió del contracte de les obres de reposició de conduccions per al manteniment de la xarxa de distribució d’aigua de Terrassa

Sep 2

Poland – Supervision of building work – Świadczenie usługi budowlanego nadzoru inwestorskiego, nadzoru przyrodniczego i zarządzania realizacją inwestycji pn.: „Budowa gazociągu DN 500 MOP 8,4 MPa relacji Wola Karczewska-Karczew i budowa gazociągu DN 400 8,4 MPa relacji Karczew – Gassy Zadanie 1 – odcinek gazociągu DN 500 MOP 8,4 MPa Wola Karczewska-Karczew Zadanie 2 - odcinek gazociągu DN 400 8,4 MPa Karczew-Gassy"

Nov 20

Romania – Construction supervision services – Servicii de Supervizare „Largire la 4 benzi a centurii rutiere a Municipiului Bucuresti Sud intre A1 (km 55+520) si DN 5 (km 40+000) – LOT II Largire la 4 benzi a centurii rutiere a Municipiului Bucuresti Sud intre km 54+700 si DN 5 (km 40+000)”

Aug 24

Spain – Construction supervision services – Servicio de control y vigilancia de las obras correspondientes al Proyecto 04/26 de almenara del Nuevo Canal de Cartagena en el recinto de Lo Romero I. (MU/Varios)

Sep 7

Denmark – Architectural, construction, engineering and inspection services – Totalrådgiverydelser til Aalborg Universitet

Sep 1

France – Engineering services – Maîtrise d'œuvre pour travaux d’extensions, renforcements, renouvellements des réseaux AEP, pour travaux d’extensions, sécurisation, réhabilitations des réseaux EU et pour postes de refoulement.

Sep 15