Prüfsystem für Gas-isolierte Schaltanlagen im Hoch- und Höchstspannungsnetz der Austrian Power Grid AG
Original notice title
Austria – Electricity distribution and control apparatus – Prüfsystem für Gas-isolierte Schaltanlagen im Hoch- und Höchstspannungsnetz der Austrian Power Grid AG
Opportunity Score
Why this score?
Opportunity
50 / 100
Complexity
40 / 100
Risk factors
Critical information such as selection criteria, required documents, and submission deadline is missing from the availa...
As a pre-qualification system, competition may be high, and qualification does not guarantee contracts.
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Overview
Moderate opportunityKey Facts
- Supplies contract
- 1 lot
- Duration 9 YEAR
- Establishment of a pre-qualification system (Prüfsystem) for gas-insulated switchgear (GIS) for high and extra-high voltage networks.
- The system is expected to run for 9 years, from April 2026 to December 2035.
Show full summary
This tender establishes a pre-qualification system (Prüfsystem) for gas-insulated switchgear (GIS) for the high and extra-high voltage grid of Austrian Power Grid AG. It is a supplies contract with a single lot, covering a 9-year duration from April 2026 to December 2035. The tender is published under the utilities directive (2014/25/EU) and requires electronic submission via the APG procurement portal (vemap). No estimated value, award criteria, or detailed eligibility requirements are provided in the available data.
Risks
Critical information such as selection criteria, required documents, and submission deadline is missing from the availa...
As a pre-qualification system, competition may be high, and qualification does not guarantee contracts.
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
Technical
- Participation is open to suppliers of gas-insulated switchgear for high and extra-high voltage.
Administrative
- Electronic submission via the APG procurement portal (Open portal) is required.
- Submissions must be in German (DEU).
Requirements may be incomplete.
Buyer
Name
Austrian Power Grid AG
Location
Wien, AUT
Website
Buyer profile
Identifier
FN177696v
Activity
Electricity-related activities
Lots (1)
LOT-0001
Prüfsystem für Gas-isolierte Schaltanlagen im Hoch- und Höchstspannungsnetz der Austrian Power Grid AG
Establishment of a pre-qualification system for gas-insulated switchgear for the high and extra-high voltage network.
Location
Duration
Category
Award details
Value note
Show original TED data
Original TED description
Einrichtung eines Prüfsystems (Präqualifikationsverfahren) für Gas-isolierte Schaltanlagen im Hoch- und Höchstspannungsnetz der Austrian Power Grid AG
Procurement Details
- Publication date
- 07 kwi 2026
- Notice type
- Qu Sy
- Languages
- German
Reference metadata
- Notice subtype
- 15
- Notice version
- 1
- Legal basis
- 32014L0025
Reference IDs
- Tender ID
- 238517-2026
Documents (1)
Similar tenders
Poland – Printing and delivery services – Usługi druku techniką offsetową, oprawy i dostawy Publikacji książkowych i nutowych (Nowości) na potrzeby PWM
Italy – Low-voltage installation work – Gara telematica a procedura aperta in quattro lotti per l'affidamento di interventi manutentivi su edifici dell'Università degli Studi di Padova, tramite conclusione di Accordi Quadro. Lotto 1: Accordo Quadro quadriennale per l'affidamento di interventi di adeguamento degli impianti termici e di condizionamento SOA OS28E3 (AQOS28E3) Lotto 2: Accordo quadro triennale per l'affidamento di interve
France – Laundry-collection services – Location et entretien de vêtements de travail et de linge pour les services de la Ville de Sannois
Czechia – Cleaning services – Úklidové služby pro Fakultu humanitních studií Univerzity Karlovy
Poland – Motor vehicles – Dostawa samochodów terenowych typu Pick-up wraz z zabudową dla potrzeb Pogotowia Energetycznego Oddziałów PGE Dystrybucja S.A. w roku 2027 z podziałem na 7 części / zadań.
Côte d’Ivoire – Supporting services for the government – Assistance technique au programme « CAJOU+ – Compétitivité et durabilité de la filière anacarde en Côte d’Ivoire »
Opportunity Score
Why this score?
Opportunity
50 / 100
Complexity
40 / 100
Risk factors
Critical information such as selection criteria, required documents, and submission deadline is missing from the availa...
As a pre-qualification system, competition may be high, and qualification does not guarantee contracts.
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications