Allemagne – Conception, fourniture et installation du système de ligne de transfert LN2 pour Super-FRS
Titre original de l'avis
Germany – Particle accelerators – Design, Manufacture, Supply and Installation of the Liquid Nitrogen (LN2) Transfer Line System for the Super-FRS Experiment Area
Score d'opportunité
Pourquoi ce score ?
Opportunité
0 / 100
Complexité
0 / 100
Analyse approfondie du portefeuille
Utilise:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Informations clés
- Pouvoir adjudicateur
- FAIR - Facility for Antiproton and Ion Research in Europe GmbH
- Pays
- Allemagne
- CPV
- 31643000 - Particle accelerators
- Date limite
- Oct 21, 2026
Analyse IA de l'appel d'offres
Tenderwize prépare une analyse IA de cet appel d'offres à partir de l'avis TED et des documents de consultation : périmètre, exigences clés, critères de sélection, risques et questions à poser à l'acheteur. L'analyse est générée à l'ouverture de l'appel d'offres.
Critères d'attribution
Lot 1
Acheteur
Localisation
Darmstadt, DEU
Site web
Identifiant
DE 275 595 927
Activité
Education
Lots (1)
LOT-0001
Design, Manufacture, Supply and Installation of the Liquid Nitrogen (LN2) Transfer Line System for the Super-FRS Experiment Area
The tender covers the design, manufacture, supply, installation and testing of a vacuum-insulated liquid nitrogen transfer system for the Super-FRS experiment area at FAIR/GSI in Darmstadt, Germany.
Localisation
Durée
Catégorie
Critères d'attribution
Détails des critères
Price criteria for "Preis-Quotient-Methode"
The tenderer must submit a robust and traceable schedule concept. If the tenderer is not already working on the FAIR construction site, it is recommended to allow approximately two months for initial company registration on site. The tenderer must describe its experience on comparable major construction sites and explain how this experience is reflected in the schedule. Planned delivery dates for all materials and the personnel resources to be deployed, including staffing levels, qualifications and duration of deployment, must be specified in detail. If the proposed schedule deviates from the framework requirements in the tender specification or cannot meet them, a clear written justification must be provided. Overall, the concept must demonstrate realistic, traceable and risk aware planning.
Pressure drop, heat input and pipe sizing. The concept should explain how these aspects interact and how the selected dimensions meet the specified operating requirements. Assumptions and calculation results should be traceable. A coherent design supported by calculations for the relevant operating conditions is assessed particularly positively. Pipe dimensions should be justified through a balanced assessment of pressure drop and heat input. Clearly stated boundary conditions, realistic allowances and consistency between calculations and the proposed design make the concept convincing. Low pressure drop and low heat input are favourable where they are demonstrated under comparable conditions and remain compatible with the specified requirements.
Routing, supports, fixed points and expansion joints. The concept should show how the line can be installed and how these elements work together, taking account of installation space, accessibility and thermally induced movements. Clear routing and support drawings, well justified fixed point locations and a coherent expansion compensation arrangement are assessed particularly positively. A feasible installation sequence, accessible connections and inspection points, and clear coordination of interfaces strengthen the concept. The proposed arrangement should explain how loads and thermal movements are accommodated without conflicts between the routing, supports and expansion joints.
Détails de la procédure
- Date de publication
- 17 Nov 2026
- Langues
- English
Métadonnées de référence
- Base juridique
- 32014L0024
Identifiants de référence
- ID de l'appel d'offres
- 802713-2026
Documents (2)
Score d'opportunité
Pourquoi ce score ?
Opportunité
0 / 100
Complexité
0 / 100
Analyse approfondie du portefeuille
Utilise:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications