Modules d’onduleurs supraconducteurs pour l’afterburner SASE2
Titre original de l'avis
Germany – Laboratory, optical and precision equipments (excl. glasses) – European XFEL: Superconducting undulator modules for an afterburner for SASE2 - FESTA
Score d'opportunité
Pourquoi ce score ?
Opportunité
0 / 100
Complexité
0 / 100
Facteurs de risque
Submission deadline in 10 days
Analyse approfondie du portefeuille
Utilise:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Informations clés
- Pouvoir adjudicateur
- European X-Ray Free-Electron Laser Facility GmbH
- Pays
- Allemagne
- CPV
- 38000000 - Laboratory, optical and precision equipments (excl. glasses)
- Date limite
- Nov 30, 2026
Analyse IA de l'appel d'offres
Tenderwize prépare une analyse IA de cet appel d'offres à partir de l'avis TED et des documents de consultation : périmètre, exigences clés, critères de sélection, risques et questions à poser à l'acheteur. L'analyse est générée à l'ouverture de l'appel d'offres.
Acheteur
Localisation
Schenefeld, DEU
Site web
Identifiant
DE815117472
Activité
Education
Lots (1)
LOT-0001
European XFEL: Superconducting undulator modules for an afterburner for SASE2 - FESTA
Scope of Work After Award: The tender covers the following components and requirements: Superconducting Undulator Modules: Composition: Small series of five with an option of sixth SCU module, each approximately 5 meters long. Installation: The SCU modules will be positioned after the existing 35 permanent magnet undulator modules of the SASE2 line at European XFEL Technical design report: A Technical Design Report (TDR) for one representative SCU module must be provided after award to EuXFEL for review and approval Tests: An intermediate test of all the SCU magnets in a liquid-helium (LHe) vertical cryostat at DESY (SUNDAE1), carried out under the responsibility of EuXFEL, is foreseen to train and characterize the magnetic field. The acceptance tests of each SCU module include: factory acceptance test (FAT) and three site acceptance tests: the first SAT which includes magnetic characterization, SAT2 in the tunnel without beam and SAT3 in tunnel with beam. Timeline: The fifth SCU module must be delivered latest by June 2032, and the sixth optional SCU module, if the option is exercised, latest by June 2033. Technical Specifications include: Magnetic Configuration: Each SCU module consists of two 2 m long SCU magnets, each with: Vacuum stay-clear: 5 mm Period: 18 mm Peak magnetic field: ≥ 1.82 T The root mean square of the relative variation of the undulator parameter defined over half period must be smaller than 0.004 The range of the relative variation of the undulator parameter defined over half period must be smaller than 0.012 Shimming coils must be applied in case the undulator parameters mentioned above are not reached in the measurement in SUNDAE1: root mean square of the relative variation of the undulator parameter defined over half period larger than 0.004 and /or the range of the relative variation of the undulator parameter defined over half period larger than 0.012. Components: - A cryostat for thermal isolation consisting of a vessel and several thermal shields. - An electron beam vacuum chamber (EBC) with the following functions: separating the isolation vacuum, where the superconducting magnets are located, from the ultra high vacuum where the electron beam moves, shielding the superconducting magnets from beam heat load. - Two SCU magnets, each consisting of a top and bottom coil held together by a support structure, equipped with correction coils. - Horizontal and vertical Helmholtz coils at the exit of the upstream SCU magnet and at the entrance of the downstream SCU magnet. - A phase shifter to manage phase mismatch between the two SCU magnets. A support structure holding together the Helmholtz coils and the phase shifter. This support structure and the ones of the SCU magnets must keep the superconducting magnets at the final gap and have to be designed and manufactured to fit in the magnetic gap precisely machined rails to guide a sledge with Hall probes. The sledge with Hall probes will be provided by EuXFEL. This is needed to perform the test in SUNDAE1 mentioned above. The contract will provide for a firm obligation to supply five (5) SCU modules. In addition, the contract will include an option entitling EuXFEL, at its sole discretion, to order one (1) additional (sixth) SCU module with the same technical specifications and on the same contractual terms. The option shall lapse if EuXFEL does not exercise it by the end of July 2029. EuXFEL is under no obligation to exercise the option. Further details will be set out in the procurement documents, including the complete technical specification, which will be provided to the selected candidates following completion of the selection stage and submission of the confidentiality agreement.
Localisation
Catégorie
Détails des critères
Scope of Work After Award: The tender covers the following components and requirements: Superconducting Undulator Modules: Composition: Small series of five with an option of sixth SCU module, each approximately 5 meters long. Installation: The SCU modules will be positioned after the existing 35 permanent magnet undulator modules of the SASE2 line at European XFEL Technical design report: A Technical Design Report (TDR) for one representative SCU module must be provided after award to EuXFEL for review and approval Tests: An intermediate test of all the SCU magnets in a liquid-helium (LHe) vertical cryostat at DESY (SUNDAE1), carried out under the responsibility of EuXFEL, is foreseen to train and characterize the magnetic field. The acceptance tests of each SCU module include: factory acceptance test (FAT) and three site acceptance tests: the first SAT which includes magnetic characterization, SAT2 in the tunnel without beam and SAT3 in tunnel with beam. Timeline: The fifth SCU module must be delivered latest by June 2032, and the sixth optional SCU module, if the option is exercised, latest by June 2033. Technical Specifications include: Magnetic Configuration: Each SCU module consists of two 2 m long SCU magnets, each with: Vacuum stay-clear: 5 mm Period: 18 mm Peak magnetic field: ≥ 1.82 T The root mean square of the relative variation of the undulator parameter defined over half period must be smaller than 0.004 The range of the relative variation of the undulator parameter defined over half period must be smaller than 0.012 Shimming coils must be applied in case the undulator parameters mentioned above are not reached in the measurement in SUNDAE1: root mean square of the relative variation of the undulator parameter defined over half period larger than 0.004 and /or the range of the relative variation of the undulator parameter defined over half period larger than 0.012. Components: - A cryostat for thermal isolation consisting of a vessel and several thermal shields. - An electron beam vacuum chamber (EBC) with the following functions: separating the isolation vacuum, where the superconducting magnets are located, from the ultra high vacuum where the electron beam moves, shielding the superconducting magnets from beam heat load. - Two SCU magnets, each consisting of a top and bottom coil held together by a support structure, equipped with correction coils. - Horizontal and vertical Helmholtz coils at the exit of the upstream SCU magnet and at the entrance of the downstream SCU magnet. - A phase shifter to manage phase mismatch between the two SCU magnets. A support structure holding together the Helmholtz coils and the phase shifter. This support structure and the ones of the SCU magnets must keep the superconducting magnets at the final gap and have to be designed and manufactured to fit in the magnetic gap precisely machined rails to guide a sledge with Hall probes. The sledge with Hall probes will be provided by EuXFEL. This is needed to perform the test in SUNDAE1 mentioned above. The contract will provide for a firm obligation to supply five (5) SCU modules. In addition, the contract will include an option entitling EuXFEL, at its sole discretion, to order one (1) additional (sixth) SCU module with the same technical specifications and on the same contractual terms. The option shall lapse if EuXFEL does not exercise it by the end of July 2029. EuXFEL is under no obligation to exercise the option. Further details will be set out in the procurement documents, including the complete technical specification, which will be provided to the selected candidates following completion of the selection stage and submission of the confidentiality agreement.
Détails de la procédure
- Date de publication
- 08 Nov 2026
- Langues
- German, English
Métadonnées de référence
- Base juridique
- 32014L0024
Identifiants de référence
- ID de l'appel d'offres
- 778066-2026
Documents (1)
Appels d'offres similaires
Poland – Construction work – Przebudowa stacji 110/15 kV Maszewo
Spain – Laboratory, optical and precision equipments (excl. glasses) – SUMINISTRO, INSTALACIÓN Y PUESTA EN MARCHA DE UN SISTEMA DE DEPOSICIÓN TÉRMICA EN ALTO/ULTRAALTO VACÍO DE MATERIALES ORGÁNICOS Y METALES, CON LOAD-LOCK EN CAJA DE GUANTES
Poland – Laboratory reagents – DZP.271.40.2026 "Sukcesywna dostawa odczynników"
Norway – Medical equipments, pharmaceuticals and personal care products – Micro sample tubes – Sample taking equipment for capillary sampling for the health authorities in Helse Vest.
Poland – Medical equipments – Dostawa systemu do mikromacierzy, zestawu do elektroforezy kapilarnej z detekcją fluorescencyjną do diagnostyki DNA oraz hybrydyzatora w ramach projektu pn. „Budowa ośrodka diagnostyczno-profilaktycznego i modernizacja infrastruktury Centrum Onkologii Ziemi Lubelskiej imienia św. Jana z Dukli w Lublinie w celu poprawy dostępu i podniesienia jakości diagnostyki i leczenia onkologicznego ...
Poland – Laboratory, optical and precision equipments (excl. glasses) – Zakup i dostawa inkubatora, komory laminarnej oraz zamrażarki dla Wydziału Biologii UW
Score d'opportunité
Pourquoi ce score ?
Opportunité
0 / 100
Complexité
0 / 100
Facteurs de risque
Submission deadline in 10 days
Analyse approfondie du portefeuille
Utilise:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications