Tenderwize
Retour à la recherche

Étude benthique dans les eaux territoriales et ZEE

AquaDuctus Pipeline GmbH·Kassel, Germany·Deadline Nov 26, 2026 · 6 days left·Neg W Call·Services
Titre original de l'avis

Germany – Environmental management – TP4 - Benthic (Benthos) Survey (TW and EEZ)

0/100

Score d'opportunité

High riskLow complexity
ServicesOpen
Pourquoi ce score ?

Opportunité

0 / 100

Complexité

0 / 100

Facteurs de risque

Submission deadline in 6 days

Analyse approfondie du portefeuille

Analyse approfondie de l'adéquation entreprise

Utilise:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Informations clés

Pouvoir adjudicateur
AquaDuctus Pipeline GmbH
Pays
Allemagne
CPV
90710000 - Environmental management
Date limite
Nov 26, 2026

Analyse IA de l'appel d'offres

Tenderwize prépare une analyse IA de cet appel d'offres à partir de l'avis TED et des documents de consultation : périmètre, exigences clés, critères de sélection, risques et questions à poser à l'acheteur. L'analyse est générée à l'ouverture de l'appel d'offres.

Acheteur

Localisation

Kassel, DEU

Identifiant

DE 354 183 413

Activité

Production, transport or distribution of gas or heat

Lots (1)

LOT-0001

TP4 - Benthic (Benthos) Survey (TW and EEZ)

The aim is to record and describe the in- and epifauna as well as the sediments as a basis for verifying biotope and habitat types within the framework of the environmental assessment. In the territorial waters up to the 12-nautical-mile zone, infauna surveys are to be carried out along the trench to be dredged using the Van Veen grab. In addition, samples for sediment chemical analyses are to be taken using the Van Veen grab in accordance with GÜBAK guidelines. The services include in particular: - Provision of a vessel, the necessary equipment, including crew, and all associated costs, - Timely provision of the necessary vessel certificates, procedures, implementation plans, an Emergency Response Plan (including reporting chain) and a HSE Plan, data sheets for the equipment used, a description of the equipment, and a risk assessment, - Obtaining all necessary permits and work authorisations required for the execution of the grab sampling (submission required at least 8 weeks in advance), - Implementation and compliance with the conditions set out in the permits and the GASCADE work permits, - Conducting a kick-off meeting with the Company prior to the commencement of offshore works, - Marine coordination (including registration with neighbouring wind farms, converter platforms, etc.), - Offshore deployment to carry out the investigations (Van Veen grab samples, epifauna sampling using a beam trawl/"Kieler Kinderwagen" dredge, underwater video transects), - The GÜBAK samples must be stored in a cool place and handed over to the Company or the geotechnical team, - Laboratory analysis (sediments, infauna, epifauna), - Evaluation of the underwater videos, - Data analysis in accordance with the methodological guidelines of StUK 4, - Preparation of a report, including the production of maps and plans, - Data delivery in accordance with the BSH"s specifications. For details see B.1 Scope of Work Benthos Survey - Permit 2 4 5 (EEZ TW) that will be shared after A.4 Non Disclosure Agreement is signed.

ServicesEU fundedElectronic submissionSME suitable

Localisation

Germany

Catégorie

Environmental management

Détails de la procédure

Date de publication
08 Nov 2026
Langues
English

Métadonnées de référence

Base juridique
32014L0025

Identifiants de référence

ID de l'appel d'offres
776998-2026

Documents (2)

Appels d'offres similaires

Cookies & Privacy

With your consent, we use Google Analytics, Microsoft Clarity (session recordings) and Google Ads cookies to understand how Tenderwize is used and to measure our advertising. You can change your choice at any time via “Cookie Settings” in the footer. Cookie Policy · Privacy Policy