North Sea I, South, Offshore Wind Farm

Energistyrelsen·København V, Denmark·DKK 6600M | EUR 883M·Deadline Oct 02, 2028 · 773 days left·Open·Works
High valueStructured notice only
Titre original de l'avis

Denmark – Construction work – North Sea I, South, Offshore Wind Farm

60/100

Score d'opportunité

Needs reviewHigh complexity
WorksOpen
Pourquoi ce score ?

Opportunité

60 / 100

Complexité

90 / 100

Facteurs de risque

Concessionaire bears costs for construction, operation, decommissioning, and overplanting, with no cap on payments to s...

Minimum capacity must be established by 31 Dec 2034; delays may lead to penalties. Extension possible but not guarantee...

Analyse approfondie du portefeuille

Analyse approfondie de l'adéquation entreprise

Utilise:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Aperçu

Moderate opportunity

Faits clés

  • DKK 6600M estimated value
  • Works contract
  • 1 lot
  • Duration 40 YEAR
  • Design, financing, construction, operation, and decommissioning of an offshore wind farm with minimum capacity of 1 GW
  • Connection to Danish transmission grid is voluntary
Afficher le résumé complet

This is an open procedure for a concession to establish and operate a 1 GW offshore wind farm (North Sea I, South) in the Danish North Sea. The project is supported by a capability-based two-way contract for difference (CfD) for 20 years, with a subsidy cap of 6.6 billion DKK (2025 prices). The concessionaire bears all commercial risks except for certain defence-related costs and preliminary investigations. The award criterion is the lowest bid price (DKK/MWh). The tender requires a minimum of one reference for a large-scale offshore energy project with CAPEX ≥ 500M DKK, ≥ 10m water depth, ≥ 25-year duration. The submission deadline is 23 October 2028 at 14:00 local Danish time. Only the first lot (LOT-0000) is detailed; additional lot entries lack titles, descriptions, and deadlines, indicating a data extraction issue.

Risques

Concessionaire bears costs for construction, operation, decommissioning, and overplanting, with no cap on payments to s...

Minimum capacity must be established by 31 Dec 2034; delays may lead to penalties. Extension possible but not guarantee...

L'analyse peut être incomplète

Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.

Exigences clés

Administrative

  • Bid price (DKK/MWh) must be offered in Tender Submission Letter; award to lowest bid price
  • Tender validity period: 8 months from submission deadline, extendable upon request
  • ESPD required as preliminary proof; full documentation upon request

Les exigences peuvent être incomplètes.

Critères d'attribution

Lot 1

Bid price100%

Acheteur

Localisation

København V, DNK

Site web

sdfi.dk/

Profil acheteur

Ouvrir le profil

Identifiant

59778714

Activité

General public services

Lots (1)

LOT-0000

North Sea I, South, Offshore Wind Farm

Establishment and operation of one offshore wind farm with minimum capacity of 1 GW, including optional overplanting and potential for innovative energy production (e.g., Power-to-X). The concession area is in the Danish North Sea (NUTS: DK041). The concession agreement has a duration of 40 years, with a 20-year CfD subsidy period.

WorksEU fundedElectronic submission

EUR 883M

Valeur estimée

Localisation

DK041, Denmark

Durée

40 YEAR

Catégorie

Construction work

Critères d'attribution

Price

Date limite

Deadline Oct 23, 2028

Détails de la procédure

Date de publication
20 Nov 2025
Langues
English

Métadonnées de référence

Base juridique
32014L0024

Identifiants de référence

ID de l'appel d'offres
774914-2025

Documents (1)

Appels d'offres similaires