Système de stockage d’énergie par batteries à Čierny Váh

Slovenské elektrárne, a.s.·Bratislava - mestská časť Ružinov, Slovakia·Deadline Nov 30, 2026 · 26 days left·Neg W Call·Supplies
Titre original de l'avis

Slovakia – Batteries – Implementation of Battery Energy Storage System at Čierny Váh

0/100

Score d'opportunité

High riskLow complexity
SuppliesOpen
Pourquoi ce score ?

Opportunité

0 / 100

Complexité

0 / 100

Analyse approfondie du portefeuille

Analyse approfondie de l'adéquation entreprise

Utilise:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Informations clés

Pouvoir adjudicateur
Slovenské elektrárne, a.s.
Pays
Slovaquie
CPV
31440000 - Batteries +9 autres
Date limite
Nov 30, 2026

Analyse IA de l'appel d'offres

Tenderwize prépare une analyse IA de cet appel d'offres à partir de l'avis TED et des documents de consultation : périmètre, exigences clés, critères de sélection, risques et questions à poser à l'acheteur. L'analyse est générée à l'ouverture de l'appel d'offres.

Critères d'attribution

Lot 1

The lowest total price without VAT — 100%

Acheteur

Localisation

Bratislava - mestská časť Ružinov, SVK

Site web

www.seas.sk

Profil acheteur

Ouvrir le profil

Identifiant

35829052

Activité

Electricity-related activities

Lots (1)

LOT-0001

Implementation of Battery Energy Storage System at Čierny Váh

The subject matter of the tender comprises EPC performance of all supplies and services related to design and engineering, permitting and other engineering activities, transportation, installation, commissioning and putting into operation of the newly installed equipment. The principal scope of supply is the construction and commissioning of a Battery Energy Storage System (BESS) providing the following functions and services: • Frequency Containment Reserve (FCR); • automatic Frequency Restoration Reserve (aFRR); • market services, including Day-Ahead and Intraday market participation, energy arbitrage and imbalance management; • Limited Frequency Sensitive Mode – Overfrequency (LFSM-O) and Underfrequency (LFSM-U), providing active power response in the event of an increase or decrease in grid frequency; and • island operation to ensure the auxiliary power supply of the pumped-storage hydropower plant in the event of a loss of the 22 kV power supply. The BESS shall have a total usable energy capacity of at least 480 MWh and a rated power of at least 120 MW and shall be connected to the 400 kV substation via a newly constructed 400 kV bay. The scope of works includes all engineering and permitting activities, preparation of design documentation, civil, electrical and mechanical works, delivery and installation of battery containers, power conversion systems, energy management systems, transformers, switchgear and associated equipment. The contractor shall also ensure integration with existing plant systems, implementation of control, protection, monitoring and communication systems, fire protection and security systems, testing, commissioning, performance verification and training of operating personnel. The tenderer shall provide all documentation, certifications, inspections and services necessary to ensure safe, reliable and long-term operation of the BESS installation.

SuppliesEU fundedElectronic submission

Localisation

SK031, Slovakia

Durée

1234 DAY

Catégorie

Batteries

Critères d'attribution

Price

Détails de la procédure

Date de publication
03 Nov 2026
Langues
Slovak, English

Métadonnées de référence

Base juridique
32014L0025

Identifiants de référence