AO pour la construction et l'O&M des BESS de Baixas

EDF power solutions·NANTERRE CEDEX, France·Deadline Dec 01, 2026 · 56 days left·Neg W Call·Works
Titre original de l'avis

France – Construction work – AO pour la construction et l'O&M des BESS de Baixas

60/100

Score d'opportunité

Needs reviewHigh complexity
WorksOpen
Pourquoi ce score ?

Opportunité

60 / 100

Complexité

75 / 100

Facteurs de risque

No submission deadline is given in the notice; this may indicate incomplete data or that the deadline is provided only...

The buyer can decide to source revamping and BESS separately, which could reduce the contract scope and value.

Analyse approfondie du portefeuille

Analyse approfondie de l'adéquation entreprise

Utilise:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Informations clés

Pouvoir adjudicateur
EDF power solutions
Pays
France
CPV
45000000 - Construction work +1 autres
Date limite
Dec 01, 2026

Aperçu

Moderate opportunity

Faits clés

  • Works contract
  • 1 lot
  • Duration until Nov 2026
  • Design and construction of a Battery Energy Storage System (BESS) with capacity 18 MW/40.7 MWh
  • Substation revamping (may be sourced separately)
Afficher le résumé complet

This tender from EDF Renouvelables SA is for the construction and 15-year O&M of a Battery Energy Storage System (BESS) in Baixas, France (18 MW/40.7 MWh). The procedure is a negotiated call with a single lot covering full EPC and O&M. The buyer reserves the right to source revamping and BESS separately. NZIA compliance is required. The contract includes a 5% retention guarantee and allows variants. Submission must be in French. No estimated value or submission deadline is provided in the available data.

Risques

No submission deadline is given in the notice; this may indicate incomplete data or that the deadline is provided only...

The buyer can decide to source revamping and BESS separately, which could reduce the contract scope and value.

L'analyse peut être incomplète

Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.

Exigences clés

Technical

  • EPC must use qualified suppliers as per Approved Vendor List (AVL)
  • Financial guarantee: 5% retention or first-demand guarantee for defects liability

Administrative

  • Tenderers must be able to submit an offer complying with NZIA regulations

Acheteur

Localisation

NANTERRE CEDEX, FRA

Profil acheteur

Ouvrir le profil

Identifiant

226 755 000

Activité

Electricity-related activities

Lots (1)

LOT-0001

AO pour la construction et l'O&M des BESS de Baixas

Full EPC for BESS and substation revamping, plus 15-year O&M (preventive and corrective) in Baixas, France. The buyer may split the revamping and BESS lots. NZIA compliance required. COD by 01/12/2027. Building permit expected by 18/08/2025.

WorksElectronic submission

Localisation

France

Durée

Oct 2025 - Nov 2026

Catégorie

Construction work

Détails de la procédure

Date de publication
26 Oct 2025
Langues
French

Métadonnées de référence

Base juridique
32014L0025

Identifiants de référence

ID de l'appel d'offres
706246-2025

Documents (1)