SPOLANA Long-Term Groundwater and Surface Water Monitoring
Titre original de l'avis
Czechia – Chemical works or oil refinery waste site investigation – SPOLANA – dlouhodobý monitoring podzemních a povrchových vod
Score d'opportunité
Pourquoi ce score ?
Opportunité
55 / 100
Complexité
62 / 100
Facteurs de risque
The estimated contract value is absent, so commercial viability, resource allocation, and price positioning cannot be a...
The detailed monitoring obligations depend on the April 2026 project documentation and a ČIŽP decision, neither of whic...
Analyse approfondie du portefeuille
Utilise:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Informations clés
- Pouvoir adjudicateur
- Česká republika - Ministerstvo financí
- Pays
- République tchèque
- CPV
- 90715120 - Chemical works or oil refinery waste site investigation +1 autres
- Date limite
- Oct 05, 2026
Aperçu
Moderate opportunityFaits clés
- Services contract
- 1 lot
- Duration 76 MONTH
- Long-term monitoring of groundwater and surface-water quality at the SPOLANA industrial site and its surroundings.
- Performance of monitoring activities in accordance with the April 2026 project documentation and the applicable ČIŽP decision.
Afficher le résumé complet
Open procedure for a 76-month environmental monitoring service concerning groundwater and surface water at and around the SPOLANA site in the Czech Republic. The scope is based on a project document and a ČIŽP decision, with ongoing and final evaluation including AAR preparation. Submission is electronic and the award criterion is lowest price. The contract value and bidder eligibility requirements are not stated in the provided data, and the procurement documents were not substantively analyzed.
Risques
The estimated contract value is absent, so commercial viability, resource allocation, and price positioning cannot be a...
The detailed monitoring obligations depend on the April 2026 project documentation and a ČIŽP decision, neither of whic...
L'analyse peut être incomplète
Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.
Exigences clés
Technical
- Service duration is 76 months.
- The procedure is open and concerns services.
Administrative
- Electronic submission is required through the stated NEN procurement portal.
Critères d'attribution
Lot 1
Acheteur
Localisation
Praha, CZE
Site web
Profil acheteur
Identifiant
00006947
Activité
Economic affairs
Lots (1)
LOT-0001
SPOLANA Long-Term Groundwater and Surface Water Monitoring
Monitoring of groundwater and surface-water quality at and around the SPOLANA site in accordance with the April 2026 project documentation and the ČIŽP decision, including continuous and final evaluation and preparation of AAR. The lot has a 76-month duration and is performed in the Czech Republic, region CZ020.
Localisation
Durée
Catégorie
Critères d'attribution
Date limite
Détails des critères
Nejnižší nabídková cena.
Codes CPV supplémentaires
Note sur la valeur
Afficher les données TED originales
Titre original du lot
SPOLANA – dlouhodobý monitoring podzemních a povrchových vod
Description TED originale
Předmětem této veřejné zakázky je provedení činností dle projektové dokumentace s názvem „SPOLANA, s.r.o. - Monitoring podzemních a povrchových vod – projektová dokumentace pro zadání VZ“, zpracované v dubnu 2026 společností VODNÍ ZDROJE, a.s., která je přílohou č. 3 ZD. Předmětem plnění je provedení monitorovacích prací v souladu s projektovou dokumentací a rozhodnutím ČIŽP. Cílem prací je sledování kvality podzemí a povrchové vody v areálu společnosti SPOLANA s.r.o. a v jeho okolí s průběžným a celkovým vyhodnocením prací včetně zpracování AAR.
Détails de la procédure
- Date de publication
- 27 Aug 2026
- Langues
- Czech
Métadonnées de référence
- Base juridique
- 32014L0024
Identifiants de référence
- ID de l'appel d'offres
- 593405-2026
Documents (1)
Appels d'offres similaires
Score d'opportunité
Pourquoi ce score ?
Opportunité
55 / 100
Complexité
62 / 100
Facteurs de risque
The estimated contract value is absent, so commercial viability, resource allocation, and price positioning cannot be a...
The detailed monitoring obligations depend on the April 2026 project documentation and a ČIŽP decision, neither of whic...
Analyse approfondie du portefeuille
Utilise:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications