Road design, technical assistance and road works for DJ229A modernization

JUDETUL TULCEA·Tulcea, Romania·RON 62.9M | EUR 12M·Deadline Sep 15, 2026 · 25 days left·Open·Works
High value
Titre original de l'avis

Romania – Road construction works – Servicii de proiectare, asistență tehnica din partea proiectantului şi executie de lucrari la obiectivul de investitii: "Modernizare infrastructura de transport regional pe traseul Cataloi – Frecatei – Posta – Telita – INT. DN22 (DJ229A)”

66/100

Score d'opportunité

Needs reviewHigh complexity
WorksOpen
Pourquoi ce score ?

Opportunité

66 / 100

Complexité

78 / 100

Facteurs de risque

Procurement documents are available via the notice URL, but only XML notice text was provided and analyzed; the detaile...

Several quality criteria require at least 3 similar contracts for key personnel; falling below the minimum makes the of...

Analyse approfondie du portefeuille

Analyse approfondie de l'adéquation entreprise

Utilise:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Aperçu

Moderate opportunity

Faits clés

  • RON 62.9M estimated value
  • Works contract
  • 1 lot
  • Duration 28 MONTH
  • Design services for modernization of the regional transport infrastructure route Cataloi – Frecatei – Posta – Telita – INT. DN22 (DJ229A).
  • Technical assistance from the designer during execution.
Afficher le résumé complet

Open procedure for a works contract in Romania for design services, designer technical assistance, and execution of road modernization works on the Cataloi – Frecatei – Posta – Telita – INT. DN22 (DJ229A) route in Tulcea County. The notice indicates one default lot, electronic submission is required, and the contract is EU-funded. The estimated value is RON 62,936,778.27 and the duration is 28 months. Key award factors combine price and several quality criteria, including extensive personnel experience requirements and a work methodology/Gantt plan. Procurement documents are available via the notice URL, but only XML notice text was analyzed, not full procurement documents.

Risques

Procurement documents are available via the notice URL, but only XML notice text was provided and analyzed; the detaile...

Several quality criteria require at least 3 similar contracts for key personnel; falling below the minimum makes the of...

L'analyse peut être incomplète

Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.

Exigences clés

Technical

  • The contract duration is 28 months.

Administrative

  • Electronic submission is required.
  • Questions/clarifications may be requested up to 21 days before the submission deadline; the authority will answer clarifications 14 days before the deadline if submitted in time.

Critères d'attribution

Lot 1

Price - 40% (per-exa)40%Quality - works warranty period - 10% (per-exa)10%Quality - implementation methodology and Gantt schedule - 15% (per-exa)15%Quality - project design coordinator experience - 5% (per-exa)5%Quality - specialist engineer experience - 5% (per-exa)5%Quality - quantity surveyor experience - 5% (per-exa)5%Quality - topographic engineer experience - 5% (per-exa)5%Quality - project manager experience - 5% (per-exa)5%Quality - road site manager experience - 5% (per-exa)5%Quality - bridge site manager experience - 5% (per-exa)5%

Acheteur

Localisation

Tulcea, ROU

Profil acheteur

Ouvrir le profil

Identifiant

4321607

Activité

General public services

Lots (1)

LOT-0000

Road design, technical assistance and road works for DJ229A modernization

Single default lot covering design services, technical assistance from the designer, and execution of works for the modernization of the regional transport infrastructure on the Cataloi – Frecatei – Posta – Telita – INT. DN22 (DJ229A) route. The lot is for works, with road construction and bridge-related scope indicated by CPV codes. The estimated value is RON 62,936,778.27 and the duration is 28 months. Submission is electronic and performance is in Romania, Tulcea County (RO225).

WorksEU fundedElectronic submission

EUR 12M

Valeur estimée

Localisation

RO225, Romania

Durée

28 MONTH

Catégorie

Road construction works

Critères d'attribution

Best price-quality ratio

Date limite

Deadline Sep 15, 2026

Détails de la procédure

Date de publication
09 Aug 2026
Langues
Romanian

Métadonnées de référence

Base juridique
32014L0024

Identifiants de référence

ID de l'appel d'offres
550390-2026

Documents (2)