Supply of materials and full construction of the 400kV overhead line from KYT Neas Santas to KYT Philippon

ΑΝΕΞΑΡΤΗΤΟΣ ΔΙΑΧΕΙΡΙΣΤΗΣ ΜΕΤΑΦΟΡΑΣ ΗΛΕΚΤΡΙΚΗΣ ΕΝΕΡΓΕΙΑΣ Α.Ε. (ΑΔΜΗΕ Α.Ε.)·ΑΘΗΝΑ, Greece·EUR 75M·Deadline Aug 21, 2026 · 0 days left·Open·Works
High value
Titre original de l'avis

Greece – Installation of cable laying – Προμήθεια υλικών και πλήρης κατασκευή της εναέριας Γ.Μ. 400kV ΚΥΤ ΝΕΑΣ ΣΑΝΤΑΣ – ΚΥΤ ΦΙΛΙΠΠΩΝ

63/100

Score d'opportunité

Needs reviewHigh complexity
WorksOpen
Pourquoi ce score ?

Opportunité

63 / 100

Complexité

72 / 100

Facteurs de risque

The structured data gives a submission deadline of 2026-08-21T17:00:00Z, while the XML notice also contains end date/ti...

Document URLs are present, but no procurement document text other than the XML notice was provided, so detailed technic...

Submission deadline in 0 days

Analyse approfondie du portefeuille

Analyse approfondie de l'adéquation entreprise

Utilise:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Aperçu

Moderate opportunity

Faits clés

  • EUR 75M estimated value
  • Works contract
  • 1 lot
  • Supply of materials and full construction of the overhead 400kV line between KYT Neas Santas and KYT Philippon.
  • Works classification in CPV 45314310 (Installation of cable laying) as provided in the notice data.
Afficher le résumé complet

Open works tender by ΑΔΜΗΕ A.E. for supply of materials and full construction of the overhead 400kV line between KYT Neas Santas and KYT Philippon, with electronic submission required. The structured data indicates a total estimated value of EUR 75,000,000. The notice text also shows an electronic auction and a lot-level tender deadline of 2026-08-21 17:00 UTC, with auction occurrence on 2026-08-31 15:00 local time in the XML, but the lot data is incomplete on several points.

Risques

The structured data gives a submission deadline of 2026-08-21T17:00:00Z, while the XML notice also contains end date/ti...

Document URLs are present, but no procurement document text other than the XML notice was provided, so detailed technic...

Submission deadline in 0 days

L'analyse peut être incomplète

Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.

Exigences clés

Technical

  • Award is based exclusively on the lowest price.
  • An electronic auction is indicated in the XML notice.

Administrative

  • Electronic submission is required.

Critères d'attribution

Lot 1

Price criterion: lowest price only, electronic auction.

Acheteur

Localisation

ΑΘΗΝΑ, GRC

Site web

www.admie.gr

Profil acheteur

Ouvrir le profil

Identifiant

1031.F01175.0001

Activité

Electricity-related activities

Lots (1)

LOT-0001

Supply of materials and full construction of the 400kV overhead line from KYT Neas Santas to KYT Philippon

Single works lot for supply of materials and full construction of the overhead 400kV line between KYT Neas Santas and KYT Philippon. The scope comes from structured data and indicates a construction/installation package rather than a supply-only contract.

WorksElectronic submission

EUR 75M

Valeur estimée

Localisation

EL302, Greece

Catégorie

Installation of cable laying

Critères d'attribution

Price

Date limite

Deadline Aug 21, 2026

Détails de la procédure

Date de publication
27 Jul 2026
Langues
Greek

Métadonnées de référence

Base juridique
32014L0025

Identifiants de référence

ID de l'appel d'offres
519245-2026

Documents (1)

Appels d'offres similaires