Pack batterie avec services d'exploitation
Titre original de l'avis
Norway – Accumulators, primary cells and primary batteries – Battery pack with operational services and market optimisation.
Score d'opportunité
Pourquoi ce score ?
Opportunité
56 / 100
Complexité
76 / 100
Facteurs de risque
The requirement specification, contract terms, pricing documents and detailed award methodology were not provided, so m...
The structured data states a submission deadline of 17 August 2026, while the XML extraction also contains 1 September...
Analyse approfondie du portefeuille
Utilise:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Informations clés
- Pouvoir adjudicateur
- Returkraft AS
- Pays
- Norvège
- CPV
- 31400000 - Accumulators, primary cells and primary batteries +1 autres
- Date limite
- Aug 17, 2026
- Valeur estimée
- NOK 20M (approx. EUR 1.8M)
Aperçu
Moderate opportunityFaits clés
- NOK 20M estimated value
- Supplies contract
- 1 lot
- Duration 48 MONTH
- Engineering design of a complete battery-based energy storage system.
- Delivery, installation, testing and commissioning at Returkraft’s facility in Norway.
Afficher le résumé complet
Open procedure for the design, supply, installation, testing, commissioning and documentation of a complete battery energy storage system at Returkraft’s facility in Norway, including operational services and market optimisation. The structured data identifies one lot, a value of NOK 20,000,000, mandatory electronic submission, Norwegian as the stated language, and a deadline of 17 August 2026 at 10:00. The procurement documents and detailed requirements were not provided for analysis. The structured data also marks the procurement as EU-funded, while the XML notice states no EU funds, creating an inconsistency requiring clarification.
Risques
The requirement specification, contract terms, pricing documents and detailed award methodology were not provided, so m...
The structured data states a submission deadline of 17 August 2026, while the XML extraction also contains 1 September...
L'analyse peut être incomplète
Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.
Exigences clés
Technical
- Open procedure.
Administrative
- Electronic submission is required through the Mercell submission channel.
- The structured data states Norwegian as the tender language.
Les exigences peuvent être incomplètes.
Acheteur
Localisation
KRISTIANSAND S, NOR
Profil acheteur
Identifiant
991590463
Activité
Environmental protection
Lots (1)
LOT-0000
Battery Pack with Operational Services and Market Optimisation
Engineering design, delivery, installation, testing, commissioning and documentation of a complete battery-based energy storage system at Returkraft’s facility, with operational services and market optimisation. The agreement is stated to have an initial one-year duration with three optional one-year extensions. The structured data marks it as a framework agreement, but no framework maximum value is provided.
EUR 1.8M
Valeur estimée
Localisation
Durée
Catégorie
Date limite
Détails des critères
Returkraft would like to enter into a contract with a tenderer for engineering design services, delivery, installation, testing, commissioning and documentation of a complete battery based energy storage system on Returkraft ́s facility. The assignment is further described in point 2 of Appendix A - Requirement Specifications. The agreement shall have a duration of one (1) year, with an option for additional three (1+1+1) years, if Returkraft so wishes. Welcome to the competition!
Codes CPV supplémentaires
Note sur la valeur
Afficher les données TED originales
Titre original du lot
Battery pack with operational services and market optimisation.
Description TED originale
Returkraft would like to enter into a contract with a tenderer for engineering design services, delivery, installation, testing, commissioning and documentation of a complete battery based energy storage system on Returkraft ́s facility. The assignment is further described in point 2 of Appendix A - Requirement Specifications. The agreement shall have a duration of one (1) year, with an option for additional three (1+1+1) years, if Returkraft so wishes. Welcome to the competition!
Détails de la procédure
- Date de publication
- 09 Jul 2026
- Langues
- English, Norwegian
Métadonnées de référence
- Base juridique
- 32014L0024
Identifiants de référence
- ID de l'appel d'offres
- 479132-2026
Documents (1)
Appels d'offres similaires
Germany – Electrical wiring and fitting work – Lieferung, Montage und Inbetriebnahme Batteriespeichersystem (BESS)
Poland – Electricity, heating, solar and nuclear energy – Odnawialne źródła energii w Klastrze Energii Powiatu Myszkowskiego - Zakup i montaż instalacji OZE w Gminie Żarki
Slovakia – Construction work – Rekonštrukcia internátu – stavebné práce
Sweden – Solar panel roof-covering work – Dynamiskt inköpssystem Solenergi och energilagring
Score d'opportunité
Pourquoi ce score ?
Opportunité
56 / 100
Complexité
76 / 100
Facteurs de risque
The requirement specification, contract terms, pricing documents and detailed award methodology were not provided, so m...
The structured data states a submission deadline of 17 August 2026, while the XML extraction also contains 1 September...
Analyse approfondie du portefeuille
Utilise:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications