BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station (V2).
Titre original de l'avis
Norway – Pipeline, piping, pipes, casing, tubing and related items – BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station (V2).
Score d'opportunité
Pourquoi ce score ?
Opportunité
60 / 100
Complexité
70 / 100
Facteurs de risque
Award criteria in structured data are incomplete; actual weightings (price 55%, climate/environment 30%, implementation...
No procurement documents provided for analysis; tender may contain critical requirements not captured in notice.
Submission deadline in 0 days
Analyse approfondie du portefeuille
Utilise:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Aperçu
Moderate opportunityFaits clés
- NOK 95M estimated value
- Supplies contract
- 1 lot
- Duration 46 MONTH
- Construction of a raw water pump station
- Execution of pipelines from ENT2 to ENT3 (land pipeline contract)
Afficher le résumé complet
This tender concerns the construction of a raw water pump station and associated pipelines as part of a backup water supply system for Gjøvik and Biri municipalities in Norway. The project is a negotiated procedure with call for competition, with a single lot covering the pump station and pipeline work. The estimated value is 95,000,000 NOK (not specified if excluding VAT). The deadline for submission is 2026-08-21T11:00:00Z. The tender notice is incomplete in structured data regarding award criteria and selection criteria, but additional details are found in the XML notice.
Risques
Award criteria in structured data are incomplete; actual weightings (price 55%, climate/environment 30%, implementation...
No procurement documents provided for analysis; tender may contain critical requirements not captured in notice.
Submission deadline in 0 days
No procurement documents available
L'analyse peut être incomplète
Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.
Exigences clés
Technical
- Contract duration: 46 months
- EU-funded project
Administrative
- Tender must be submitted electronically via Artifik platform
Les exigences peuvent être incomplètes.
Critères d'attribution
Lot 1
Acheteur
Localisation
Gjøvik, NOR
Site web
Profil acheteur
Identifiant
940155223
Activité
General public services
Lots (1)
LOT-0001
BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station (V2).
Establishment of a raw water pump station and execution of pipelines from ENT2 up to the land pipeline contract (ENT3), as part of Stage 2 of the backup water system. Scope includes waterproof concrete constructions, deep sheet pitting, pressurised stainless steel pipes, pump installation, and steel pipes.
EUR 8.5M
Valeur estimée
Localisation
Durée
Catégorie
Critères d'attribution
Date limite
Détails des critères
Price
Codes CPV supplémentaires
Note sur la valeur
Afficher les données TED originales
Description TED originale
Gjøvik municipality is responsible for ensuring a safe and stable delivery of drinking water to the inhabitants of the municipality. In order to strengthen security of supply, it has been decided to establish a full-fledged back-up water system that can supply both Biri and Gjøvik. Stage 1 of the project included the establishment of an submarine pipeline from Gjøvik to Redalen, the construction of a pressure increase station, as well as establishing a connection point for continuing the pipeline towards Biri. The sea pipeline was lowered in Mjøsa in autumn 2020, and after completion of the pump station the facility was put into operation in 2021. In stage 2 the pipeline shall be continued from Redalen to Biri, where both a raw water pump station and a new water treatment plant shall be established. In this contract, the establishment of a raw water pump station with the execution of pipelines from ENT2 up until the land pipeline contract ("ENT3") shall be executed.
Détails de la procédure
- Date de publication
- 09 Jul 2026
- Langues
- English, Norwegian
Métadonnées de référence
- Base juridique
- 32014L0025
Identifiants de référence
- ID de l'appel d'offres
- 476816-2026
Documents (1)
Appels d'offres similaires
Poland – Road construction works – Rozbudowa drogi krajowej nr 22 na odcinku Malbork -Królewo
Switzerland – Construction work for water and sewage pipelines – CERM - Centre d'entretien routier des montagnes - La Chaux-de-Fonds - LOT GC01_Réseaux - CFC 13, 452, 453.2,454, 455.2, 456, 463, 465
Norway – Construction work – Tradesman services - Plumbing for Midt-Telemark and Nome municipalities.
Denmark – Construction work – Opførelse af bygværker til Kalundborg Central Renseanlæg F1.BA.01
France – Drinking-water treatment plant construction work – Marché de travaux dans le cadre de construction de l’UTEP de la Technopole et la reconfiguration des adductions des ressources de l’Est sur le territoire de la Commune de Saint Denis
Sweden – Flatwork – Mark- och VA arbeten
Score d'opportunité
Pourquoi ce score ?
Opportunité
60 / 100
Complexité
70 / 100
Facteurs de risque
Award criteria in structured data are incomplete; actual weightings (price 55%, climate/environment 30%, implementation...
No procurement documents provided for analysis; tender may contain critical requirements not captured in notice.
Submission deadline in 0 days