Transmission line construction work

E.ON Észak-dunántúli Áramhálózati Zrt.·Győr, Hungary·Expired · Aug 10, 2026·Open·Works
Structured notice only
Titre original de l'avis

Hungary – Construction work – Távvezeték-kivitelezés IV. ütem – 3 részben (ism.)

62/100

Score d'opportunité

Needs reviewHigh complexity
WorksExpired
Pourquoi ce score ?

Opportunité

62 / 100

Complexité

78 / 100

Facteurs de risque

The structured data deadline is 2026-08-10 09:00 UTC, while the XML notice shows EndTime 11:00:00+02:00, which is consi...

Procurement documents are referenced by URL, but no extracted document text was provided, so the contract draft and tec...

Analyse approfondie du portefeuille

Analyse approfondie de l'adéquation entreprise

Utilise:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Informations clés

Pouvoir adjudicateur
E.ON Észak-dunántúli Áramhálózati Zrt.
Pays
Hongrie
CPV
45100000 - Site preparation work +6 autres
Date limite
Aug 10, 2026

Aperçu

Moderate opportunity

Faits clés

  • Works contract
  • 3 lots
  • Construction of a 132 kV transmission line between Zirc and Észak-Litér in three separate lots.
  • Lot 1: foundation works for transmission line towers, including archaeological excavation and full demining.
Afficher le résumé complet

This is an open works tender for the construction of the Zirc–Észak-Litér 132 kV overhead line in 3 lots: foundations, tower erection/assembly, and wiring/ground cable laying. The notice is in Hungarian, electronic submission is required, and the deadline is 2026-08-10 09:00 UTC. No contract value is provided in the structured data or XML. The tender has explicit technical and professional eligibility requirements, including references, staff qualifications, registry membership, insurance, HSE, and quality/environment systems. Procurement documents are available via EKR, but no extracted procurement document text was provided, so they were not analyzed.

Risques

The structured data deadline is 2026-08-10 09:00 UTC, while the XML notice shows EndTime 11:00:00+02:00, which is consi...

Procurement documents are referenced by URL, but no extracted document text was provided, so the contract draft and tec...

L'analyse peut être incomplète

Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.

Exigences clés

Technical

  • The contractor must provide a technical-financial schedule.

Administrative

  • Electronic submission is required.
  • The notice language is Hungarian.

Les exigences peuvent être incomplètes.

Critères d'attribution

Lot 1

Quality criterion: additional warranty period, weight 15, weight code poi-exa. — 15%

Lot 2

Quality criterion: expert experience beyond eligibility, weight 15, weight code poi-exa. — 15%

Lot 3

Price criterion: net contract price excluding reserve fund, weight 70, weight code poi-exa. — 70%

Acheteur

Localisation

Győr, HUN

Site web

www.eon.com

Profil acheteur

Ouvrir le profil

Identifiant

10741980208

Activité

Electricity-related activities

Lots (3)

LOT-0001

Foundations for Zirc–Észak-Litér line

Lot 1 covers construction of foundation works for the 132 kV Zirc–Észak-Litér transmission line. The scope includes use of buyer-provided materials/equipment from the technical specification, procurement of missing materials by the contractor, complete archaeological excavation work, and full demining. The route crosses several Veszprém county settlements. The lot duration is 140 working days, excluding 15 December to 15 January.

WorksEU fundedElectronic submissionSME suitable

Localisation

Zirc Észak-Litér közötti nyomvonal, Hungary

Durée

140 DAY

Catégorie

Site preparation work

Critères d'attribution

Quality

Date limite

Expired Aug 10, 2026

LOT-0002

Tower erection and assembly for Zirc–Észak-Litér line

Lot 2 covers tower erection and assembly works for the 132 kV Zirc–Észak-Litér transmission line. The contractor must use buyer-provided materials/equipment from the technical specification and procure any missing materials/equipment. The route crosses several Veszprém county settlements. The lot duration is 122 working days, excluding 15 December to 15 January.

WorksEU fundedElectronic submissionSME suitable

Localisation

Zirc Észak-Litér közötti nyomvonal, Hungary

Durée

122 DAY

Catégorie

Assembly of metal structures

Critères d'attribution

Quality

Date limite

Expired Aug 10, 2026

LOT-0003

Wiring and ground cable laying for Zirc–Észak-Litér line

Lot 3 covers wiring and ground cable laying works for the 132 kV Zirc–Észak-Litér transmission line. The scope includes a 21.2 km overhead section and a 1.1 km underground cable section, with specified conductor and optical cable types, plus post-completion operating and HIF permit procedures. The route crosses several Veszprém county settlements. The lot duration is 99 working days, excluding 15 December to 15 January.

WorksEU fundedElectronic submissionSME suitable

Localisation

Zirc Észak-Litér közötti nyomvonal, Hungary

Durée

99 DAY

Catégorie

Construction work

Critères d'attribution

Price

Date limite

Expired Aug 10, 2026

Détails de la procédure

Date de publication
08 Jul 2026
Langues
Hungarian

Métadonnées de référence

Base juridique
32014L0025

Identifiants de référence

ID de l'appel d'offres
475172-2026