Construction and assembly works for the task: Construction of 110/15 kV power substation GPZ Świercze

ENERGA-OPERATOR S.A.·Gdańsk, Poland·Expired · Aug 20, 2026·Open·Works
Structured notice only
Titre original de l'avis

Poland – Construction work – Wykonanie robót budowlano-montażowych dla zadania: Budowa stacji elektroenergetycznej 110/15 kV GPZ Świercze

60/100

Score d'opportunité

Needs reviewHigh complexity
WorksExpired
Pourquoi ce score ?

Opportunité

60 / 100

Complexité

85 / 100

Facteurs de risque

No estimated value or framework maximum is disclosed, making it impossible to gauge project budget or prepare a competi...

Bid bond of 500,000 PLN may strain liquidity, especially for SMEs.

No procurement documents available

Analyse approfondie du portefeuille

Analyse approfondie de l'adéquation entreprise

Utilise:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Aperçu

Moderate opportunity

Faits clés

  • Works contract
  • 1 lot
  • Duration 22 MONTH
  • Macro-nivelation of terrain
  • Construction of substation fencing
Afficher le résumé complet

This is an open tender by ENERGA-OPERATOR S.A. for the construction of a 110/15 kV power substation GPZ Świercze in Klukowo, Poland. The scope includes civil works, supply and installation of two 31.5 MVA transformers, HV and MV switchgear, telemechanics, and related infrastructure. The project is EU-funded (FEnIKS) and the award is based 100% on price. No partial bids are allowed. The estimated value is not disclosed. The deadline for submission is 20 August 2026 at 10:00 CEST.

Risques

No estimated value or framework maximum is disclosed, making it impossible to gauge project budget or prepare a competi...

Bid bond of 500,000 PLN may strain liquidity, especially for SMEs.

No procurement documents available

L'analyse peut être incomplète

Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.

Exigences clés

Technical

  • All materials, software, products and equipment must originate from EU Member States or GPA signatory countries, determined per Regulation (EU) No 952/2013.
  • No ICT products, services or processes listed in the recommendation of the Government Plenipotentiary for Cybersecurity (negative impact on state security) may be used.
  • No ICT products from high-risk suppliers designated by the minister for computerization may be used.

Les exigences peuvent être incomplètes.

Critères d'attribution

Lot 1

100% price – lowest price formula100%

Acheteur

Localisation

Gdańsk, POL

Profil acheteur

Ouvrir le profil

Identifiant

NIP 5830001190

Activité

General public services

Lots (1)

LOT-0001

Construction and assembly works for the task: Construction of 110/15 kV power substation GPZ Świercze

Complete construction of a new 110/15 kV substation including site preparation, fencing, earthing/lightning protection, HV outdoor switchyard (H5 configuration), two transformer bays, cable trenches, supply and installation of two 31.5 MVA transformers, 15 kV cable bridges, access roads, lighting, water connection, technical building with 20-field MV switchgear, auxiliary systems, telemechanics and communication (TETRA tower), technical security system, modifications at Ciechanów and Nasielsk substations, post-installation tests and commissioning. Equipment must comply with EU origin requirements and cybersecurity restrictions. Investor provides an SF6 insulated coupling module that must be energized before 1 Jan 2028.

WorksEU fundedElectronic submissionSME suitable

Localisation

Klukowo, Poland

Durée

22 MONTH

Catégorie

Construction work

Critères d'attribution

Price

Date limite

Expired Aug 20, 2026

Détails de la procédure

Date de publication
08 Jul 2026
Langues
Polish

Métadonnées de référence

Base juridique
32014L0024

Identifiants de référence

ID de l'appel d'offres
474039-2026

Documents (1)

Appels d'offres similaires