Tenderwize
Retour à la recherche

H2G Hydrogen System

Hochschule Reutlingen·Reutlingen, Germany·Expired · Aug 01, 2026·Neg W Call·Supplies
Structured notice only
Titre original de l'avis

Germany – Fuel cells – H2G Wasserstoffsystem

55/100

Score d'opportunité

Needs reviewHigh complexity
SuppliesExpired
Pourquoi ce score ?

Opportunité

55 / 100

Complexité

75 / 100

Facteurs de risque

No estimated contract value; budget allocation unknown. May lead to resource misallocation or disqualification if bid e...

Submission deadline is only about 23 days from publication; complex technical proposals require significant preparation...

Analyse approfondie du portefeuille

Analyse approfondie de l'adéquation entreprise

Utilise:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Aperçu

Moderate opportunity

Faits clés

  • Supplies contract
  • 1 lot
  • Planning, construction, delivery, integration, commissioning, and acceptance of a hydrogen electrolysis and fuel cell system
  • Integration into existing energy systems at the KST site in Tübingen
Afficher le résumé complet

This tender by Hochschule Reutlingen seeks a turnkey hydrogen system (electrolysis and fuel cell) for a real-world laboratory (H2-Grid project). It is a competitive negotiated procedure with a two-stage selection: shortlisting based on references (max 5 bidders), then invitation to tender. Award criteria are price (50%) and technical quality (50%) with detailed sub-criteria and minimum scores. No estimated value is provided. The procurement documents are available but were not analyzed. The tender is suitable for SMEs/startups, but the deadline is tight (approx. 23 days from publication) and the technical requirements are complex.

Risques

No estimated contract value; budget allocation unknown. May lead to resource misallocation or disqualification if bid e...

Submission deadline is only about 23 days from publication; complex technical proposals require significant preparation...

L'analyse peut être incomplète

Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.

Exigences clés

Technical

  • Turnkey delivery of a complete hydrogen generation and utilization system
  • System must be fully operational and accepted
  • Compliance with safety, approval, and acceptance requirements (e.g., TÜV, fire protection)

Les exigences peuvent être incomplètes.

Critères d'attribution

Lot 1

Price score (50% weight)50%Quality composite score (50% weight) with mandatory minimum thresholds50%

Acheteur

Localisation

Reutlingen, DEU

Identifiant

0049 7121 271 7013

Activité

Education

Lots (1)

LOT-0001

H2G Hydrogen System

Planning, construction, delivery, integration, commissioning, and acceptance of a hydrogen production (electrolysis) and fuel cell system as part of a real-world laboratory at the KST site in Tübingen. The system must be fully operational and accepted by the project end (30 June 2027), with invoicing by 31 May 2027.

SuppliesEU fundedElectronic submissionSME suitable

Localisation

Reutlingen, Germany

Catégorie

Fuel cells

Critères d'attribution

Best price-quality ratio

Date limite

Expired Aug 01, 2026

Détails de la procédure

Date de publication
08 Jul 2026
Langues
German

Métadonnées de référence

Base juridique
32014L0024

Identifiants de référence

ID de l'appel d'offres
473158-2026

Documents (2)

Appels d'offres similaires