Furniture and fit-out for Lots 7 and 8
Titre original de l'avis
Italy – Building completion work – Centro Formazione San Maurizio - Lotti 7 e 8 - Arredo - L+F - 04_26
Score d'opportunité
Pourquoi ce score ?
Opportunité
68 / 100
Complexité
52 / 100
Facteurs de risque
The tender notice points to procurement documents, but only the XML notice was provided, not the full documents.
Structured data lists only price weight 20, while the XML notice adds quality weight 80. This suggests incomplete or in...
Submission deadline in 12 days
Analyse approfondie du portefeuille
Utilise:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Aperçu
Moderate opportunityFaits clés
- EUR 4.7M estimated value
- Works contract
- 1 lot
- Duration 180 DAY
- Building completion works and supply of furniture/equipment for Centro Formazione San Maurizio in Bolzano.
- The notice refers to lots 7 and 8 for student housing (studentato) furnishing.
Afficher le résumé complet
Open procedure for works and supply relating to the Centro Formazione San Maurizio in Bolzano, covering lots 7 and 8 for student housing furniture/equipment. The structured data and XML both indicate an estimated overall value of EUR 4,726,650, with electronic submission required and a submission deadline on 2026-09-07 10:00 UTC (12:00 local time in the XML). Procurement documents are available via the indicated portal, but only the XML notice text was provided, not the full tender documents.
Risques
The tender notice points to procurement documents, but only the XML notice was provided, not the full documents.
Structured data lists only price weight 20, while the XML notice adds quality weight 80. This suggests incomplete or in...
Submission deadline in 12 days
L'analyse peut être incomplète
Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.
Exigences clés
Technical
- Open procedure.
Administrative
- Electronic submission is required.
- Procurement language is Italian (ITA) in structured data; XML notice also contains Italian and German text.
Critères d'attribution
Lot 1
Acheteur
Nom
AUTONOME PROVINZ BOZEN – SÜDTIROL Abteilung - Hochbau und technischer Dienst Amt für Sanitätsbauten
Localisation
Bolzano / Bozen, ITA
Identifiant
00390090215
Activité
General public services
Lots (1)
LOT-0001
Furniture and fit-out for Lots 7 and 8
Open procedure for works and supply for Centro Formazione San Maurizio, specifically lots 7 and 8 for student housing furnishing/equipment. The lot combines building completion work and furniture/equipment supply, based on the structured data and XML notice.
EUR 4.7M
Valeur estimée
Durée
Catégorie
Critères d'attribution
Date limite
Détails des critères
Preis
Codes CPV supplémentaires
Note sur la valeur
Afficher les données TED originales
Titre original du lot
Centro Formazione San Maurizio - Los 7 und 8 - Einrichtung - A+L - 04_26
Description TED originale
Offenes Verfahren von BAUARBEITEN UND LIEFERUNG - Bildungszentrum Moritzing, Los 7 und Los 8 Studentenheime - EINRICHTUNG
Détails de la procédure
- Date de publication
- 08 Jul 2026
- Langues
- Italian
Métadonnées de référence
- Base juridique
- 32014L0024
Identifiants de référence
- ID de l'appel d'offres
- 472290-2026
Documents (1)
Appels d'offres similaires
France – Restructuring work – RESTRUCTURATION DES ARCHIVES DEPARTEMENTALES DE LA HAUTE-GARONNE - 11 et 14 BOULEVARD GRIFFOUL DORVAL A TOULOUSE - TRAVAUX 8 LOTS
France – Furniture – ACQUISITION DE MOBILIER ADMINISTRATIF D'EQUIPEMENT D'ASSISES ET DE MOBILIER POUR MANIFESTATION ET D'EXPOSITION ET PRESTATIONS ASSOCIEES (3 LOTS)
France – Construction work – Travaux preneurs de l'immeuble A6 situé à Paris
Norway – Construction work – 29094 Myklebust nursery school - turnkey contract
France – Cultural event organisation services – Location de matériels évènementiels pour les manifestations du Département
Belgium – Building completion work – Exécution de différents types de travaux dans les bâtiments du New Samusocial ASBL
Score d'opportunité
Pourquoi ce score ?
Opportunité
68 / 100
Complexité
52 / 100
Facteurs de risque
The tender notice points to procurement documents, but only the XML notice was provided, not the full documents.
Structured data lists only price weight 20, while the XML notice adds quality weight 80. This suggests incomplete or in...
Submission deadline in 12 days
Analyse approfondie du portefeuille
Utilise:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications