Tenderwize
Retour à la recherche

Design and Construction of S19 Expressway Section 2

Generalna Dyrekcja Dróg Krajowych i Autostrad·Lublin, Poland·Deadline Sep 15, 2026 · 25 days left·Open·Works
Titre original de l'avis

Poland – Construction, foundation and surface works for highways, roads – Projekt i budowa drogi ekspresowej S19 na odcinku granica woj. podlaskiego – Łosice – granica woj. lubelskiego, odc. realizacyjny nr 2: węzeł „Łosice” (z węzłem) – granica woj. lubelskiego

61/100

Score d'opportunité

Needs reviewHigh complexity
WorksOpen
Pourquoi ce score ?

Opportunité

61 / 100

Complexité

86 / 100

Facteurs de risque

Submission must be electronic through the indicated platform; failure to use the correct channel may invalidate the ten...

The turnover, liquidity, experience, and personnel thresholds are substantial and may exclude many bidders.

Analyse approfondie du portefeuille

Analyse approfondie de l'adéquation entreprise

Utilise:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Aperçu

Moderate opportunity

Faits clés

  • Works contract
  • 1 lot
  • Duration 47 MONTH
  • Design and construction of a dual carriageway expressway section S19.
  • Construction of junctions and related road infrastructure.
Afficher le résumé complet

Open Polish works contract for design and construction of expressway S19 section from Łosice junction to the Lublin voivodeship border. Single lot, electronic submission required via the GDDKiA platform. The notice indicates a very large estimated value (above EUR 20 million), but no exact contract value is provided in the structured data or XML. Key participation conditions include high turnover, liquidity, prior road/bridge experience, a qualified site manager, a 5,000,000 PLN bid bond, and mandatory in-house performance of the main pavement works.

Risques

Submission must be electronic through the indicated platform; failure to use the correct channel may invalidate the ten...

The turnover, liquidity, experience, and personnel thresholds are substantial and may exclude many bidders.

L'analyse peut être incomplète

Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.

Exigences clés

Technical

  • Bid bond of 5,000,000 PLN is required.

Administrative

  • Electronic submission is required.
  • Communication takes place via the platform at Ouvrir le portail

Critères d'attribution

Lot 1

Price, 60% (per-exa)60%

Acheteur

Localisation

Lublin, POL

Identifiant

8971770779

Activité

General public services

Lots (1)

LOT-0001

Design and Construction of S19 Expressway Section 2

Design and build of a dual carriageway expressway S19 in Mazowieckie region (Łosice county; Łosice, Olszanka and Huszlew communes), including roadworks, junctions, road relocations, supporting roads, engineering structures, ground improvement, drainage, fencing, traffic safety equipment, environmental protection measures, and utility relocations. The contracting authority reserves personal execution of the main carriageway pavement works and related pavement layers above native soil/fill, excluding materials and services.

WorksEU fundedElectronic submission

Localisation

PL814, Poland

Durée

47 MONTH

Catégorie

Construction

Critères d'attribution

Price

Date limite

Deadline Sep 15, 2026

Détails de la procédure

Date de publication
07 Jul 2026
Langues
Polish

Métadonnées de référence

Base juridique
32014L0024

Identifiants de référence

ID de l'appel d'offres
468540-2026

Documents (1)

Appels d'offres similaires