Laying of Telecommunications Cable with Adjustment of Cable Route, Construction Phase 1, Route 4000, km 209.1-214.3

DB InfraGO AG – Geschäftsbereich Fahrweg (Bukr 16)·Frankfurt Main, Germany·Deadline Sep 12, 2026 · 17 days left·Open·Works
Structured notice only
Titre original de l'avis

Germany – Installation of cable infrastructure – Verlegung TK-Kabel mit Anpassung Kabelweg, BA 1, Streck 4000, km 209,1-km 214,3

40/100

Score d'opportunité

Needs reviewMedium complexity
WorksOpen
Pourquoi ce score ?

Opportunité

40 / 100

Complexité

50 / 100

Facteurs de risque

The project is contingent on obtaining a planning approval (Planfeststellungsbeschluss) that has not yet been issued. I...

Bidders with ties to specified engineering firms may be excluded. This could disqualify companies that have previous re...

Analyse approfondie du portefeuille

Analyse approfondie de l'adéquation entreprise

Utilise:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Aperçu

Moderate opportunity

Faits clés

  • Works contract
  • 1 lot
  • Duration until Dec 2027
  • Laying of telecommunications cables (TK-Kabel)
  • Partial adjustment of the cable route
Afficher le résumé complet

This tender, issued by DB InfraGO AG, is for laying telecommunications cables with partial adjustment of the cable route as part of a larger overhead line renewal project (Construction Phase 1, Route 4000, km 209.1-214.3) in Freiburg im Breisgau, Germany. It is an open procedure works contract under EU Directive 2014/25 (sector). The award is based solely on price (100%). The tender includes one lot and requires bidders to meet extensive eligibility criteria, including prequalification by Deutsche Bahn AG for work under railway operations. No estimated value is provided. The project depends on a planning approval that has not yet been obtained, posing a risk of cancellation.

Risques

The project is contingent on obtaining a planning approval (Planfeststellungsbeschluss) that has not yet been issued. I...

Bidders with ties to specified engineering firms may be excluded. This could disqualify companies that have previous re...

L'analyse peut être incomplète

Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.

Exigences clés

Technical

  • Prequalification by Deutsche Bahn AG for cable laying and cable routing systems including civil engineering under railway operation
  • Award based solely on price (100%)

Eligibility

  • Submission of extensive declarations (e.g., no conflicts of interest with designated engineering firms, compliance with EU sanctions, no insolvency, etc.)

Les exigences peuvent être incomplètes.

Critères d'attribution

Lot 1

Price 100%100%

Acheteur

Localisation

Frankfurt Main, DEU

Identifiant

fb197f94-7578-4673-8a57-4642ae120532

Activité

Railway services

Lots (1)

LOT-0001

Laying of Telecommunications Cable with Adjustment of Cable Route, Construction Phase 1, Route 4000, km 209.1-214.3

Laying of telecommunications cables and partial adjustment of the cable route within the scope of overhead line renewal in Freiburg im Breisgau. The project is divided into four construction phases; this lot covers Phase 1 from Freiburg Hbf to Abzw. Leutersberg (km 209.104-214.321). Associated works include modifications to noise barriers and retaining walls.

WorksEU fundedElectronic submission

Localisation

Freiburg im Breisgau, Germany

Durée

Nov 2026 - Dec 2027

Catégorie

Installation of cable infrastructure

Critères d'attribution

Price

Date limite

Deadline Sep 12, 2026

Détails de la procédure

Date de publication
06 Jul 2026
Langues
German

Métadonnées de référence

Base juridique
32014L0025

Identifiants de référence

ID de l'appel d'offres
466592-2026

Documents (1)