Tenderwize
Retour à la recherche

Terminal 1 NODAL Electrification Works

AEROPORTS DE PARIS·TREMBLAY EN FRANCE, France·Deadline Jul 22, 2026 · 6 days left·Neg W Call·Works
Titre original de l'avis

France – High voltage installation work – Aéroport de PARIS - Charles de Gaulle - Electrification du Terminal 1 NODAL

58/100

Score d'opportunité

Needs reviewHigh complexity
WorksOpen
Pourquoi ce score ?

Opportunité

58 / 100

Complexité

78 / 100

Facteurs de risque

The candidacy must be submitted electronically on the buyer portal; missing portal submission or incorrect file content...

A minimum average turnover of EUR 8 million over the last 3 years is required, either individually or at group level de...

Submission deadline in 6 days

Analyse approfondie du portefeuille

Analyse approfondie de l'adéquation entreprise

Utilise:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Aperçu

Moderate opportunity

Faits clés

  • Works contract
  • 1 lot
  • Duration 13 MONTH
  • Electrification works for Terminal 1 NODAL at Paris-Charles de Gaulle Airport.
  • Supply and installation of 10 PCA GP (250 A) units for stands U11 to U16 to meet TEN-T requirements.
Afficher le résumé complet

This is a two-stage negotiated works procedure for electrification of Terminal 1 NODAL at Paris-Charles de Gaulle Airport, with one structured lot and three technical sub-lots described in the notice. The contract is for 13 months, requires electronic submission, and limits the number of candidates invited to tender to six. No contract value is provided in the structured data or XML notice. Procurement documents are available via the buyer portal, but only the notice text was analyzed, not the full tender documents.

Risques

The candidacy must be submitted electronically on the buyer portal; missing portal submission or incorrect file content...

A minimum average turnover of EUR 8 million over the last 3 years is required, either individually or at group level de...

Submission deadline in 6 days

L'analyse peut être incomplète

Seule une partie des documents de consultation a été analysée. Des exigences, certificats ou documents de soumission supplémentaires peuvent exister dans les documents restants.

Exigences clés

Administrative

  • Electronic submission is required via Ouvrir le portail
  • This is a two-phase procedure: first candidacy selection, then invitation to submit an offer for shortlisted candidates.
  • Only a candidature file is expected in phase 1; no offer is to be submitted at that stage.

Acheteur

Localisation

TREMBLAY EN FRANCE, FRA

Profil acheteur

Ouvrir le profil

Identifiant

552016628

Activité

Airport-related activities

Lots (1)

LOT-0001

Terminal 1 NODAL Electrification Works

Single lot for electrification works at Paris-Charles de Gaulle Airport, including 10 PCA GP (250 A) supply to stands U11-U16, reworking GSE power supplies, creation of a HV/LV substation and cable routes, and relocation of 400 Hz converters/reels for code F aircraft. The notice says the lot is split into three technical sub-lots: electricity, infrastructure, and building/HVAC. The mandataire must be the company performing the electricity or infrastructure sub-lot.

WorksEU fundedElectronic submission

Localisation

TREMBLAY EN FRANCE, France

Durée

13 MONTH

Catégorie

High voltage installation work

Date limite

Deadline Jul 22, 2026

Détails de la procédure

Date de publication
06 lip 2026
Langues
French

Métadonnées de référence

Base juridique
32014L0025

Identifiants de référence

ID de l'appel d'offres
465705-2026

Documents (1)

Appels d'offres similaires